jed10
I'm about to order the first batch of 12 IP Digitals to start installing on our N gauge club layout.   The track is laid on modular boards which are sturdy and also lightweight but the top surface is only thin ply which means it won't be possible to screw the motors on to the underside of the board.

My current thinking is that I'll cut some small squares of 9mm ply just slightly larger than the Cobalt sticky mounting pad. The motors will be screwed to these bits of wood (should I still use the sticky mounting pad between the motor and the bit of ply?). Then we'll hot glue the squares of ply to the underside of the baseboard.  This way it will still be possible to remove the motors should that ever be necessary.

Has anyone come up with a better idea than this?
Reply 0 0
Morgansp
That is very similar to the way I have fixed nearly 35 motors. I made a template to drill pilot holes for the mounting screw positions so it would allow a bit of adjustment in 9mm birch ply. The soft pad is used between the motor and the ply. You may still need to shorten the mounting screws a little. I filed them off the back of the mounts before fixing.
Hope it works for you
Steve
Reply 0 0
jed10
Thanks Steve, it's really good to know that I'm on track!  Did you use hot glue to fix them?
Reply 0 0
Morgansp
Hi Jed
I normally like things to be undo-able so used 13mm long by 3mm dia countersunk wood or self tap screws upward into the baseboard which is also 9.5mm thick. If your baseboard is thin then could I suggest using say 3mm countersunk screws downwards through the board with washers and nuts on the underside? Some superglue on the bolt heads could be used to hold them in place once you are happy with the positions. The holes in the pattresses could also be slightly larger to provide extra adjustment.
A photo is attached from my OO layout. DCC Cobalt Underboard point mountings.jpg
Reply 0 0
Alastairpell
I have a number of IP digitals that I got lazy with and are only stuck on with the sticky pads that came with the motors, I resisted temptation and waited a day before setting them up, so far they have stuck fast 😉 mounted under decent quality Ply. 
Reply 0 0
AHJAY
The provided self adhesive pads are excellent and as long as the surface they are stuck to is appropriate, NO screws are really needed. 

HOT GLUE - by all means glue the wood with it, but NOT the motors. Unnecessary and potentially a deal breaker for later removal and warranty

Ahjay
Reply 0 0
jed10
Don't worry Ahjay, no hot glue anywhere on the Cobalts. They are mounted, using the self adhesive pads, on to 45mm squares of 9mm ply and then also screwed to the ply using the screws provided so can easily be removed in the unlikely event that this becomes necessary at some time in the future. The other side of the plywood square is then hot glued onto the underside of the baseboard. A couple of tiny 8mm x 3mm countersunk head screws are then put in from the top surface of the (3mm) baseboard into the plywood squares to provide an extra fixing for added security.  Each section of the baseboard is 900mm x 400mm and it is completely demountable for storage berween running sessions so we need to fix them quite securely to be sure they won't drop off when being moved around. 
Reply 0 0
AHJAY
LOL, just thought I'd mention it - we actually had a magazine article suggest hot glueing them once - I was really annoyed as its NOT the right way to do it and I thought the article was a clear example of why so many magazines lose credibility when a staff contributor thinks they know more than the Mfr... when they really do not.

BTW we tend to seal the board, add/test the motor with only the sticky pad, then add the screws, removing them after a few hours as the foam pads stick like you know what to a blanket lol. Removing the screws partially decouples the motor from the board, lowering noise a little more.

regards, Ahjay
Reply 0 0
Reply