Mister Rusty

Now, at first glance this looks no different to the DCCconcepts' suggestions, however, l will explain.
I made the decision to minimise utterly any wiring under Buchshee.
To this end, l identified that by feeding the Cobalt iP Digital points from the track, a short wire would ensure. Hence the fly-leads in the photo below.
15671178743031927266083977413659.jpg
These are an extension of the suggested bridge wires from stock rails to switch blades.
Initially, l used a coded twin-core  wire to identify which wire went where for  motor connection purposes, but if the point trailed rather than faced traffic, then that would be wrong .
For the same reason, l ruled out using red and blue , per rail code convention.
I considered dropping the 2 wires through one hole, but then how do you identify which rail is connected to which wire to which point terminal?

On my drill jig (which also works for the long 'Y' point), l decided to drill 2 holes, thus as the point is lowered into position, the wires automatically are identified correctly by which hole is under which rail -simples!
I do dress all my track work to be universal within my own constraints, so l dressed all my points before starting laying track.All pertinent point holes were drilled into the baseboard from topside, tie-bar, 3 wires, (2 feeds, 1 frog), motor mounts. 8 in total, pilot size being the same as motor mounting screws.
The jig?
A pair of Peco med.rad. track templates glued back-to-back  on the ubiquitous piece of balsa.
The holes are drilled through, the one for the tie-bar actuator being piloted at this stage, enlarged appropriately after the jig is removed.
The point's 3 wires are now fed through, the frog wire being bent against the underside to assist in holding the point in place whilst the point motor is fitted on its 4 screws and sticky pad, the actuator arm fed through the tie-bar, left uncut at present.
The hole for the frog wire is between the 2 diverging roads in a central  position under the frog. This allows the jig to be symmetrical with no ambiguous  options of drilling in the wrong place.
 I always mount my point motors to be between the tie-bar and the frog, it makes wiring easier and shorter  as all wiring is there.
With my boards being 3'9" (45") (1100mm)(110cm)(1.1m) in length, my buz is connected at each end, forming a parallel feed to the rails, from one board to the next, thus my buz sections are 45" long. They are quickly detachable for trouble-shooting, parallel feeds can be a nuisance, making fault diagnosis complicated.
All IMHO, of course.
Oh, SETTLE down oop Norf.
Yes, you read it correctly, l have fitted  a buz.
Why buz?
1 - I sit on a bus when l go to town.
2  - it's  how I say it. 😉
 Gets coat and shuts t'door
Nighty night
Pete
 p.s. When l relaid Buchshee, all my points were thus prepped, and took no more than an hour to lay the whole station. Track cutters sped the job up brilliantly,  thanks DCCc.
Once the track is in position, l use superglue (just spots) to fix it down. If it needs to come up, it is no worse than PVA, and it sets a damn sight quicker.
Lift the track with a narrow domestic paint scraper or a table knife [usually blunt] if necessary, the flatter the lift, the straighter the track for re-use.

   15671206701975040890245570335445.jpg     15671208035455662739816908219066.jpg 
Tidiness (lack-of) 
It's the back-end of 5 hours modelling and 4 hours on this website. [no complaints, though]
I enjoy your outputs, l hope that you do mine.
Also, it still a work-in-progress,  so forgive any rough bits, but please point them out, l may have missed them.
A question (if you're still with me)
How did l do the platform edge? It's  devious, but simple.
15671211282696134902527148232554.jpg
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 0 0
Bunkerbarge
If I read this right Pete I think I do the same as you but in a slightly different way.

2063_182227_360000000.jpg 
Reply 0 0
Mister Rusty
Bunkerbarge wrote:
If I read this right Pete I think I do the same as you but in a slightly different way.

2063_182227_360000000.jpg 

Yep. my wires are  fitted ''to the centre'' and deliberately the same coloursas explained in the post above.
If dressing them one at a time, then colours can be used to suit the location, however the time-saving was considerable, as l did not have to keep setting up a solder station, finding where the wire had run off and hidden, knock over the flux.
The overall time per point laid is considerably reduced by the batch-production.
Why the mania about time-saving?
Just look at what my input has been as l wrote up yesterday's work. Only the points post is prior un-written work.
Just wait until l get on to my next project.......................................
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 0 0
Stimpy
I really like your scene seperation with that bridge work.... I've to do that and the job has been staring at me for 5 weeks now, just can't get started.
Reply 1 0
Reply