river6109
Here we are, at last, a video from Down Under, the next videos will show the capacity of carriages we will be able to squeeze into the sidings (stations), 1 main line will exceed this with 38 carriages hauled by 2 ÖBB Vectrons and I will see if I can add a few more in coming videos.

My son has worked behind the scenes to get everything ready and it looks good, this year we most probably extend the snow modules by 300mm, should have done it at the beginning when we've renewed the modules., we also will extend the single track to a double track and this will give us more track space to have all long trains within the individual station sidings and therefore can run trains automatically, this will happen very soon., enjoy this video until the next time
regards.,

John

please subscribe or a thumb up would be appreciated (Youtube)

[YOUTUBE] https://www.youtube.com/watch?v=vllrnpfwqNg [/YOUTUBE]
Reply 4 0
Bunkerbarge
Superb.  You can't beat a full length train for generating some atmosphere and here you've got a few of them.
Reply 0 0
river6109
Thanks for watching, yes it makes a bit of a difference having longer trains
Reply 0 0
Reply