My initial thoughts on point rodding and what was installed on the first few points on the layout used square section 0.8mm brass rod in straight runs to the operating arm.  Originally the Cobalt SS motors were to be hidden by lineside huts and other bits and pieces and the illusion would be enhanced by the use of Ratio plastic points rodding kits laid up to the brass rod.  Challenges were experienced with the installation in such ways as bending the rods to a fine profile and it looked a bit over scale but, from what was available at the time, I was happy that it could be made to look relatively realistic.  

2063_082011_030000000.jpg 

Since the installation of the first few points I have occasionally experienced a challenge with a point not moving, which I have put down to interference, probably at the ends of the rods, which may just protrude a touch too much and were going to be filed down slightly.  I also realised that there was a danger of a short occurring between the rails so a piece of plasticard was inserted and glued below the rail to insulate it.


2063_082011_440000000 (1).jpg 

As mentioned the intention with my 0.8 mm brass rods was to supplement them with Ratio rodding to enhance the look of the installation however as this was all being tried tested and considered DCCconcepts decided to throw a spanner into the works by releasing their own operational points rodding system.  Luckily I didn't have too many points installed at this time so I had to decide on whether I wanted to change direction and go with the new system.  As it had the potential to be far more scale looking than the system I had trialled I had to at least give it a go.  I decided a suitable starting location to trial the system was at a place on the layout where a crossover and a siding point at all operated from and could realistically be controlled from a signal box.  I really wanted to have a go at this so I bit the bullet and purchased the point rodding starter set from DCCconcepts and, as my scenic progression was almost at the point where three points are located on the upper level, I decided to have a go at installing them.  I would normally advocate trying something simple and straightforward for a first time however, as two of the points in question are in a crossover and all three are operated from the same control unit I thought the three would make a good convenient starting project and an opportunity to really see what the strengths and weaknesses of the new rodding system are.  I basically thought that if I can sort out these three then everything else after that should be that bit more straightforward.

The rodding is also required to go underneath an adjacent track, for which DCCconcepts recommend using their own system of wire inserted into a flexible plastic tube embedded into their foam underlay.  I haven't used their underlay, plus I wanted the installation to look as scale as possible so I really wanted the rods to go under the track in much the same way as real rodding is routed.  I also wanted the operating rods to emerge from the signal box, which would therefore have to hide the motors so I was stacking up the challenges even before I started.

When the starter set arrived I gave it a good once over and studied the contents of the packet.  The thing that struck me more than anything was how fine the rods were.  I measured them up and they came to 0.4mm square section rod, half the size of my original rods.  It was obvious that they would need the supplied stools for support to prevent flexing and I had to consider the fact that a rod going below the track might require support in the ballast, which would be a shame as I wanted the rod at this point to look as prototypical as possible.  I quickly came to realise that a lot of this installation was going to be of a trial and error nature and that there was possibly going to be a lot of deviation from suggested practises.

The first job was to remove the original brass rods and Cobalt SS motors from the three points and take a deep breath before embarking on what I anticipated as being quite a bit of work and probably quite a steep learning curve.

Reply 3 0
Robin Sundt Echini
Thank you very much for your detailed description of the rodding and your experiences with it. I am still working on laying the tracks and contouring the layout but I am looking forward to trying out the rodding and trying to get it to work on "Shalford". I am in awe of the detailed work that you did on the signal box - it looks fantastic.
Reply 0 0
WarleyMRC
its coming along nicely, great effort looks great
Reply 0 0
Bunkerbarge
Echini wrote:
Thank you very much for your detailed description of the rodding and your experiences with it. I am still working on laying the tracks and contouring the layout but I am looking forward to trying out the rodding and trying to get it to work on "Shalford". I am in awe of the detailed work that you did on the signal box - it looks fantastic.


