Pad-Ply-Pen
Looking at my plan for the fiddle yard as that is where I intended to start laying track.
There will be around 12 roads so was wondering about the dropper wires to the bus wire my thoughts were to add the dropper wire central on each piece of track but then thought if say each metre length was sitting parallel that would mean a lot of connections to the bus wire in the one place.
 (see photo)
Can the dropper wires be wired daisy chain fashion or would that mean possibly loss or reduced power to some ot the roads.
What is the best practice for this across multiple tracks and sidings?
 Now  going off the wiring topic rather than another post comments on this way on laying the track 
What I am going to do is cover the base boards with foam board but not glueing it down intend to staple it as this will let me trim away the foam board from areas that are not below track or point work this wil give a edge to the Ballasting and not need scrapping away to achieve this 
Similarly I will staple the track to align it, glue to the foam board then add the Ballast remove staple or snip the protruding staple showing above the sleeper  that should hold the track firmly the fiddle yard will not be ballasted.
I have used some 20mm steel lengths which I had and by a happy coincidence give the correct 6ft way between roads and keep completely straight and parallel.
Again another coincidence as some of my platform have slight curves and wondering how I would get the track matching this I found that some 10mm white right angle plastic  set against the platform face and then pushing the sleepers against this the track followed the curve of the platform face exactly and gives a scale 9ins gap on the platform edge coping stones.
See attached photo on this and my progress or lack of it !
  • One other thing when constructing the base board I did not want cross braces fouling point motors so made it possible to move them to suit if need be using a L shaped framework for them to sit on and fastening from below 
image.jpeg  image.jpeg  image.jpeg  image.jpeg  image.jpeg  image.jpeg  image.jpeg 8EF1D578-7691-4F45-B429-3D50AEC9B682.jpeg 
Reply 1 0
Pad-Ply-Pen
Strong opinions on almost everything nothing seems to be set in stone.
From what I have read and understand it would be best practice not to have a continuous bus so will take that approach but would be interesting to hear the converse opinion.
All must work to some degree so trying to decide which is best practice is challenging but gives some insight into a seemingly complex part of the hobby.
PPP
Reply 0 0
Robin Sundt Echini

Beautiful work BB and very neat and tidy as ever!

I’m afraid that a lot of my point wiring under the baseboard is a lot more utilitarian but it does seem to work OK. 
This is the first point motor that I ever installed. 

020AD758-8FB1-4935-9E88-0D8BA8AE141B.jpeg

Then things started to get more complicated with multiple points in close proximity all linked together to provide dead sections to prevent locomotives running onto points set against them. At this point the layout was small enough to to be able to tip it on its side to work on the bench. 

65E2B9A5-0C0F-43DD-A7F6-DEC369362B3C.jpeg 
Then I installed a major station junction and sidings. Eleven points all within a two foot radius, so I used a pair of distribution strips in the middle.
4AE351D4-46C6-456A-BB84-63989AEE87F6.jpeg 

More recently I have started using these “click” connectors. While it is not as neat, I found that it is easier to leave them hanging to make access easier as now everything has to be done from underneath while working above my head. This particular point motor also has to switch the DCC “phase” entering the fiddle yard. These days, for me, almost every point motor is also doing other things.

896C6678-5C21-43C8-8C07-5BD25ED6203C.jpeg 
For a single point motor, the click connectors work well and make tracing or modifications easy for me.

2ABD399E-AF38-4902-8B7B-085435DCB3EC.jpeg 

Over the years, I have found new ways of doing things and found different bits of kit that make life easier. A lot of the point wiring is also connected to signals and detectors, which complicates everything; also every point has “dead” sections to prevent locomotives running onto points set against them. 

Not only is every layout different but even almost every point motor on my layout presents different challenges and the wiring needs to be modified to solve them.

Ultimately, once you work out where power and connectivity is required, you just need to get the wires connected up in a way that provides a reliable efficient transfer of power. Whether that is strip connectors, click connectors, soldering, plugs or anything else you can find, the electricity won’t care so long as the connection is really good and it can flow without interruption or interference. 

Clearly there is no right answer, you have to work out what works for you. Certainly, if I were starting over, I would do a lot of things differently.
Perhaps this is one of those crazy things that you should never do for the first time!
But then the learning curve is a large part of the fun. 

We never stop learning. 

Robin 

Reply 2 0
Pad-Ply-Pen

Perhaps this is one of those crazy things that you should never do for the first time!
But then the learning curve is a large part of the fun. 

We never stop learning. 

Robin 

I like your idea of numbering the points P4/P5 basic stuff but easy to miss doing at the time. I am at the play school stage of this learning curve but hopefully with all the advice and help will make progress it is good to see examples and explanations from those who have been there and got the T Shirt or should I say the gown mortar board and diploma
PPP
Reply 0 0
AHJAY
Not really. The twisting is a very definite YES as induction is a very real thing. Likewise, making a power bus a ring is a very bad idea for very real reasons,,, this is NOT the same as an AC mains ring bus - its a high power data transmission bus.

