Paul Ashton Focalplane
I am working on my second open space layout (Penmaenpool in Gauge 0 Finescale) and it seemed that this technique ought to be more widely used for a specific type of layout.  So I have started this topic as an aid to others who might think of building an open space layout.

L Girder designs are perfect for fixed layouts which have plenty of topography - hills, valleys, ravines, etc. - but softer landscapes can also benefit from the design.  The railway runs through the scenery rather than the scenery is built around the railway.  So it is definitely an aid for anyone building a prototype model.  The L Girder system can be used for portable layouts as well, particularly in the smaller scales.

The system uses less timber but is stronger than the conventional "flat earth" baseboard, particularly considering the cost of good quality plywood.  It is also easily modified during the construction stage.  The railway can also benefit from inclines (though I found my inclines were too steep and so easily modified the plan accordingly).

There is a common belief that "any old timber" can be used.  There is some truth in this but well seasoned wood is always important.  So recycling old layouts is possible.

Not having sound enhancing drums as baseboards is also a definite advantage, particularly with DCC Sound becoming more popular.

I hope to address a number of questions about this system in the days weeks and months ahead, using Penmaenpool as the stage but also discussing the planning and execution of an open space layout.  There are some woodworking tools that are really useful, others that will probably not be used, so I will address my preferences.  Track laying and wiring is often easier with the system and finally the scenic areas between the tracks will be discussed.
Paul Ashton

Penmaenpool in 1959, Gauge O finescale
Reply 3 0
Paul Ashton Focalplane
Materials

The choice of materials will be scale dependent to an extent - 7mm scale models are significantly heavier than 4mm scale models and so on - so the size of the various materials to be used is, to an extent arbitrary.  I standardized as much as I could for the posts and the L Girders, while cross members were also of the same dimensions, not necessary but easier for construction if they are.  The track supports can use any timber that happens to fit the task in hand, but I suggest real wood is used, not chipboard and definitely not MDF.

My timber sizes for 7mm scale are as follows (metric):

Posts - 50mm x 50mm, good quality timber with no twisting and few knots.
Cross Bracing - 10mm marine plywood
Girder Rails - 57mm x 21mm, good quality timber, screwed together to form an L
Cross Members - 50mm x 25mm

The supports were all made to the same design:

IMG_1647.jpg 

Then the L Girders were screwed to the top of the supports.

IMG_1653.jpg 
IMG_1655.jpg 

The base of the posts were fixed to the floor using small L brackets while the ends of the L Girders were screwed to the walls.  No other fixings were found to be necessary - the structure is rock solid.

Before proceeding with more construction I need to make a few comments about planning the railway room - the next post.

Comments are welcome, please!
Paul Ashton

Penmaenpool in 1959, Gauge O finescale
Reply 1 0
Paul Ashton Focalplane
Planning the room needs to take into account the following:

The Height of the Layout - I started a thread on the Gauge O Guild Forum asking what height a layout should be ideally.  There is no answer really but for Gauge O layouts it is convenient to have the basic layout higher than for smaller scales.  The logic is that in 7mm scale the layout looks good from an "on the platform" perspective.  4mm scale layouts look best viewed from the "top of a nearby tall building" while 2mm scale layouts lend themselves to helicopter viewing.

Guild Members also pointed out that layouts at exhibitions need to be accessible to children and the handicapped in wheelchairs.  Children can be accommodated with step up stools.

The design of the layout needs to take into account the lowest track elevation, the optimum track height and also how high and low the scenery will be.  Penmaenpool's track is on the flat but the Mawddach Estuary is about 4 meters below at high tide, so the track bases will need to be higher than the tops of the L girders by a scale 4 meters or so.  That's about 10 cm.  I allowed a bit more.

Is the Floor Level?

If it is, then that means that all the supports can be to the same design and height.  I made what I call a Datum Stick which is a piece of 50mm x 25mm wood with markings on it for "top of supports" and "basic track base height".  Other markings can be added if required, particularly if gradients are going to important.

What is the Minimum Radius?

Important for any layout, but here it is going to be difficult to sketch a track plan in thin air!  I made a master track base using a track curve radius of 1.8 meters (6 ft more or less).  I used the master to cut additional curved bases and then laid these out temporarily on the L Girders.  Similarly, as I am using Peco points, their scale printouts can be used.  I have used Templot in times past but as a Mac user I do find it has a high learning curve.  I played with Anyrail but in the end simply used the prototype to guide me.  Errors can easily be changed with the open plan system.

Lighting

My railway room was a home cinema with sound proofing and black walls and ceiling.  As a priority it needed good lighting and I found a source of fluorescent  lights that use LEDs and are very frugal and cool to run.  Incidentally, the cinema has an air-conditioning unit which is very useful for maintaining constant temperature and humidity.  Even during a 40ºC heatwave this past summer the railway room was comfortable with about an hour of air-conditioning each afternoon.