Many thanks, I think of all the areas of modelling I enjoy the most it is creating the detail.  I studied a lot of internal photographs, including period shots of Scopwick Signal Box to get a feel for the type of things that might be found there.  I just hope I can do justice to the remaining rodding work and then the scenery around it all.
Reply 1 0
Bunkerbarge

Not wanting to be completely out of it all over the Christmas period I have managed to keep things going a little.  The point rodding is now all complete with the three points controlled and powered from the Cobalt SS motors below the signal box and the two dummy facing lock rods installed purely for effect on separate stools.  If I was starting again I would probably put everything I have learned into it and routed the rods slightly different however, being my first time with the system and using them in a way they were not really originally designed for I am overall happy enough with the appearance and operation.  So far they have not given any challenges in operation despite repeated changes on a daily basis to 'prove' they are working reliably.  So with the rodding installation now complete it is time to turn attentions to the completion of the scenery and, much more critically, the painting of the rod system, including the cranks, stools and the lock units.  My concern at this stage is what process to employ to paint up the items without causing any challenges with the operation as a result of paint getting into places where it shouldn't be.  I have toyed with a number of possible approaches, however, whatever method I go for I need to progress the surrounding scenery so attention now has to move onto that.                            

P1050246.jpg 

P1050251.jpg 

Reply 0 0
Bunkerbarge

With the rodding installation now complete it is time to turn attentions completely to the scenery aspect of the area.  At this point I have an idea now of the process I want to employ to ballast and finish the track and surrounding groundwork so the first job was to prepare things by first of all doing a little bit of landscaping.  Here I wanted to take a great deal of care over this as too much would immediately stand out as being 'false' whereas doing nothing was going to look unrealistically 'flat' so I needed a fine balance.  I decided to add a few pieces of cut up corrugated card to sit against the wall, which was providing the transition to the backscene.  This was deliberately kept low and fairly flat but was built up slightly and blended in by the use of filler paste on top.  The filler was smoothed over with a plastic spatula frequently dipped in water and washing up liquid to give a fairly smooth contoured surface and provide some relief.

P1050249.jpg 

When the filler had all cured overnight the entire area was given a base coat of the same emulsion I had made up for the track base.  This is nothing more than a dark brown domestic emulsion, mixed up by my local hardware shop and decanted into a small pot for small area painting such as this.  The rods were carefully painted around and the bases were all painted as these will be mainly covered with ballast and chippings later.

P1050248.jpg 

After the ground work had been completed I turned my attention to something I have noticed a number of times when studying pictures of signal boxes and that is a wooden walkway for the signalmen to traverse over the bare rods as the rods exit the base of the box.  I started off with a piece of my favourite deck planking material and cut up a suitable length to form a walkway with a couple of supports underneath it.  With the base now slightly contoured with filler the supports required individually tailoring to ensure the walkway fitted square and level with the box.  I finished it off with a quick wash of enamel track wash, watered down significantly with thinners to ensure the plank edges still show through.  It will be completed with some pigments to make it look a bit more worn when the surrounding area is finished.  I was very pleased with the appearance of the walkway and the practical aspect it brought to the scenario, as well as hiding the view of the underside of the locker room.


P1050252.jpg 
P1050256.jpg 

A finishing touch was the addition of Frank Simpson, leaning on the handrails of the box as he watches the world go by, care of the Modelu range of figures and painted up in appropriate signalman working gear.  More about him later.


P1050258.jpg 

Reply 0 0
WarleyMRC
looks good, coming along nicely 
Reply 0 0
Robin Sundt Echini
Frank Simpson would no doubt be proud of you!
Reply 0 0
Bunkerbarge
Echini wrote:
Frank Simpson would no doubt be proud of you!


I'd like to think so, I used my Grandad's name and, while he never worked on the railways, he was certainly around in 1948.
Reply 0 0
Bunkerbarge

The next step was taken with quite a large degree of trepidation and I couldn't help but think of the advice regularly given to parachutists picking themselves up off the ground, namely "Why jump out of a perfectly serviceable aircraft to suspend yourself from a flimsy area of nylon held together with string?"  In my case it was why go to all that trouble of building a point rodding system that operates from the hidden motors and reliably and smoothly operates three points then go and cover the whole lot with enamel paint!!

Did I mention I approached with trepidation? 

First job was to get some paint onto the track.  This serves two main purposes, the first being to paint the sleepers with a more appropriate colour than the brown shiny plastic finish they are supplied in and the second is to provide a base colour to the sides of the rails and the chairs before further detailed painting is done.  The weapon of choice here is a rattle can of Railmatch "Sleeper Grime" so using a rattle can dictates a good masking job is completed first.  The area was masked off with newspapers and Frog Tape, leaving the track area only up to the edges of the sleepers, or even further away if appropriate.  My main concern was to ensure that the rodding installation was covered and so were not going to get any paint on them. 

