Pad-Ply-Pen
This is something that has been covered many times and the advice given is to use a pencil on the longest coach to determine the clearance required on parallel radius curves.
That seems practical when using set track but perhaps not as practical with
flexible track ie code 75 before fixing permanently. 
I will have 4 parallel curves on my layout and will start with the inner track 1 using the largest radius possible and work out to the 4th which will be 60 inch radius 
Is 50mm centre to centre (That is the norm for peco point work and the rest of my layout) sufficient is that the minimum and if so what would the minimum radius of the 1st inner track have to be to give clearance 
across the 4 tracks at 50mm centre.
Understandably there are many variables in this but was wondering what experience / solutions others have had.
PPP
Reply 0 0
Pad-Ply-Pen
Have thought again about how to go about laying this section of the layout rather than my first idea of IMG_1442.jpegworking out from the branch it makes more sense to work inward to the Branch making the correct alignment to the storage sidings and the through running lines much more practical.
 
This will let me make sure of the clearances to the attic wall and then 50mm centres to the other 3 main running lines and gives more flexibility to increase the 50mm if necessary still leaving room for the branch.
I have found that having a plan drawn showing the track layout and baseboard dimensions from the start of this has been a godsend rather than jumping in hoping it will fit and lets you see any possible difficulties ie rather than  having right angle corners a 45degree corner has made a huge difference.
By the way the shaded area in the bottom right hand corner is over the water tank and is designed to be removable for access and just about visible two little rectangles which represent surface mounted point motors but reading some of the posts about them it sounds like a lot of fun ahead but plenty of advice given for me pay attention to.
I had intended to fit all points in the storage sidings area with surface mounted point motors but eventually decided against it.
So hopefully not a huge problem.
 
PPP
Reply 0 0
Pad-Ply-Pen
Were goods platforms constructed to the same specifications as passenger platforms 
ie same height or perhaps slightly higher for ease of unloading.
I was checking where my loading platform was going for clearance and noticed it was sitting higher as the foam board hadn’t been removed from below as per the passenger platform and it looked correct for making loading easier it seems GWR goods platforms were 3ft 6ins as opposed to 3ft passenger.
Is this correct 
PPP
Reply 0 0
Julian
I have no idea, however, there is some information in Wiki -   https://en.wikipedia.org/wiki/Loading_gauge#External_links 
Network Rail uses a W loading gauge classification system of freight transport ranging from W6A (smallest) through W7, W8, W9, W9Plus, W10, W11 to W12 (largest). The definitions assume a common "lower sector structure gauge" with a common freight platform at 1,100 mm (43.31 in) above rail.
 
It seems to indicate that your impression is correct, where Network Rail is concerned and historically, that would have been the case before they came along.
 
J
Reply 0 0
Pad-Ply-Pen
Yes Julian it seems they were higher one different railway was 4ft above rail height .
Just seems visually better and in rail life more 
practical for loading say milk churns.
PPP
Reply 1 0
Reply