Peter Herzl
Greetings all.
I am not very experienced with electrics/electronics and have a problem that I would appreciate some
help on.
I have a PECO 3-way Wye point as shown in the attached photo (it looks small in my Preview pane so you might need to click on it to enlarge).
Roads 2 and 3 operate normally but locos get stuck midway through Road 1. I tested the frog and found that although power is getting through to one half, the other half is dead. I pulled the frog wire out of its Cobalt Digital No. 3 terminal and re-inserted it but to no avail. I would think that if power is getting through to one side of the frog then there is no reason why it should not be getting through to the other side but then I am no expert, hence my pleas for help.
Could it be a switching problem within the frog switch of the Cobalt Digital motor or is there any other cause you can think of to steer me in the right direction?
Unfortunately, it is the most difficult to get at and as it is ballasted would be very troublesome to remove for closer inspection.
Thanks in advance.
Peter
Model Rail - Wye point problem.jpg
Reply 0 0
m.bryan
The two short rails leading to the frog should be bonded underneath - and also connected to the frog itself.
Do you get all three parts live when the point is switched in one particular direction?
If not, then it looks like the bonding may have failed - it's not unknown.
The solution - without lifting the point -  is to solder another wire to it and connect that to the existing frog wiring.
 
If both rails and frog are dead when the motor is switrched over, then that may indciate a switch failure withing the Digital motor.
One possible quick fix is to use the S2 terminals to switch the frog - connect track power to S2-L/S2-R and frog to S2-C
Swap L and R if the polarity is incorrect.
 
Regards
Mick
Layout Concepts Tech/Customer support
Reply 0 0
Peter Herzl
Thank you Mick. I am very grateful to you for taking the time to advise me.
Attached is a new photo showing (in red) which rails are powered when the 3-way point is switched to Road No. 1.
I disconnected the frog wire and checked the "continuity" with a Multimeter and that showed continuity corresponding to the powered rails but no continuity for the non-powered side of the frog, so do you think this means the bonding has broken down? Strange thing is the point has not had much use although it is a few years old. If you confirm it looks like the bonding do you think it is worth reporting to PECO so they can look at their design/manufacturing?
BTW - is there a way to make attachments like my photo larger on this Forum?
Model Rail - Wye point problem2 .jpg
Reply 0 0
m.bryan
It looks like the bonding has failed.
Use of the point is unlikley to cause the bonding to fail.
Temperature variations can as the metal expands/contracts.
 
By all means contact Peco.
Mick
Layout Concepts Tech/Customer support
Reply 0 0
Peter Herzl
Very many thanks, Mick, for your expert advice.
I have informed Peco and a man called Andrew Beard replied to confirm that this problem is "very rare". I wonder?
Very best wishes to you.
Peter
Reply 0 0
Derekl
Hi - I had this problem which was apparent before ballasting - I simply put in bridging wires where appropriate and it now all works. The point was new when laid, so it is unlikely that built in bonding had failed. I assumed I hadn't followed the instructions correctly. Without ballast in teh way, it was easy to sort out.
Reply 0 0
Peter Herzl
Just to let you know that I have fixed the problem by soldering a dropper from the frog's faulty side down to the original Peco frog wire and all is now working again. So tricky in-situ and fully ballasted without melting the plastic!
I can only think that the recent failure is due to perhaps a weak bonding during manufacture that gave out during a movement of the board. Anyway my other two 3-way points are still working OK so fingers crossed.
Thank you to Mick for correctly diagnosing the issue and setting me off in the right direction.
Best wishes.
Peter
Reply 0 0
m.bryan
Peter Herzl wrote:
Very many thanks, Mick, for your expert advice.
I have informed Peco and a man called Andrew Beard replied to confirm that this problem is "very rare". I wonder?
Very best wishes to you.
Peter
 
Hi Peter,
IME of Peco points (40 years or so!), it is very rare for the bonding to fail.
 
Glad you've got it sorted.
 
Regards,
Mick
Layout Concepts Tech/Customer support
Reply 0 0
Reply