Ahjay

jed10 wrote:



Ooooo now there's a huge can of worms which can spark wide debate. A bit like whether or not to wire your bus as a ring. Both have been debated at length across the web. Best not to get into that in this thread or it may detract from the OP.  I'd just say that we all know what the view of DCC Concepts is and as this is their forum I'm sure we all respect their view. Happy to have a discussion about this if you wish but probably best to start a new thread.
Reply 0 0
jed10

Jed10, I fully understand the desirability of soldering droppers to the DC Bus but from a purely practical point of view, based on the diagram that I posted above, would you solder nine droppers to the bus over such a short distance?



There being nothing like a real life example, this afternoon I soldered 20 droppers (10 pairs) within a 600mm run to my DCC bus. There were already 4 wires (2 pairs) attached in that space which I had soldered previously.  All pretty straightforward and there's still plenty of room for more to be added. It was quite a satisfying little job. Eight more to solder tomorrow, just around a corner from these, and then it's back to track laying which will mean even more droppers to solder. 
Reply 0 0
Robin Sundt Echini
Sounds great. Any chance of a photo?
Reply 0 0
Bunkerbarge
Each to their own.
Reply 0 0
jed10
Sounds great. Any chance of a photo?


Not really the most exciting photo . . .

20220403_170036.jpg 
Reply 0 0
Pad-Ply-Pen
Hi Jed,
Look at your wiring re droppers am presuming that you stripped the bus to take the four blue/ black droppers in the centre of your photo in one section then covered with the black tape to insulate the exposed soldering and wiring.
It seems to me that the connecter block is the better neater option from previous photos.
Does the black insulation prevent corrosion over time as well would this possibly be a problem with the block connecters and if so how can it be prevented 
PPP
Reply 0 0
AHJAY
The bus would be better if it was twisted... it really does make a positive difference.

There is far greater risk of corrosion and loose connections with terminal blocks and the soldered joints are a way better option in this respect.

Tape has no benefit/effect in relation to corrosion - it simply prevents touching of exposed wires. (anything that prevents corrosion would need to be an air-tight seal)

In the end... its mostly about where the layout is in relation to corrosion. The best / only real protection is a stable and dry environment.

Ahjay
Reply 0 0
jed10
Pad-Ply-Pen wrote:
Hi Jed,
Look at your wiring re droppers am presuming that you stripped the bus to take the four blue/ black droppers in the centre of your photo in one section then covered with the black tape to insulate the exposed soldering and wiring.
It seems to me that the connecter block is the better neater option from previous photos.
Does the black insulation prevent corrosion over time as well would this possibly be a problem with the block connecters and if so how can it be prevented 
PPP


The low smoke insulation is stripped back over a short length and then after soldering the droppers it is covered in self amalgamating tape which is much better than pvc insulating tape.  Any solder jount will always be much better that a screw terminal joint or any other type of joint no matter how good it looks.  When you put a bit of stripped wire in a screw terminal that will always create a higher impedence than a clean solder joint which will have a negligible effect on the impedence. After time, wires in a screw terminal joint will start to oxidize and the impedance will increase further. Worse still the screw may become looser and then arcing may occur by which time you've got quite a big problem on your hands. 


Reply 0 0
Pad-Ply-Pen
Hi Ahjay / Jed
Stupid questions I know but informative answers to base my decisions on.
It is a wise man who learns from his mistakes but a even wiser man learns from others mistakes 
Still undecided which technique to use pro and cons with both soldering does seem the way to go but simplicity the block provides is tempting.
Stupid question alert 
The roof space where the layout is to be situated is dry and has reasonable ventilation in general terms how long would you expect corrosion to take place that effected wiring and electrical connections months, years 
just curious 
PPP
Reply 0 0
jed10
AHJAY wrote:
The bus would be better if it was twisted... it really does make a positive difference.
Ahjay


Ha ha, I was expecting that comment Ahjay.  I don't disagree with you that twisting bus wires can be a benefit but it's only one of the tools we have at our disposal to achieve our goal of a trouble free DCC wiring system.    I have seen you write that inductive interference is a very real problem and you aren't wrong. Fortunately DCC is generally quite forgiving. It has quite a low frequency which helps in this respect and most quality decoders are quite capable of filtering out a bit of 'noise'. Nevertheless, minimising the effect of inductive fields is something for us to take seriously.

