IanTG

At least I’ll remember when the layout started!

This is my second attempt at a layout. The first was short lived, started about 18 months ago, and taught me a lot. Not least, I’m not a good carpenter as the baseboards let me down. Sundeala tops that warped and poorly fitted framing.
So this time I’m using professionally built laser cut ply.
The space is 3.5m x 2m, and I wish to end up with a layout that provides interest and fun to operate. Hence, I accept I will not achieve a ‘railway set in the countryside’ look, and probably will have baseboards which to some will seem too full of track.
The wish list includes a reasonable size passenger/goods terminus station, twin track circuit for watching the trains go by whilst doing other stuff and a reverse loop. Era is loose, but somewhere across steam/diesel mix in a non-specific location. In other words, running what takes my eye, but not stretching credibility beyond breaking point!
A few pics of early progress. 1289243E-3DE7-43BA-A0D2-D02AC8832270.jpeg  1D8D7D8E-B792-47C0-B4C7-B7FC7F816236.jpeg  B73DBD03-8929-462F-9641-F3F885B9DFEB.jpeg  4DC0D944-E126-4DE3-AC72-D2DB7385D37E.jpeg  7A713DFC-A8A1-4FBA-80DB-73E2444F484B.jpeg 

Reply 4 0
IanTG
Other needs include sufficient storage space for the locos and rolling stock I’ve accumulated, so plenty of siding space and some storage loops; these latter have evolved to be in two locations, one being below the terminus station board, and the other on the diagonal board across the door opening. I’m still pondering how to treat this one - visible or hidden. I don’t intend to do much fiddling, more holding trains. I probably won’t make my mind up until I see everything in place, as I think it may be difficult to justify the terrain to allow it to be hidden, and the loops are on lovely sweeping curves, so look good with trains going through them.
Reply 2 0
Bunkerbarge
I also made some really bad choices with the woodwork but I'm going to be able to 'consolidate ' things as I progress.  I've already gone too far to have the inclination to go backwards!

Nice space you have there and a great name!
Reply 1 0
Julian
Nice boards, there should be plenty of space to play with there.

Julian
Reply 1 0
IanTG

Work and Progress continue in that order, though it always seems more of the former to achieve less of the latter, doesn’t it? Track (at least of the lower level) is now all down and wired. Had a couple of problems on frog polarity on a couple of points but now sorted. I decided to add in a last minute hidden siding to accomodate a DMU after its left the branch passing station. The space was already there, and the time of relaying that piece of track, and the cost of an extra point/motor seemed worthwhile. The inner circuit now has a hidden storage loop and this new siding, plus a passing loop at the single platform through station. There’s also a goods siding off this latter loop, probably for an industry yet to be decided. The outer circuit has four storage loops, which are probably going to be in scenic full view. I had thought about hiding these, but at the moment, the scenic credibility to do so looks stretched. Plus, I don’t want to hide some good looking (to me) sweeping parallel curves.

 I bought a lorry reversing camera/screen (brand new) off that well known auction site for about £15. At that price, I thought it worth experimenting with viewing the hidden storage loops/siding. Initial hand held testing looks like this will work fine.

Although there are continuous twin track circuits (plus the line terminating in a fair sized terminus), I’m trying to give (allow) myself the operational flexibility to run either as a twin mainline and/or as separate single tracks. Not very prototypical, I know, but as mentioned above, the two circuits have different features. Once fully up and running we’ll see how this works out.

photos show the 2% incline up to the terminus. This has to complete almost a full circuit to get the required length in, and thus is forced to run parallel to the twin continuous circuits. One comes to realise that modelling is like buying a house - you never get every feature you want; compromise becomes the most significant feature itself.8E2511E1-602A-45D8-9AE0-EE24F43D35EC.jpeg  BB49D84C-8142-4A5B-BEBF-33189AA8827B.jpeg 

Reply 3 0
Bunkerbarge
Lovely long smooth incline, that should keep it within the capabilities of most of your locomotives.

As for your industry, obviously a gasworks is a main focus of attention for me at the moment but one thing I have an eye on for in the future is a brick works.  I also like the idea of a boat yard on a canal or even a dock yard, which may or may not incorporate the dock and a ship.
Reply 1 0
Mac-
IanTG wrote:
Era is loose, but somewhere across steam/diesel mix in a non-specific location. In other words, running what takes my eye, but not stretching credibility beyond breaking point!


I'm a believer in it's your model railway, and your hobby for enjoyment, so you run and lay track to what makes you happy. When mine was up it would get Thomas the tank engine and his mates running havoc around the railway, at least they were steam 😉.
Reply 1 0
IanTG

Finally got round to turning attention to the upper board, which will house a 3.5 x 0.6m terminus station. It’s 150mm (surface to surface) above the lower board, and to allow max clearance for access etc, I decided to use 25mm aluminium tubing to provide support to this upper board (12mm marine ply). I ordered the tubing precut to a whole array of sizes so that support legs avoided tracks etc. below. It all slots together using junction blocks, with the board being screwed into the aluminium. Apart from one length which spans where the control panel drawer sits under it, the lengths of tubing between support legs varies between 240mm and 500mm.

here it is under construction in the garage, before moving into the railway room, in two sections. Framework, boards, tracks, wiring etc will all be done in garage, before each section is moved into railway room.
615232C0-1E7E-4E4E-9F70-C874190A6038.jpeg 

and a quick trial fit in situ....

3051A058-8C0C-4F30-87B4-3BE38BCA7E19.jpeg 

one learning point.... because each junction block has a 2” insert to fit inside tube, I realised that when it came to joining the two sections in situ, I would need 2” longer than the room is to fit the two together! Solution will be to cut off the last lug, and size the baseboards precisely to join on an aluminium crosspiece, thus they can be screwed onto it.

Reply 2 0
Jaz Avalley JazAvalley

Love the name 🙂.

I think it is a fact of life that however much effort you put into a first layout, there are always factors that you end up thinking lacking, and to be fair you'll have those issue with your second, third etc layouts 🙂. But as long as you enjoy the journey and succeed in doing parts that make you happy, you'll find it hard to resist to working towards that dream in the sky, the perfect layout, with all the factors you want.

I sometimes think Smallscenes has the idea, by doing small bit you can get a sense of achievement and completeness. Something new and challenging. I try to do that it one large layout, which is often like trying to stick a size nice in a size five shoe 😃.

Your standards have clearly risen, you have the bug, the first choices you did not like have not put you off the hobby, welcome to heaven...or hell 😃

By the way, is it looking good so far.

Jaz Avalley

Model Railway Discussion Group

https://www.facebook.com/groups/495282280644117/
Reply 1 0
Reply