P1050262.jpg 
Most of this paint will eventually be covered over again with either ballast or other ground cover material so it is really just the track I was concentrating on.  I accepted the fact that the rods that traversed the tracks would get painted but they had plenty of clearance and so a coat of enamel here should not present a challenge.  Once the area was suitably masked and the rattle can "rattled" for a nice long time a test shot on some paper proved it was looking good so the area of track was given a couple of very light coats of paint.

P1050263.jpg 

After that had been left to fully harden overnight the masking tape was removed to reveal a completely different looking track.  Next job test the points to prove that everything still worked correctly, which they did, repeatedly, so a sigh of relief there.

The next step in the process was to paint the rodding installation itself and this was where the concerns really lay.  I knew there were metal blacking options, having done this on model steam engines in the past, however all the pictures I could find of point rodding installations seemed to indicate that the parts were of a grey colour.  I wanted to emulate this.  I hadn't thought of the felt tip pen possibility however I suspect getting hold of a grey one might not be quite so straightforward and I always knew at the back of my mind that they were going to have to be painted so I had already put a lot of thought into it.  I had decided that the best way to apply some paint while trying to ensure the best coverage with the minimum thickness of paint was to use acrylic paint in an airbrush. 

The next task then was another masking job, this time on the track itself to protect the already applied sleeper grime from the grey.  At the end of the day I knew that the traversing rods and the facing locks would have to be finished by hand.  A bit more newspaper and frog Tape later and I was ready to have a go at the painting of the rod installation.

P1050265.jpg 

Although the main airbrushing compressor I use is in another building I had a portable Iwata Neo compressor  for working around the layout so I connected this up to an Iwata Revolution CR Airbrush and had an initial play around with some card.  I ended up quite happy with a mix of Vallejo light grey from a dropper bottle and Tamiya acrylic thinners in a ration of 2 to 1, thinners to paint. This was then applied in very light coats, trying to avoid as much as possible the 'working' surfaces of the cranks and where the rods pass through the stools until I was happy with the coverage.  I did not need complete opacity as I knew that washes, pigments and some dry brushing were still to come so it was only really a light base coat.  I hoped that the light application of the thin paint would not interfere with the operation.  At this point I was concerned that, if I was to try to operate the points any paint on a working surface might be spread around and interfere with the clearances so the air brush was cleaned up and everything left for 24 hours for the paint to completely cure.

P1050266.jpg 

The next day the masking was removed from the track, the layout powered up and the points operated.  Everything still worked perfectly.  Now the more detailed paint work can be started in the knowledge that I have the grey rods that I wanted, all operating reliably from the hidden Cobalt SS motors.  Time for a break.


P1050270.jpg 

Reply 0 0
AHJAY
Nice progress.

Yes, most rodding was galvanised initially. Weather+ the usual mucky deposits from passing trains + oiling around cranks and stools of course encouraged muck to gather. As always, the prototype phots tell the story best.

regards, Ahjay
Reply 0 0
Bunkerbarge
I was thinking as much and aiming for a galvanised look.  The mucky bits come next!
Reply 0 0
WarleyMRC
Looks very good, it's giving us lots of help with our own project, we have just started laying the track so fully appreciate your pictures and advice you are giving. Thanks
Reply 0 0
Bunkerbarge

I think we all reach a point in a project where a certain degree of tedium enters into the proceedings and Scopwick has proven to be no exception at this stage.  The painting of the rodding installation was completed by hand painting the facing locks and the rods where they crossed the tracks with the same paint as had been airbrushed onto the rest of the installation.  I also then applied a thinned down 'Track Wash' to the entire installation, carefully not applying too much paint around the operating parts to tone down the finish ready to receive dry brushing and further weathering when the ballast is all completed.

