John Edge Allegheny1600

Hello everyone,

My name is John Edge and I am a H0 scale modeller living in North Western England, halfway between Liverpool & Manchester but I am not really interested in football! I shall endevour to bring you up to speed with my ongoing layout by copying my old posts from elsewhere, I hope that's okay?

I am very passionate about German railways though, I love them all! I have a diverse collection of H0 equipment from Era I through to Era VI but lately I have come to love the old Prussian railways most of all.
For this reason I have started to construct a suitable Era I layout in my spare box room. I have built and arranged four boards in an “L” shape of approximately 2.70m x 2.15m, three boards will be scenic, the forth board is a traverser.
I have been working on a track plan and so far have come up with this (below)

21290539960_da7aa07cb8_c.jpg

I hope it at least looks “Germanic” if not exactly “Prussian”. I have had some assistance from a German forum in ensuring that it does follow some aspects of Prussian design. Where in Prussia? I have no idea, hence the name "Irgwendo"* which in German means "Somewhere"!
Why Prussia? Well, I originally followed the Bavarian railways for a long time but found that in DB days, I liked the look of the former Prussian machines better, they have become some of my favourite steam locomotives. A few years ago, a friend sold me a Brawa G 5.4 with DCC sound for only £100 and I loved it so much, I couldn’t stop and now have several locos and have been slowly building up my fleet of Passenger and freight cars.
Greetings,
John

*This was the layouts original name but I subsequently settled on Leberecht. I became very interested in the exploits of this Prussian general who was 74 at the battle of Waterloo.
I have also settled on an area: the Luneburg Heath area some 40Km or so to the south of Hamburg as I really enjoy trainspotting here in the current day. Luneburg itself is a very beautiful town with many attractions. I understand that post WW2 this area was not very nice (at all) but my layout is set in Era I, far before all that.

Cheers,
John.
Reply 3 0
Jaz Avalley JazAvalley

Oh dear! Another long time between updates.
My excuse is that I have simply been too busy to write anything! Now that I am taking a short break, I can do a catch up although I’m sure I missed taking some pictures that may have helped explain things.
Firstly, I built a small triangular ‘filler’ board for the corner where the layout turns through 90 degrees - this provides a base for some scenery beyond the railway itself, supports part of the backscene and hopefully, provides a way of getting rolling stock onto the traverser (more on this later).

43928349521_6574955238_c.jpg
28991645057_41f65afcb9_c.jpg

Now the weather had turned threatening so I re-assembled the whole layout in my box-room and gave my Prussian motive power a running test, this was very therapeutic and enjoyable. It also served to show that certain of my locos are unsuitable for use on the layout, sadly the lovely Weinert T13 0-8-0T is of too rigid a wheelbase to handle one short but tight curve and my Roco T14 2-8-2T is just too poor a runner - no real surprise there. Also, few of my tender locos will be suitable as they are too long for my little turntable.
My scenic expert, Doug had lent me some plaster cast samples of various items, including some lovely “old fashioned” platform sections. These showed that I needed to raise the area around where such items will be installed so I built up the area using strips of Woodland Scenics roadbed. Once this was done, the platforms looked much better.

Now, I had to tackle the job that so many folk hate - the ballasting. By now, time was running short and I had to get the layout to a certain state before I could take it to my very good friend, Doug’s house so that he can work his magic on the scenery.
So, I had to get a move on! I decided the least tearful way of doing the ballasting was to simply mask everything off where I didn’t want any ballast to appear.

43210049404_4c34213b56_c.jpg
43210048104_f419b4f6e9_c.jpg

Once the masking tape was in place, it was a simple matter to use a small spoon and apply the ballast. Now, I have had some dreadful experiences with ’real’ stone chippings in the past so this time, I am using C&L lightweight ballast, which I believe is made from crushed Apricot stones - it is supposed to be quieter than regular stone and was quite easy to apply. It seems much less abrasive of the finger ends as you work it into position.  
Once in place, I lightly moistened the area by gently spraying with ‘wet’ water, then applied diluted scenic glue from Woodland Scenics that does not set hard.
The trick now is once the glue has seeped into position - get the masking tape off quickly as it is a nightmare once everything has dried in place. By rinsing each piece of tape in a tub of water as it came off the board, I was able to recover quite a lot of ballast too. No sense being wasteful, I always say.

43210046184_0ba35bc200_c.jpg

Amazingly, each baseboard must have taken at least 8-10 hours to ballast but that includes all the cleaning up of all the rails after each session.
Before I painted the sides of each rail with rusty coloured paint, I spent some time cleaning off the little pieces of grit that had glued themselves to the rail, this was another rather tedious job but worth it, I feel.
The beauty of working on a portable layout is that it is so easy to separate the boards and turn them around to gain easy access to each side, saves a lot of backache.
In anticipation of this job, I had invested in a “Rusty Rails Painter”, a miniature paint roller with a drip feed type applicator. This made painting the rail sides go very much faster than when I’ve used a brush previously. However, I still used a brush to do the finishing touches on the points.

