Bernard Newbury Bernard Newbbury
I have just retired and have just given up my other passion of racing a drag car, but always said I would build a model railway when we moved. I am very lucky to have a purpose built building (we lived in it while builders rebuilt our new bungalow) that gives me a layout room of 30'x10'. It is a roundy roundy with a branch and one side is fully automatic and indicated storage. I have used carport roofing to save dust on the stock when not being used. I have been building my buildings for the past 18 months, mostly scratch built with heavily modified kits but for the last 3 months I have been working very hard and have got as far as the assorted photos. I have a vast selection of goods wagons, coaches and 24 engines, all weathered and sound. Hope you like them. When I have any updates I will add them here.IMG_1699.jpg  IMG_1700.jpg  IMG_1701.jpg  IMG_1703.jpg  IMG_1738.jpg  IMG_1739-1.jpg  IMG_1740.jpg  IMG_1741.jpg  IMG_1742.jpg  IMG_1743-1.jpg  IMG_1745.jpg  IMG_1746.jpg  IMG_1748.jpg  IMG_1749.jpg  IMG_1750.jpg  IMG_1751.jpg
Reply 3 0
prtrainman
All looks excellent so far. Please can you give details of how the platforms are constructed & the origins of the canopies.

Philip
Reply 0 0
Bernard Newbury Bernard Newbbury
Both items are scratch built using Slaters products, Will's building sheets. Platform edging is Peco. Canopy pillars are from Scalelink. The platform asphalt/tarmac is roofing felt using the back, but has yet to be finished and weathered a bit more. As these were built before the layout was, for some reason I made the footbridge too low and the first train round dragged it down the track, but this has now been sorted
Reply 2 0
Gary Long Long Rail
Bernard what a great space and superb modelling in such a short space of time
Gary
Reply 0 0
Bernard Newbury Bernard Newbbury
Bernard what a great space and superb modelling in such a short space of time

Thank you, I am lucky to have a dedicated building.................and an understanding wife😃 I spend a lot time in there.
Reply 1 0
Gary Long Long Rail
Bernard I like the idea of the covering to the storage sidings which appears to be hinged.

I have used a similar idea on one area of my layout but use an MDF top which I can then be used as an area for modelling when in the down position. Since introducing this I have started to ballast the sidings and added a back scene to the underside of the hinged board so that when open these sidings appear to be part of the layout.

Looking at the back of the the control panel there is some very neat wiring there and I assume this was in some related to your employment before you retired, or from the sound of it took up full time railway modelling ðŸ˜ 
Gary
Reply 0 0
Bernard Newbury Bernard Newbbury
I used to have a coach trimming business where we would restore the interiors of cars and build custom cars,  drag race cars hence my wiring. That iis a good idea about the back scene on the storage area. My son keeps saying what a waste of space/area that is not scenic. I am hoping to start ballasting before the end of the year.
Reply 0 0
Jaz Avalley JazAvalley
 agreed the wiring looks awesome frankly, perhaps we can get you to expand or do a blog on the workbench 🙂

Jaz Avalley

Model Railway Discussion Group

https://www.facebook.com/groups/495282280644117/
Reply 0 0
Bernard Newbury Bernard Newbbury
  I will try and expand.  Top photo is the work bench with the track running behind under the cover which is hinged.  The second is the clear cover on main storage area with sensors on every track that will stop the train. When it is required to run there is an over ride switch on the panel  to enable it to run and as that one leaves the next train on that section of track pulls forward and occupies the empty piece of track. The third picture down is the hidden sidings under the hinged dark cover. Since there was not any space under the baseboard I adapted the DCC ip motors to surface mount. The next picture are the sensors where the train breaks the beam. The last picture is an overall of the control panel and the main has not yet been wired. I am hoping to get the storage finished within the next few days and get on with laying more track although it has a full circle running The storage is split into 3 power districts as will be the scenic part. 
IMG_1754.jpg  IMG_1755.jpg  IMG_1756.jpg  IMG_1757.jpg  IMG_1758.jpg 
Reply 2 0
Gary Long Long Rail
Bernard I think you must have spent a lot of time planning what you are going to do
Gary
Reply 0 0
Bernard Newbury Bernard Newbbury
Bernard I think you must have spent a lot of time planning what you are going to do

When you have builders rebuilding a property for you you have lots of time on your hands. I think we had builders in every day for 12/13 months while living in the railway room.
Reply 0 0
Trevor Page Roundhill6854
That's an impressive and well organised area you have there Bernard. I'm waiting for a start to be made on my 'layout building' in the garden - T minus 20 days and counting! It will be nothing like the size of yours but it is to a comfortable all year round spec and solely for the layout.

I like the way you have a hinged cover on the fiddle yard, that's set me thinking. 
Reply 0 0
Bernard Newbury Bernard Newbbury
Thanks.  As I said earlier we lived in that while we had builders quite a while so what you see there is 4 months work. That was built with my layout in mind after we moved out and is fully insulated with another room used as a utility room and a toilet/wash room. The cover is to keep the dust off the stock and has all the sensors under the cover so can be operated with the covers on. Good luck on your building and show us some pictures.
Reply 0 0
Reply