GregK
I am wanting some assistance with install and connection of the system components.
I am t4echniclly savvy as my background is electronic trades however I have some queries with setting up multiple AEU units and which unit the sniffer has to be connected to.
My situation is 31 Cobalt Alpha IP point motors installed on the layout and control of these is with the Cobalt Alpha D switches and Cobalt Alpha AEU I will be installing a total of 4 Cobalt AEU units in series..
If someone can provide clear information on an installation and configuration of this type I would be very appreciative.
GregK
Reply 0 0
James Grundy
Hello GregK,
 
Connection of multiple AEUs to the sniffer is quite straightforward, but may require additional DC power to be supplied to the 4th AEU.
 
To connect the AEUs together, you can use the supplied Link cable. See the diagram below showing how this connection is made.
The first AEU then needs to be connected to the Sniffer with an RJ12 cable, such as DCD-ACL.
 
[228673%2F8819715%2Fmceclip0]
As there is limited power available via the RJ12 socket for the AEUs, it may be necessary to supply 12V to the latter AEUs (either the 3rd or 4th) using the barrel socket on the left side of the board.
 
For programming the AEUs, the cab addresses can be left at the default, but each unit will need a different accessory address range to be programmed.
 
Be aware that when one of the AEUs is programmed with a new accessory address range, if consecutive units 'downstream' i.e. further down the chain from the sniffer, are switched on, they will assume consecutive addresses from that which you program manually.
 
Please see the attached PDF on programming AEUs for more information on this.
 
Kind Regards
 
James
DCCconcepts Sales
Reply 0 0
GregK
Hello James,
Thank you for the reply which has cleared up the process for me.
 
regards
Greg
Reply 0 0
Reply