Next up:  Tools for the Job
Paul Ashton

Penmaenpool in 1959, Gauge O finescale
Reply 0 0
Nimbus
Paul,

Thanks for posting.  I for one am finding it very useful and look forward to your next installment.



Steve
Reply 0 0
Paul Ashton Focalplane
Thank you Steve, this topic was inspired by the mission statement of the Focus Forum.  I certainly hope this topic helps others like yourself.

Paul
Paul Ashton

Penmaenpool in 1959, Gauge O finescale
Reply 1 0
Paul Ashton Focalplane
 Tools for the Job

For the first time in nearly 20 years I have the space for a decent woodwork shop as well as space in the railway room for model making equipment.  What a delight!

French bricolages are very well equipped, which amazes me.  They don’t know much about storing timber but when it comes to tools, Tim the Toolman Allen would be in heaven!

And the prices are good too.  But before I get carried away, what are the essential tools for an L-Girder construction?

First off - Power tools.

A good quality jig saw, one that has some degree of vibration control.

Likewise a good power drill, one that runs off the mains with power to spare and won’t run out of energy when you need it.

Given the number of screws you are going to need, a good electric screwdriver.  Battery operation is fine as long as you remember to keep it charged up.

A chop or cross cut saw.  I did use a table saw to cut the plywood braces for the uprights but otherwise it was the cross cut saw that was really useful.

Next - Non-power tools

As many clamps as you can afford, all sorts of shapes and sizes.  Spring loaded are good but a few screw G clamps are important as well.

Mallet, not a hammer.

Spirit levels, long and short. In addition, if you have a smart phone, one of their apps.

Drill bits including a countersink bit

Choice of adhesives

I use a weatherproof wood glue from Leroy Merlin.  Evostick weatherpoof is a similar choice (blue container)

For screws I have come to like Torq screws. Better than cross head.

I glue cork to the track bases with wood glue and then glue track to the cork with Copydex rubber cement.  Why?  Because if a mistake is made it is very easy to lift the track and relay it without wasting any more than 10% of the track, perhaps less.  Copydex sticks fast but can be easily unstuck and rubbed away.

I am sure I have forgotten a few items so I will edit this post as the need arises.

Back to railway room for a spell!

Paul
Paul Ashton

Penmaenpool in 1959, Gauge O finescale
Reply 0 0
Jaz Avalley JazAvalley

Planning the room needs to take into account the following:

The Height of the Layout - I started a thread on the Gauge O Guild Forum asking what height a layout should be ideally.  There is no answer really but for Gauge O layouts it is convenient to have the basic layout higher than for smaller scales.  The logic is that in 7mm scale the layout looks good from an "on the platform" perspective.  4mm scale layouts look best viewed from the "top of a nearby tall building" while 2mm scale layouts lend themselves to helicopter viewing.

Guild Members also pointed out that layouts at exhibitions need to be accessible to children and the handicapped in wheelchairs.  Children can be accommodated with step up stools.

The design of the layout needs to take into account the lowest track elevation, the optimum track height and also how high and low the scenery will be.  Penmaenpool's track is on the flat but the Mawddach Estuary is about 4 meters below at high tide, so the track bases will need to be higher than the tops of the L girders by a scale 4 meters or so.  That's about 10 cm.  I allowed a bit more.

Is the Floor Level?

If it is, then that means that all the supports can be to the same design and height.  I made what I call a Datum Stick which is a piece of 50mm x 25mm wood with markings on it for "top of supports" and "basic track base height".  Other markings can be added if required, particularly if gradients are going to important.

What is the Minimum Radius?

Important for any layout, but here it is going to be difficult to sketch a track plan in thin air!  I made a master track base using a track curve radius of 1.8 meters (6 ft more or less).  I used the master to cut additional curved bases and then laid these out temporarily on the L Girders.  Similarly, as I am using Peco points, their scale printouts can be used.  I have used Templot in times past but as a Mac user I do find it has a high learning curve.  I played with Anyrail but in the end simply used the prototype to guide me.  Errors can easily be changed with the open plan system.

Lighting

My railway room was a home cinema with sound proofing and black walls and ceiling.  As a priority it needed good lighting and I found a source of fluorescent  lights that use LEDs and are very frugal and cool to run.  Incidentally, the cinema has an air-conditioning unit which is very useful for maintaining constant temperature and humidity.  Even during a 40ºC heatwave this past summer the railway room was comfortable with about an hour of air-conditioning each afternoon.

Next up:  Tools for the Job

Good points ESPECIALLY the height of the work top, once upon a time I was a kitchen designer, and the taller the person the taller the worktop or inevitable back strain. Even though I know better I often use the kitchen dining table instead of the worktop on occasion and it always gives me a bad back, taking the time to clear the work top is so worth the effort. Surprising making enough room for getting the layout can be useful, and we have used dollies with a board on it to work under the table so you can pull with your arms rather than crawl about.Lying on your back on a cushion or two is SO much more comfortable. I use the same dollies to move really useful boxes around rather than carry them, although I admit I have occasionally snapped my fingers when loading unloading....rather like the cash register in Open All Hours LOL.