Let me explain what I have chosen to do with my wiring to mitigate the risk of problems created by inductive fields. It's always a lot easier when starting from scratch designing a new layout specifically for DCC. I'm also lucky that I'm confident with my soldering ability and electrical knowledge and basic electronics. For others it may not be the same so what are the right choices for me may not be best for everyone.  The first thing to consider is cable size. Everyone seems to get hung up on power rating but that's only half the story.  The bigger the cable surface area the less impedance there will be over the length of the bus. For example, 2.5mm cable has a resistance of 7.41 ohms/m whilst 1.5mm is 12.1 ohms/m. The lower the impedance the lower the chance of inductive interference being a problem. So, for me, using 2.5mm sq copper cable - stranded because not only is that more flexible to work with there is also a small benefit with the 'skin effect' (google that if you want to understand it more) - was a no brainer. I chose to use 6491B cable because it's very easy to strip and being 'low smoke insulation' works well when the soldering iron accidentally touches it.  Generally speaking, the closer together your pair of bus wires are the less of a problem inductance will be - hence why twisting is often recommended. However, for me it was more important to have easy access to my bus wires for soldering droppers (see photo above) so I decided to keep mine at between 10mm and 15mm apart for practicality reasons. My bus wires are continuous with no joints, spurs or stars etc. Breaks and joints in the bus will increase the impedance so they have been completely avoided. All connections to the DCC bus are solder joints to 16/0.2mm equipment wire. For anything other than connections to the track, connections to my Cobalt IPs and data only feed to my Z21 accessory decoders I have a separate 12v DC bus.

Ok, so all of that is enough in its own right to ensure I maintain a high quality DCC signal throughout my layout. Distribution through the Code 55 track is by droppers soldered to the undrerside of every track rail section (including points) and then soldered to the bus. Dropper lengths vary between about 150mm and 300mm max. All my DCC decoders (all but one are Zimo) have CV19 DC running off because I don't have a need to ever run them on DC and don't even own a DC controller any more. Short circuits are the biggest potential problem for any DCC signal (although I use a Z21 which is pretty fast at reacting to a short circuit)  and most of them come from derailments on points where the points were set against the approaching train.  One of my next projects is to install IR sensors by all signals which are just before a points junction. If the signal is red it will activate the sensor. If the sensor is activated it will immediately fire a relay which will cut the power to the section of track leading up to the point. This will prevent overruns and shorting across the frogs. When the point is changed, the signal goes green, the IR sensor is turned off and and power is restored to the track. The train then starts up again according to its auto acceleration cv setting.

So, to conclude,  I believe that with the choices I have made and the confidence I have in the integrity of my wiring, twisting my bus wires wouldn't have made an appreciable difference.
Reply 0 0
jed10
Pad-Ply-Pen wrote:
Hi Ahjay / Jed
Stupid questions I know but informative answers to base my decisions on.
It is a wise man who learns from his mistakes but a even wiser man learns from others mistakes 
Still undecided which technique to use pro and cons with both soldering does seem the way to go but simplicity the block provides is tempting.
Stupid question alert 
The roof space where the layout is to be situated is dry and has reasonable ventilation in general terms how long would you expect corrosion to take place that effected wiring and electrical connections months, years 
just curious 
PPP


My grandmother used to have a copper coal scuttle which lived in her sitting room. She hadn't used it to keep coal in for years as she had a gas fire. To keep the scuttle clean and shiny she used to clean it every week. As a small child I often used to help her. I was always amazed at how much black and green stuff used to accumulate on it every week. 

It's a slow gradual process and probably won't affect an electrical signal passing through a single joint. The problem may not be down to just one screw joint, it may be an accumulation of lots of them which contributes to the overall impedance rising. As that rises, your bus becomes more susceptible to inductive interference. It may be fine for ever or just for a few years and then you start to having issues but finding the source of the problem may be almost impossible because it stems from a design issue. 

Look, you have to do what is right for you but if you are just starting out you have choices. Give soldering a go and see if you can master it. You don't need a lot of expensive kit. A decent iron (a 25w Antex one is a good starting point), a stand, some multicore solder (NOT lead free) and a small tub of solid Rosin flux. A cheap 'helping hand' like this will also be useful. Then settle down to some youtube tutorials. If you can be confident with soldering you'll never look back.  If you just can't get to grips with it then go down the other route. It may not be as ideal but works well enough for many. Just remember to take as many other precautions as you can (like using 2.5mm cable and twisting your bus pair) to compensate. 

Above all, whatever you do, enjoy it.

Reply 0 0
AHJAY

It's all about choices.... and enjoying the hobby. I strongly promote twisting because it helps significantly at the core power frequencies and it is such an easy, essentially cost-free thing to do... (actually DCC's frequency can be quite variable over a wide range, so its not really a "low frequency" signal).

In the end we all do what we wish, but I am constantly reminded about the benefits of best practice by the often quite simple things that need to be done to resolve layout problems for frustrated modellers... and how easy it would have been to avoid most of them in the first place.

kind regards, Ahjay