43023540685_71f5f0a97a_c.jpg
43879980902_127699d496_c.jpg

With a spell of clear weather on the horizon, it was back outside with the layout so I could now get the whole track-bed weathered. It had been a long while since I last used my airbrush so that got a thorough clean first, then a few practice blasts before I hit the track. After a couple of deep breaths, I did it, from both sides of the layout, first with grey then with track colour, cleaning the railheads both times. Remarkably, this job took only a couple of hours of quick work.

42119714400_b8ab6223f0_c.jpg
43879979442_9ce21df481_c.jpg

I had also started on my back-scene boards which for now, are simple strips of thin plywood, some recovered from other projects and are to be painted a neutral pale to mid grey.

43023515045_dddfaf66b2_c.jpg
30059417168_2ed77ba1b1_c.jpg
43210012104_2d16aaccf5_c.jpg

When coming to shield my traverser from public gaze, here is where I came across a hitherto unforeseen problem. The backscene has to shield the traverser including when at it’s fully extended position, otherwise the traverser is useless. When set up in my box room, the wall prevents the traverser from fully extending but in the open, it reaches beyond the width of the baseboard.
This would mean that the backscene has to be supported in fresh air!
My only visible solution was to build a baseboard extension for the traverser board and having done that, I thought that I might as well add a matching scenic extension board too.

28991643317_8d41be6bc6_c.jpg

The layout has now grown by three new baseboards however, only one of which is for home use and this was always planned anyway.
I was now in a position to finalise the backscene boards which then let me make a start on building the scenery ‘proper’. At this point, I was committed to adding “hills” directly to the main baseboards when Doug informed me that he had never worked on sectional layout scenery before and he wondered how we would avoid the very obvious joins between the baseboards.
This was now panic time for me as I have never gotten beyond this point before and was in brand new territory. Somehow, a flash of inspiration came to me - something to do with the new extensions for the traverser.
I reasoned that I needed one scenic section for home use (slim) and one separate section for exhibition use (broader). This gave me the idea of individual lift out sections that would have no joins in them as the sections can now span across two or more baseboard joins. I felt this was the kind of thinking that Iain Rice (a railway modelling and writing hero) might approve of, hopefully!

43928445961_8967133f9f_c.jpg

I gathered up all my remaining pieces of plywood but still had to form the larger section from two pieces and when it came to gluing the pink foam* boards onto the sub-board, I weighed everything down with all the heavy objects I could easily lay my hands on. 24 hours under approximately 150Kg worked quite well.

43928444671_c409752a1e_c.jpg

Now it was time to start carving the hills themselves - the smaller section I had attacked with an old bread knife but I found that quite hard going so with the larger section, I thought of using my hand saw. This worked well enough for the major profiles then I switched to my surform and was able to finish my landform quite easily.

43928443151_80f4a074fa_c.jpg
43928440401_c0857f8aff_c.jpg
43928437311_98222ce525_c.jpg
43928434281_4dd86540b0_c.jpg

With some logistical changes occurring at Doug’s house with regard to space issues, we agreed to work on my scenery together at my house so I cleared an area in my big shed and set Leberecht up there, ready for a site inspection by Doug.
I’ve now ended up with Doug’s impressive collection of scenery building supplies at my house and additional jobs! I had built the faces of my cutting too close to the track, leaving no room for actual scenic treatment so we agreed that I will cut that area back somewhat. This will allow us to add some treatments that should completely disguise where the terrain joins are. 
Having worked almost full-time on the layout for the past few weeks, I am taking a couple of days break - mainly for family matters so that’s all for now, Folks,
John.

*Why are these so hard to obtain in the UK?

liking your take on terraforming with the foam, and incidentally Allegheny 1600 lovely to see you again 🙂

Jaz Avalley

Model Railway Discussion Group

https://www.facebook.com/groups/495282280644117/
Reply 1 0
John Edge Allegheny1600
Many thanks, Jaz!
It's nice to 'see' you too!

I cannot give a very detailed description of the next stages of the layouts construction as that was in the capable hands of my scenery guru, Doug Coombes, I can only show some photos he sent me as updates while I was getting some relaxation in.

I do know that Doug spent some time studying and practicing the techniques of Josef Brandl and Gordon Gravett but this was long ago although I believe he gave himself a refresher course before starting work.

First, Doug painted the plaster castings.
[31222958498_71df9b0ec6_c]Scenery on Leberecht by Allegheny1633, on Flickr

You can see how difficult it was to disguise my crude attempt at filling the gaps between the castings, sadly this caused Doug much angst and he had to paint over my filler several times, leading to a darker finish than was otherwise necessary or wanted.