Jaz Avalley

Model Railway Discussion Group

https://www.facebook.com/groups/495282280644117/
Reply 0 0
Paul Ashton Focalplane
Thanks, Jaz.  The kitchen sink in our house is set in a counter top 15cm higher than the rest of the kitchen because when you are using the sink your hands are that much lower than when working on the kitchen surfaces.  Logical but rarely seen.  Our kitchen designer had never seen it done before.
Paul Ashton

Penmaenpool in 1959, Gauge O finescale
Reply 0 0
Paul Ashton Focalplane
The Rest is Easy!

Well, not exactly.  It's easy to make mistakes but fortunately it's easy to undo them  and correct.  After spending many hours designing and building a multiple incline hidden sidings layout for Penmaenpool I came to realize that 7mm rolling stock is HEAVY!  So I decided to flatten out all the inclines and within a week most of the work was done.  It was a hectic week but basically I corrected about 3 months of work.  The basic underpinnings are just the same, it's the track supports and track bases that have been changed.  Another week and I will be moving ahead, faster that I would have been as the layout is simpler.

My previous open space layout was assembled in HO scale in Houston, Texas.  Here I had the advantage of the smaller scale and lighter stock.  I had trains rushing around over and under each other in a space 16' x 16'.  It was great fun but not a prototype layout.  Penmaenpool aims to be a close approximation of the prototype which makes life both easier and more difficult at the same time.  Easier because it is simpler (the real thing usually is!), difficult because everything has to be just right within the rules of the layout.  I have had to bend the prototype to fit the room such that the platforms are actually curved in the opposite direction.  But I am hoping that the essence of the prototype will shine through.  The viewer with knowledge of the actual area will be the ultimate judge.

Some more photos:

IMG_1710.jpg  IMG_1719.jpg 

IMG_1986.jpg 

Incidentally, none of these three photos represents what I am now doing!  For the latest, go to the Penmaenpool layout topic!
Paul Ashton

Penmaenpool in 1959, Gauge O finescale
Reply 0 0
Paul Ashton Focalplane
This morning I had a problem with the track layout.  While trying to represent the prototype track layout at the DOWN end of the platform loop, I also had to compromise in that the loop itself has had to be curved to the left instead of right in the direction of Ruabon.  This is in order to fit the layout into the space available.

The track layout looked like this:

001.jpg 

The probable reason for the use of a Wye leading to the goods siding is that the station originally only had one platform, that being the one on the left.  It may have been a cost saving measure when the loop was installed.  Now, with my curved platforms I tried to use a Wye but it required a very sharp curve in order to keep close to the existing UP loop (Up is the left platform, UP being Ruabon):

IMG_2307.jpg 

So I placed a Curved Left point on top of the Wye:

IMG_2308.jpg 

That looks much better!

By the way, I did first test my most difficult locomotive and it derailed, so the change was necessary.

Changing the point was relatively easy - see the next post
Paul Ashton

Penmaenpool in 1959, Gauge O finescale
Reply 0 0
Paul Ashton Focalplane
Why I use Copydex (Rubber Cement) for track laying.

In the previous post I showed that a point needed to be changed.  Because I use Copydex it was an easy task.  When I glue track down I brush a thin veneer of the white rubbery glue on every sleeper/tie and then weight the section down with cans of unused house paint.  The bond is excellent and also has the advantage of being able to expand and contract slightly during changes of the seasons.  Undoing this bond requires a thin flexible metal tool such as one used for filling plaster in holes:

IMG_2309.jpg 

Stop right there!  there is a wire under the frog.  But by working around it eventually the entire point is free and ALL the bits of rubber can then be carefully removed.

IMG_2310.jpg 

And the new point tested for fit:

IMG_2312.jpg 

Problem solved!
Paul Ashton

Penmaenpool in 1959, Gauge O finescale
Reply 0 0
Paul Ashton Focalplane
Although it is dangerous to say so, the L-Girder framework and track laying has been completed.  I know there will be some alterations but for now I am pleased with all the work that has been done over the past few months.  But this thread is a long way from over as the next stage will be to add the back scene and then start filling in the scenic spaces between the track bases.

The back scene material has been bought.  I am using white finished hardboard sheets 1.6 x 0.8 meters in size.  These will rest on the cross frames of the layout which are at a constant height around the room and then held in place along the top by custom made clips of extruded aluminium which are being fixed to the existing acoustic wall with superglue.  I plan to tape the surface of adjacent sheets together with some form of tape that will take paint and will not come undone.  Research is needed on this.  When I have a reasonable solution I will report on it here.
Paul Ashton

Penmaenpool in 1959, Gauge O finescale
Reply 0 0
Paul Ashton Focalplane
Here is a photo of the back scene panels in place.  The corner fillet needs to be taped, then painting can begin:

IMG_2392.jpg 
Paul Ashton

Penmaenpool in 1959, Gauge O finescale
Reply 0 0
Reply