I am building a 4 mm 4SF layout in one of the spare bedrooms of our recently acquired bungalow. The room is in a dormer put in by previous owners some years ago. Alterations to the room where made to make it bigger by removing under eve cupboards and moving the door further onto the landing. Room 01.jpg  Room 04.jpg  The room before.

Room 32.jpg  Room 35.jpg  Room 36.jpg  And after. More soon.
Reply 2 0
Puffer Pete
Looking good. Is that vinyl or laminate flooring? Vinyl keeps noise levels down and offcuts turned upside down make good track underlay.
Reply 0 0
Rowsley 17D
Hi Pete, it's vinyl flooring and is warm under the feet. Easy to clean too. The fitter took all the off-cuts away, there was little waste. I use cork as underlay from Cantrill's. The baseboard building began in July using the old cupboard doors for the fiddle yard.Baseboard 03.jpg 

The scenic baseboards used up some of the old ply and some new.

Baseboard 07.jpg 

Baseboard 13.jpg 

Buxton Midland was on two levels. These boards are the higher of the two which will accommodate the station platforms and upper goods yard. The abrupt cut-out s where the gradient begins to the lower level.

derwent_a.png 
Here's the track plan, I don't know why the 3-way turnout doesn't show  up, but that is what goes in the gap. The bottom line from the 3-way leads to the lower level which comprises the MPD and coal yard. The real layout was so cramped with the LNWR to the top and right-hand side and the town to the left and bottom. The station was signalled so that the main up line could be used as a head-shunt.
Reply 3 0
LarryG
That's a novel way of making baseboard framework!  Layout-building is more up my street when I go on forums, so I look forward to seeing Buxton develop.

I went to Buxton once just after the war. My dad thought it would be interesting to go in a boat in some caves there. Mmmmm, quite eerie!
Reply 1 0
Rowsley 17D
Why use Buxton Midland as a starting point? Well it's in the Peak where I grew up until my early 20s, and it was a cramped site that fits into the bedroom space I have. Using Templot I used its ability to upload a 25" OS of the station area in the 1920s and plot the trackwork on top. Something like this:

derwent_spa_final.png  Which fits into the room like this:

feb_14.png  Although the fiddle-yard  will be parallel to the right-hand wall. In order to keep the width reachable I missed out the bottom coal yard sidings and the top siding of the upper goods yard.
Reply 3 0
Rowsley 17D
I am using C&L flexi track and hand-built turnouts using C&L components, recovered from my previous loft layout in our previous home, for the layout. 

A Templot plan of the turnout is taped to a flat board (or plate glass would be ideal.) Timbers held with double-sided sticky tape at their edges. I use three copper-clads for the crossing nose area, one to electrically join the stock rails to the switch rails and one to move the switch rails. 

Track 01.jpg 

Next the crossing and check rails are added using gauges, then the stock rails are put in place.

Track 02.jpg 

Next the switch rails are filed where they touch the stock rails and put in place.

Track 03.jpg 

Then all is carefully removed from the plan. The slide chairs usually fall off at this point but I super glue them to the stock rail sides.

Track 04.jpg

All in all about four hours work or a couple of nights.
Reply 2 0
Jaz Avalley JazAvalley

I love the quirky baseboards too, I see you appear to leave a good space behind as well which will be good for access and scenery.

I like the build on the track too, we did consider it, but the investment in time meant we would probably never have got much of the layout running, even with Peco 75 flexi we still have loads to do, but that does not mean that it will not be fun to watch you doing it 🙂

with your skills I would consider entering the competition too.

Jaz Avalley

Model Railway Discussion Group

https://www.facebook.com/groups/495282280644117/
Reply 0 0
Rowsley 17D
Thanks Jaz. I can access the layout from the back which will be invaluable once the lower level at the front is in place, with the same unusual framework. The finished framework has more bracing than is shown in the photo as it was not finished when I took the photo.
Reply 1 0
Rowsley 17D
Track laying began in July with cork being used for the track bed. After attaching wire droppers all track is sprayed with sleeper grime before laying.