  The next job was to paint the sides of the rails and, after much trial and experimentation I decided to use a Woodland Scenic's Paint Pen.  The one I went for was the Tidy Track Track Painter in 'Rusty Rail'.  While this proved to be a fairly straightforward means of painting a long item such as the sides of the rails it was not without its challenges, the most obvious one being the cost of the pen!  The first operational challenge, discovered on my test pieces was that the paint pen needed to be held at exactly the correct angle to the track.  Too high and it could miss painting below the bull head, leaving a fine line of unpainted rail and too low and you run the risk of getting paint on the sleepers.  Get it just right however and it does produce a neat finish with the lower edge of the tip catching the chairs perfectly and added a rust colour to those as well.  The other main downside I noticed was that the tips degraded very quickly and started to fray.  Hardly surprising when you were wiping it backwards and forwards across the chairs, effectively rubbing the end of the tip away.  The manufacturers are obviously well aware of this as they have the foresight to supply a spare tip with each pen.  The only thing we need to do then is not only put the spare tip in a safe place ready for when the first one becomes so tatty as it smears paint on the sleepers but also to remember where that safe place is.  I have absolutely no idea which safe place I put the spare tips, despite having the workshop upside down so I have purchased a packet of additional ones, which I hope, when I receive them, will fit the pens.

Next job was the tedious process mentioned at the beginning of this post and that is the ballasting.  I have spent many hours experimenting with ballasting on test pieces and cannot say even now if I am completely happy with the process I have decided on.  Having started however I am not going to change it but I do think I will be happier when I get a section completed and suitable additional weathering added.  As I am aiming at 1948 I had decided that the main lines would be fairly light in colour with limited staining along the centre line with a slightly darker cess area.  While pre-war the track would have been very well maintained reference pictures tend to indicate that track, along with everything else, suffered from a lack of care and maintenance during the war and up to nationalisation in 1948.  I decided then that the ballast would still be fairly light in colour but starting to show signs of overgrowth away from the permanent way.  I have also noticed that a lot of ballast sold as OO gauge actually measures up as way over scale so I settled eventually on a mixture of Woodland Scenics Fine Ballast Grey Blend mixed 2 to 1 with Legacy Models Legacy Ballast in 4 mm scale Light Grey Blend.  While this actually measures up as much closer to a correct scale size, strangely enough it looks too fine on the layout.  I think we might have become conditioned to accepting too large a ballast grade over the years!  I will then do the cess with Legacy Ballast Brownish Blend.

Laying the ballast is where the process becomes a bit tedious.  I will revert to the spraying water over it all and dropping glue onto it when I am away from the collection of points and rodding but around that area I need to be a bit more cautious.  Consequently the process is to lay down some masking tape to the edge of the ballast shoulder, paint watered down PVA onto the shoulder and between the sleepers, remove the masking tape and spoon ballast onto the glue.  The next day the loose ballast is vacuumed up and I can move along.  I can't go for much more than around six inches at a time as the glue starts to dry out at the beginning so I select bits and pieces around the area and progress in each different direction every day.  When the points area is all completed on the shoulder I can then turn attentions to between the rails but for now there is plenty to do on the outside of the rails. 



P1050283.jpg 


P1050284.jpg 


P1050285.jpg 


P1050286.jpg 


P1050287.jpg 

Reply 0 0
Robin Sundt Echini
Hi Bunkerbarge,
Looking good. I agree that ballasting is fiddly. I tend to lay the ballast across the track and then "tamp" it with my finger until the ballast is almost level with the sleeper tops. As I laid the track on cork underlay, I laid an extra strip of cork in the six-foot and covered that with ballast as well. Any ballast that flows off the edges can be brushed back towards the sleeper ends so that you get a nice sloping edge, just like the one in your last picture. I gently wet the ballast with a spray and then flood it with a fairly thick mixture of glue, so that it flows into the ballast but doesn't tend to flow off the edges too much. After it has thoroughly dried, any excess ballast can easily be removed with a fingernail run along the track. That way, I did the whole mainline run, edges, track and six-foot, in a single sitting.
Love the rusty track sides!
Regards
Echini
Reply 0 0
Bunkerbarge
Echini,

I will use the spray and squirt process when I get away from the points.  In the points area though the tendency of the glue to flow by capillary action into every nook and cranny seems a bit too risky to me and I might end up with sticky points or seized up rodding.  Consequently the whole point area is going to be done a lot more manually and specifically.  That makes it a lot slower!  Still I'm doing a bit more each day and things are moving on.
Reply 0 0