river6109
Hi, here is anew video captured today with a busy train shedule

Ein Eisenbahn Video für den Feinschmecker,
endlich hat mein Sohn die Gleise 4,5,6,7,8, und 9 in Betrieb gebracht und slles ist automatisch mit opto Kupplern gesteuert aber da ist noch viel Arbeit dabei um alles automatisch zu steuern, Im moment können Diesel und Dampflokomotiven ihren Dienst leisten

Eventually my son has been able to activate track 4, 5, 6, 7, 8 and 9 for diesel and steam locos., it is run automatic via a sensor system with opto couplers doing the job. there is much more to do on the other stations to make it all automatic.

enjoy the video

Quote 1 0
Bunkerbarge
Absolutely beautiful.  I think that is the first time I have seen a catenary system that is completely properly tensioned.
Quote 0 0
Andywp
Das ist absolut ausgezeichnet. What software are you using RR&Co?
Quote 0 0
river6109
Andywp wrote:
Das ist absolut ausgezeichnet. What software are you using RR&Co?


Danke vielmals, no software is used, its all done via optocouplers and braking modules
Quote 0 0
river6109
Bunkerbarge wrote:
Absolutely beautiful.  I think that is the first time I have seen a catenary system that is completely properly tensioned.

It is also powered via the overhead system, thanks for your compliment
Quote 0 0
river6109
its been a busy time here at Moosburg, my son has been able to get the automatic operation of most of the lines finished and we had some issues but we sorted them out and now its running flawless.

Quote 1 0
river6109
Bonn Hauptbahn Hof: some shots are a bit shaky but the rest seems to be ok.

Quote 1 0
river6109
Easter Video No 1 : another step forward but still a lot has to be done on the snow module: braking sections have to be ascertained, opto couplers installed between sleepers (sensors)

Quote 0 0
David S Forrest Dave F
I assume this is Moosburg near Munich. When my uncle was there in 1942 it was only a prison camp, which is evidently how the town was started, (he was a POW). I have Moosburg on my bucket list for sentimental reasons and now a station visit is added.
Many thanks for this.
Quote 0 0