[31222958548_f77f9146b4_c]Scenery on Leberecht by Allegheny1633, on Flickr

[31222958618_fcedef5d5b_c]Scenery on Leberecht by Allegheny1633, on Flickr

Fortunately, I had not used any filler on the retaining walls so they came out much more satisfactorily and won’t need to be redone.

Next came the grassing with the electrostatic gun.

[31053760678_572e0d6563_c]Greece 2018 by Allegheny1633, on Flickr

[31053760668_3dfc32887b_c]Greece 2018 by Allegheny1633, on Flickr

While I’m working rapidly through the photos, I must point out there was a lot of work just to get to this stage. Each static gun use only covers a relatively small area of terrain, partly because the charge fades away if working far from the earthing nail and partly because of the need to work onto wet PVA.

After grassing came the weeding, that is adding weeds, not removing them.

[44876851692_f369c11acc_c]Greece 2018 by Allegheny1633, on Flickr

[44876851782_4054cfb812_c]Greece 2018 by Allegheny1633, on Flickr

Next, trees were added and more weeds around the bases of the trees.

[44206605164_428572aa4e_c]Greece 2018 by Allegheny1633, on Flickr

[29990088717_b061b3e369_c]Greece 2018 by Allegheny1633, on Flickr

I had researched the types of tree to be found on Luneburg Heath and they included Spruce, Birch, Beech and Juniper. Most of these were available from MBR Model of Poland https://mbrmodel.eu/en/ and I was very grateful that they had them all in stock and could ship very quickly indeed, this certainly saved my bacon. It may have been ‘nice’ to build my own trees but I have neither the experience, time nor motivation to do so when such magnificent models are available for a fair price.

Probably the most important signature flora on Luneburg Heath however, is the heather which appears to grow everywhere and puts on a magnificent display, MBR do a purple shrub that looked a good match for the original.

[29990088657_e7aa1d2e5d_c]Greece 2018 by Allegheny1633, on Flickr

[44926827131_48149f1a87_c]Greece 2018 by Allegheny1633, on Flickr

Actually, I think my heather is a still little tall despite Doug cutting it down from the original but it is the best I will get until Doug or I learn how to make it ourselves so it will stay for the time being.

Finally, Doug then carefully masked off my track and added additional fixatives to secure the greenery and added further detailing such as ‘flowers’, ‘weeds’ and grass between the tracks and so forth.

[44876850892_0a659dff06_c]Greece 2018 by Allegheny1633, on Flickr

[30802851988_4650bbd9be_c]Scenery on Leberecht CC. Doug Coombes by Allegheny1633, on Flickr

While Doug was busy in the UK, I took my time in Greece to assemble in ‘flat pack’ form, my station building. Unfortunately, I didn’t take any photos, sorry. I had to build it in this way as I was so scared of it getting damaged on the flight home as it would have been too late to repair it by then.

Next, the return home with just two full days prior to the layouts first exhibition appearance. Never again will I subject myself to this level of stress.

All pictures © Doug Coombes.
Cheers,
John.
Reply 2 0
Brian Considine
Excellent work John - nice track plan without looking too crowded.I do like the C & L rail protectors.

Regarding the "pink foam board" an alternative easy obtainable source in the UK is "Kingspan" (a trade name, but there are alternatives). I have used it for the main baseboards for "BelmontBahn" our new 24 x 10' exhibition layout.
Reply 1 0
John Edge Allegheny1600
Thanks, Brian!
That's a useful tip, I shall check it out but I mostly wanted to say that it's really good to 'see' you again, it's been a while. I hope you're well?
Also, are you posting anywhere about your new layout, sounds impressive.
Cheers,John.
Cheers,
John.
Reply 0 0
Brian Considine
Hi John,
A lot has happened since my departure from "you know where", but otherwise I am fine thanks - & you ?
Several false starts with "BelmontBahn" but it has now had 2 showings as a "work in progress" & will be at the GRES show 3/4th November.
If anyone is interested I will start a thread on the planning, construction & pitfalls.
I also produced a review on the "Piko Smart" DCC system (which was on Peters website) that I will post here.
Still getting to grips with the Roco Z21 & may produce some notes & observation on that too.
Reply 1 0
John Edge Allegheny1600
Hi Brian,
Thanks for your reply and yes! I'm pretty good, thanks.
Well, I will certainly be interested if you start a thread on your layout and also very interested indeed on your notes on the Roco Z21 as I received one for my fiftieth birthday and am also still getting to grips with it and I'm 53 now!
My next instalments on Leberecht will include an amusing story about that.
Cheers,
John.
Reply 0 0
John Edge Allegheny1600
Now to try and describe the stress that I went through upon my return from holiday!
Despite having had a wonderful break away from everything, when my wife and I returned to the UK, my feelings of anxiety returned with a vengeance as there was so much still to do. We also had some rather rainy weather to contend with too that caused a delay in collecting the layout but I busied myself clearing the kitchen as my lovely wife Bev, had allowed me to assemble the layout here rather than down in the big shed. It meant that work could be carried out in comfort.
When I did get over to Doug’s and laid eyes on the layout, I was stunned! He really had done an excellent job, I must say.
After some discussion, we added some further vegetation to certain parts of the scenery and changed some grass colours to darker shades, other than that, I was very satisfied with how the scenery looked.
We then transferred the layout over to my kitchen and set it all up again. This at least was good practice for the exhibition.

