Stephen Buck sbuck

How I designed my model railway

I’d been collecting ready to run models of New South Wales Government Railways (NSWGR) models for many years and decided about 10 years ago to build a layout.

I decided that I wanted to build a double track circle, with an authentic station and storage sidings.  I’m of the view that a genuine trackplan is more of a challenge and more realistic than somewhere invented and, once you’ve decided your requirements, you can work through the track plans or go travelling, to find a location which meets your needs.

I set a few requirements for the layout and station:

  • It was to be double track
  • It was to have a run through refuge siding
  • It was to have a small goods yard adjacent to the station
  • It was to be a genuine NSWGR station
  • Area 5.5 metres x 2.4 metres, to fit an available area
  • The layout to be modular

The Australian Railway Historical Society (ARHS) publishes a CD ROM with NSWGR track plans and, having travelled extensively over the network over the years I had a few ideas of suitable locations to model

There are (or were) about a dozen locations which met these requirements.  Those on country mainlines were primarily built between 1900 an 1912 when a decision was made to significantly increase the length of mainline goods trains, which could be done because of the installation of Westinghouse brakes and the required loops were then too long for the points to be operated from a central signalbox. The solution for longer trains was to provide refuge sidings with a single entry near the signalbox which required trains to reverse into the refuge siding.

 These locations were on the Main Southern line out of Sydney between Harden and Jerrawa and on the Western line between Penrith and Lithgow.  The Western Line included 32 km (20 miles) of more or less continuous 1 in 30 grades on the Down, with regular fast passenger services and relatively short goods trains and a short section of 1 in 40 on the Up, so trains were short and quite a few loops were required.

Further study pointed to one location on the Sydney suburban rail network which me these requirements, Gordon station, which is about 10 minutes from where I live.  I decided to go with this as it is compact, interesting and nearby.

A safeworking plan of the station for the era being modelled is attached:

This is the track plan used from 1909 to 1926 when the line was electrified and colour light signals were installed.  Otherwise the plan remained much to this plan until 1994, when the yard was rearranged with the old Up Main becoming bi-directional and set up so that trains could terminate in either direction on the centre platform track.

So my layout is a period layout set in this era, or more precisely between 1919 and 1926.

In this era, around 110 steam hauled passenger trains and 2 goods trains operated, plus some interesting additional services.  Off peak frequency was typically every 10 minutes in each direction.

Gordon track plan 1909.jpg 

The line has 1 in 50 grades, providing a good workout for the Beyer Peacock built 30 class 4-6-4 tank locos with a variety of carriage sets including American style end platform cars and newer cars intended for electric service.

My first attempt at building the layout was pretty poor, poor baseboard design, poor track alignment and problems with pointwork.  So, I’m starting again from scratch!

I am building Gordon station on two 1650 x 600 boards, and the entry will cover the right hand side (Down end) and includes the station building, footbridge with overhead booking office and the points into the yard and to the Local Platform, which were primarily used to release locos to run around trains.

 

More to come

Stephen

 

Reply 0 0
Stephen Buck sbuck
Competition Entry: Gordon Station (northern module).  Entry FC 1887

Blog no.2 Module design

The starting point for the project is my newly constructed module for Gordon layout.  The top and front facia are 9 mm marine ply, and the backscene is 3 mm ply with a 19 mm square pine edging and gussets.  The front fascia and backscene are the structural “beams” for the module, giving a very rigid structure.

The modules are located with DCC Concepts dowels and recessed toggle clamps purchased cheaply on line.  The legs of 45 x 19 pine fold into the module.  The cutaway is for a duckunder.
crop2018-11-07 09.02.26.jpg 

Code 75 Peco flatbottomed track is being used, as it’s a good representation of NSWGR 80 lb/yard rail and has the correct sleeper spacing.  No. 6 points are jig built with Fasttracks jigs and tools.  These are 1050 mm radius, have good clearances and are straightforward to construct.  I’ve designed my own crossing timber cutouts which are laser cut.  The cutouts from Fasttracks have timbers too close together and too small, whereas the C+L cutouts have overwide spacing and timber size, for my prototype.  Brass and polyurethane chairs from Stephen Johnson Models are used under the stockrails with Proto 87 tie bars and heel blocks.    2018-11-07 09.04.38.jpg 

Use of the Fasttracks points allows track centres to be reduced from the normal 51 mm to scale 42 mm between the Up Main and Local Platform tracks and to scale 45 mm between the Down Main and Goods Siding tracks

(see pic 3)
crop 2018-11-07 09.03.29.jpg 

The module is the northern half of the yard including the station buildings, footbridge and northern pointwork.

Between the station and backscene is a cutting of varying depth, and a long row of shops with their backs to the tracks.  Between the platform and the front of the module are gardens.  The local council, Ku-ring-gai, has maintained gardens at the six railway stations in its area for over a century.

Most of the line passes through bushland, long stretches are treelined, and wildlife including wallabies, possums etc are still seen in the surrounding areas.

Buildings and structures come from a variety of sources

The island platform building is a Bergs kit which has been sold for many years, and is very useful as dozens, if not hundreds of stations have been built to this design.  In many cases these buildings had a roof extension over the lever station which was left in the open.  While the station was constructed in 1909, the frame was enclosed to make a signalbox around 1935.  The levers are a Wills kit assembled with levers in the Normal position vertical, as the original is a McKenzie and Holland frame

crop 2018-11-07 09.04.22.jpg 

The overhead booking office is laser cut to my design, with 3D printed doors, windows and other fittings.  The footbridge structure is Evergreen sections, the handrails are from MSE and the gaslamps (which do work) are modified DCC Concepts station lamps (perhaps not recognisable to the supplier).  Steps are Airfix, widened to a scale 9 ft.

 

Stephen Buck

Reply 0 0
Reply