centenary137
Hope DCC Concepts techs can answer this query.
 
I need to create a lifting section on my layout for access and intend to use DCC Concepts 'Powerpoint' dowels as described in the installation guide. However, Im totally confused by the diagram and description in this document.
 
In the attached diagram from the installation guide, track power is indicated as blue, back rail and red front rail. I understand the point that isolation gaps are only required in the red rail.
 
Screenshot from 2023-05-18 13-02-33.png
The Powerpoint dowels provide power for the red rail on the approach, lift section and exit. But what about power for the blue rail on the lift section? Is it presumed in this diagram the lift section blue rail is hard wired from the approach side and you need to allow sufficient wire for when the section is lifted up?
 
The 2nd box also says "If you add flexible wiring links at A where the lift bridge hinges are, you can of course do this with only two of our PowerPoint Dowels."
 
If you only use 2 pairs of Powerpoint dowels, does this mean you cannot have the isolation sections and effectively this has no interlocking protection?
 
 
Reply 0 0
Julian
It would seem that, If you remove the top dowel, [ie. one set] on the left hand side and wire a flexible connection loop, at A, then the bridge and the left hand approach red rails will be isolated, as will the right hand red approach. 
You keep the dowel set on the right hand side of the bridge and the lower set on the left, for location, too.
 
Julian
 
Reply 0 0
James Grundy
Hello centenary137,
 
Julian is correct that the flexible wire alluded to in the box is to replace the 'top' dowel in the diagram. This means that the dead section on the left of the diagram is powered only when the bridge is powered, without using a third dowel. 
 
On the topic of flexible links, we have a bit of a trick up our sleeve for those. As you noticed it is necessary to form a connection for the rail not served by the dowels. In the case of the diagram this is the 'blue' rail. Rather than running a wire into the lift out section, we used the metal hinges that hold the bridge in place to pass current for the blue rail.
 
For more information you may be interested in this video by Larry 'The DCC Guy' who visited our Settle office and used the ideas he saw in use to construct a lift out section like that shown in the diagram above. Find his video here:  https://www.youtube.com/watch?v=Qu6zYmjors0
 
Kind Regards
James
Sales, DCC Concepts
Reply 0 0
centenary137
Thanks both!
Reply 0 0
Reply