Trackbed 06.jpg 

Wherever possible I use vinyl glue from B&Q. Its doesn't set hard like PVA and will stick most things scenic. I use a similar method of track-laying to Larry Goddard of this parish, but for single pieces of track whereas Larry lays complete formations - glue, lay track pour over ballast and vacuum off. For turnouts, I mark with pencil where the ends of the rails go and also where the wire that changes the point goes through the baseboard to the servo and drill out to 5 mm. I use a servo mount from aluminium 15 mm channel and line it up with the 5mm hole on top of the track bed and mark the  holding screw holes and drill out from the top of the baseboard. The mount can then be attached under the board making sure the wire hole is more or less in the middle of the 5 mm hole. Tape is used to cover the 5 mm hole right across the cork as the moveable copper-clad tie bar must not have glue anywhere near it as the points won't be able to change! Glue is spread on the cork, the taped removed and then the turnout is carefully laid in place using the pencil marks as a guide. I pin down with drawing pins and I use a duplicate copy of the track plan to make sure things are in the right place, then pour ballast (old Carrs' stuff made from nut shells) over the top and hoover off after a couple of minutes. Carrs' fine ash is then poured over the formation to fill in any gaps and again vacuumed off. After making sure nothing has moved all is left to dry. The rail tops are cleaned when all is set and the droppers wired to the track bus.


The first three turnouts in the top yard.
Track 12.jpg    

The exit from the bay platform.
Track 22.jpg

The facing and trailing crossovers. In real life this formation was an asymmetric scissors but although I planned one in Templot building it and making it work would have been a nightmare.
Track 25.jpg   

The last turnout on the upper level is the three-way.
Track 27.jpg 

Just the rest of the plain track to the platforms and sidings to do now on this level.
Reply 3 0
Rowsley 17D
Some more plain track has been laid and Lanarkshire Models buffer-stops added. A Midland goods shed from a Scalescenes kit I built for my previous layout is to be reused but I wanted the more interesting side of the kit - the road-side loading bay to face the front of the layout. The large curved siding has been changed and straightened to allow this but doesn't leave much room for loading vehicles. So I may shorten the siding it is currently on and put it on the back siding, where the original was but much further to the right. Goods Yard 01.jpg  Goods Yard 02.jpg

Goods Yard 04.jpg

Here it is on the straightened siding is there enough room? If I shortened this siding to where the shed office current is and lengthened the siding behind it there would be more space. I'll have to try and mock up what I mean and see how it looks. The cattle dock loading ramp is the wrong way round, again built for previous layout. It's free to a good home if you would like it, PM me.
Reply 1 0
Jaz Avalley JazAvalley
I like the cattlepen

Jaz Avalley

Model Railway Discussion Group

https://www.facebook.com/groups/495282280644117/
Reply 0 0
Paul Ashton Focalplane
Well, Mr. Rowsley, this is a fine layout in the making.  I like the way you used Templot to follow the real plan, much like I have bent my layout into the space available.  I’ve never been to Buxton at all so your layout will be a good introduction to the place.  The flow of the C&L track is excellent, I find Peco to be a poor compromise.

Cheers, Paul
Paul Ashton

Penmaenpool in 1959, Gauge O finescale
Reply 0 0
LarryG
I am only just catching up with things on Focus and it is really great to see this layout Mr.Rowsley. Your handbuilt trackwork has a nice flow to it and the ballasting is neat and tidy as on the real thing. 

When it came to laying a cobbled road some years ago, I removed the last row of cobbles as this made for a better join between sheets and better visual continuity.
Reply 0 0
Rowsley 17D
Thanks for your comments, gentlemen.

Hi Paul, If you visit Buxton you'll find only the LNWR station (in a poor state too) exists. The MR one went under an inner town by-pass some years ago. At least the fan window wall of the LNWR has been restored and the foundations of the MR window wall are still there if you look.

Hi Larry, do you mean the long edging setts? If not, do you mean the long side or the short one?

For those using C&L flexi, (if you can get hold of it) I found that on some panels the rail had been put in upside down! I kept wondering why several vehicles' flanges ran on the chair tops.

Jonathan
Reply 0 0
LarryG
Rowsley 17D wrote:
Thanks for your comments, gentlemen.

Hi Larry, do you mean the long edging setts? If not, do you mean the long side or the short one?
Jonathan

I mean the short side where they join to form a cobbled roadway.
Reply 0 0