AHJAY
I note the excellent thread about baseboards that has started recently.

That made me think about tracklaying

I tend to glue rather than pin track for several reasons, and so I notice it when others do the same - the giveaway is often photos of lots of odd items from around the room being used as weights to hold track in place as glue dries.

Having built some larger layouts and many smaller ones that has always seemed a bit awkward to me as there enever seems to be eenough to hand when I need them.

So, when I built the last larger layout I created weights for myself.... about 20 of them.

A dead easy jog, and the cost was close to zero... but even if you did need to buy an odd bit of timber or a brick or two, it will still be very low. Glue brick-to-wood with anything that sticks... its not important really.

They look like this. This size works for me... depending on your scale, you might want to vary the wooden base a bit, but stay with the common house brick as its about right for everything.

Track-Laying Weights.png 

They work perfectly and all being the same, they apply even pressure... which DOES matter.

As track-laying glues (PVA etc) tend to go off quite quickly (fast enough to hold track anyway) when you use the last of them, the first is already "ready to lift" so you can lay them in a mexican wave and just keep going.

No more waiting for glue to dry :-) :-). They stack neatly away somewhere when not in use - or can simply be disposed of.

One last thing... keep a few of them clean on the bottom and they are great for holding laminations together when drying (ie when making buildings etc).

regards

Richard
Reply 0 0
newbryford
I use similar boards/blocks to spread the weight.
Another tip if laying trackbed. If you've unintentionally used too much glue - even if only a tiny amount, it might seep out between joints and stick the "weight boards" to the trackbed. Use a piece of thin plastic between the trackbed and board - I used cut up old carrier bags - to prevent the glue sticking to the board.
I learnt this as I once used some very open/coarse cork sheet and the glue came through between the cork granules.

The weights/plastic bag tip is also good when laying powerbase plates and laminating sheets of styrene.

Cheers,
Mick
Reply 0 0
Paul Ashton Focalplane
I have to admit I use whatever comes to hand,  quite recently I had a row of full wine and olive oil bottles holding down glued track, but then they are local products easily come by (and easily consumed).  At the moment I am using cans of house paint but that will no doubt change when I finish track laying.
Paul Ashton

Penmaenpool in 1959, Gauge O finescale
Reply 0 0
Julian
We are lucky to have a local modern blacksmith.  He took a length of 5 inch wide steel by 10 mm and sliced it into 10 x 8 inch lengths.  Cost slightly more than a London Pint of "Best", at £10.  A dose of Jenolite and Hammerite smooth, job done.

Regards

Julian
Reply 0 0
Bunkerbarge
I started using old batteries that will no longer hold charge, sat on a piece of wood, but found that undulations in level and slight wandering off alignment would still occur.  I now use a piece of machined steel to ensure the best possible straight line both horizontally and vertically.

2063_012220_090000000.jpg 


04-07-18-03RailwayStraightedge1.jpg
Reply 0 0
DonWU
When track laying I prefer to use PVA to glue the sleepers to the board/cork rather than track-pins through the sleepers .
I do make sure that the area to be glued is painted first just in case the track needs to come-up at a later date. This way, the PVA does not stick to the ply/MDF/cork, only the paint and no (or little) damage occurs (to the base board). I try to use as little PVA as possible, relying on the ballasting for the major 'stick-down'.
Immediately the track is glued down I use 'map pins' (those pins with a large-ish head - see below) tapped in BETWEEN the sleepers, not through the sleepers, to hold the track in position. These pins are placed every 5/6cm and initially, not tapped firmly down so any adjustment of track alignment can be made before the PVA sets - you've got about about 20 mins to do this. The pins do not obstruct a visual inspection of the straightness or correct curvature of the track-work - if it looks OK, it is OK!
If the track does needs a bit of adjustment, it's easy to tap the sides of the sleepers before  a final tap of the pin to secure. They are easy to remove 24 hours later

Regards
DonUntitled.jpg 
Reply 0 0
Iain Morrison wimorrison
+1 on the map pins. I Copydex the trackbed and then using the map pins, pushing in by hand every 100mm or so and then giving a little tap with a ball peen hammer. after about 30 mins I can go along and pull out all the pins and the track is solid.

An advantage to Copydex is that when I want to lif the track I just slip a sharp, thin blade under the track (generally a blunt hacksaw blade with a knife edge ground onto it) and 'saw' along the length I want to lift - really easy and I ballast using Copydex also as it doesn't go brick hard like PVA 🙂
Iain Morrison
Modelling h0e using Z21 with iTrain automation and Railcom
There are also unknown unknowns – the ones we don't know we don't know
http://www.wimorrison.com
Reply 0 0
Remymartin
When I laid my track down , because my other half is OCD and likes to bulk buy, I was fortunate to use 50 tins of a well known soup, yes 50. This enabled me to do long lengths and were excellent for doing the radii as the cans fit nicely on the track. 
Reply 1 0
fireman's shovel
Brilliant idea, this will give a uniform weight where you want it especially good for curves.
Reply 0 0
Reply