[44751884862_4ce23093f5_c]Leberecht by Allegheny1633, on Flickr

I now had to start working my way through the extensive list of jobs I had written whilst in Greece, the first job being to ensure greater reliability of the action of the points. My first thought was to superglue the actuating rod to the tie-bar. Big mistake! What had been inadequate performance previously was now rendered completely useless. Bev came to the rescue thankfully, with her suggestion for more substantial actuating rods, sourced from her jewellery making collection. A bit of filing and cutting later, the first new rod was installed and worked beautifully, thanks Bev! This was repeated for all the other points, what a relief when they all worked.
Next, I had to assemble the station building but first, I wanted to recreate mortar lines in the brickwork. Some folk use “Jif” but I had heard good reports about “Roberts Brick Mortar formula” so I gave it a go. Unfortunately, due to the pressures on my time, I left it longer than needed so it set harder than it should have been but scraping with a toothpick resolved this issue and I was quite satisfied with the results. It was then very quick and easy to assemble the flat-pack parts of the station building, I was very pleased with how it then looked. Small details still needed to be done but it was at a good state for the show, especially after I gave it a quick blast of weathering from my airbrush.

[43932889360_a37434ebb5_c]Leberecht by Allegheny1633, on Flickr

[45750643321_b89d40df93_c]Leberecht by Allegheny1633, on Flickr

Boosted by this, I then gave the mortar treatment to the loco shed and all the components for the water tower, which I then assembled quickly but accurately - I’ve never built a building so fast! I hasten to add that I had built the loco shed previously, it was only the water tower I built in a hurry. These two were also treated to a quick airbrushing for a much improved appearance.

[43731555110_646c4b01b6_c]Leberecht at Leigh show Sept 2018 by Allegheny1633, on Flickr

[30607961707_c4940bf72c_c]Leberecht at Leigh show Sept 2018 by Allegheny1633, on Flickr

Whilst I was doing these jobs, I was also working on many other jobs, some of which caused a major meltdown like when I initially connected up my Roco Z21 digital controller. Previously during testing, I had always used my trusty NCE but I thought that Doug would prefer to use the Roco Multi-Maus, hence the Z21.
Unfortunately, it turned out that I had connected on of the serial leads into the wrong socket on the wireless (wi-fi) terminal so there were red lights flashing on the main black box! I thought this meant there was a major ‘short’ on the layout so panic ensued. Fortunately, Doug gave me a talk-down and, feeling calmer, I re-read the instructions, connected everything correctly and voila! We were in action and the electrics and points were now working as they should.
I also finally wired up the turntable and was very pleased when it worked perfectly, what a relief!
Having gotten so far, I really wanted to fit my Viessmann signal as I really love the action on these mechanisms but I only had a 12mm drill bit. I managed to enlarge the hole by waggling the drill bit but sadly, the signal went in at a slight angle, never mind! Unfortunately, I then discovered that the output of my Lenz accessory decoders was incorrect to drive my signal, Grr!

[30810601587_05c0afb19d_c]Leberecht by Allegheny1633, on Flickr

Meanwhile, Bev was busy finishing the painting of the back-scene boards and also making a front ‘skirt’ from some green cloth that I had bought for my US layout but never got around to doing ‘properly’, this entailed cutting to the correct height, stitching the edges and fitting ’Velcro’ so the skirt can be added and removed easily.

[30607962307_400ec1e155_c]Leberecht at Leigh show Sept 2018 by Allegheny1633, on Flickr

Also, Doug and Bev did some ’tidy up’ painting of the baseboard edges where there were still pink foam edges on display(!) along with additional ballasting right up to scenery sections, buildings and so on.
I had wanted to at least get my freight stock weathered before the show but time was running so late, I only had chance to make sure everything was fitted with Kadee couplings and the one loco I knew was iffy, got a clean of wheels and pick-ups.
By now, we had reached Friday tea time so it was time to get the layout over to the exhibition venue.
Until next time.
Cheers,
John.
Reply 0 0
John Porter Greyvoices
I have enjoyed reading through your Leberecht thread John. Impressive work.

What has happened to the layout since 2018?

Best regards ........... John Porter
Reply 1 0
Reply