Bunkerbarge

My initial thoughts on point rodding and what was installed on the first few points on the layout used square section 0.8mm brass rod in straight runs to the operating arm.  Originally the Cobalt SS motors were to be hidden by lineside huts and other bits and pieces and the illusion would be enhanced by the use of Ratio plastic points rodding kits laid up to the brass rod.  Challenges were experienced with the installation in such ways as bending the rods to a fine profile and it looked a bit over scale but, from what was available at the time, I was happy that it could be made to look relatively realistic.  

2063_082011_030000000.jpg 

Since the installation of the first few points I have occasionally experienced a challenge with a point not moving, which I have put down to interference, probably at the ends of the rods, which may just protrude a touch too much and were going to be filed down slightly.  I also realised that there was a danger of a short occurring between the rails so a piece of plasticard was inserted and glued below the rail to insulate it.


2063_082011_440000000 (1).jpg 

As mentioned the intention with my 0.8 mm brass rods was to supplement them with Ratio rodding to enhance the look of the installation however as this was all being tried tested and considered DCCconcepts decided to throw a spanner into the works by releasing their own operational points rodding system.  Luckily I didn't have too many points installed at this time so I had to decide on whether I wanted to change direction and go with the new system.  As it had the potential to be far more scale looking than the system I had trialled I had to at least give it a go.  I decided a suitable starting location to trial the system was at a place on the layout where a crossover and a siding point at all operated from and could realistically be controlled from a signal box.  I really wanted to have a go at this so I bit the bullet and purchased the point rodding starter set from DCCconcepts and, as my scenic progression was almost at the point where three points are located on the upper level, I decided to have a go at installing them.  I would normally advocate trying something simple and straightforward for a first time however, as two of the points in question are in a crossover and all three are operated from the same control unit I thought the three would make a good convenient starting project and an opportunity to really see what the strengths and weaknesses of the new rodding system are.  I basically thought that if I can sort out these three then everything else after that should be that bit more straightforward.

The rodding is also required to go underneath an adjacent track, for which DCCconcepts recommend using their own system of wire inserted into a flexible plastic tube embedded into their foam underlay.  I haven't used their underlay, plus I wanted the installation to look as scale as possible so I really wanted the rods to go under the track in much the same way as real rodding is routed.  I also wanted the operating rods to emerge from the signal box, which would therefore have to hide the motors so I was stacking up the challenges even before I started.

When the starter set arrived I gave it a good once over and studied the contents of the packet.  The thing that struck me more than anything was how fine the rods were.  I measured them up and they came to 0.4mm square section rod, half the size of my original rods.  It was obvious that they would need the supplied stools for support to prevent flexing and I had to consider the fact that a rod going below the track might require support in the ballast, which would be a shame as I wanted the rod at this point to look as prototypical as possible.  I quickly came to realise that a lot of this installation was going to be of a trial and error nature and that there was possibly going to be a lot of deviation from suggested practises.

The first job was to remove the original brass rods and Cobalt SS motors from the three points and take a deep breath before embarking on what I anticipated as being quite a bit of work and probably quite a steep learning curve.

Reply 3 0
Robin Sundt Echini
You are quite right, I use this method for all the non-moving bits! But it is only the centre part of the points that move and those have to be done individually to prevent glue getting where it shouldn't. Normally there are only about a dozen sleepers on each point that have to be done separately.
Reply 0 0
AHJAY
I too use the sleeper-by-sleeper approach close to moving parts, but as insurance I generally warm up a little vaseline to make it liquid and paint it around the tie bar when ballasting as well.

Its harmless stuff that is easy enough to get rid of later and does make an effective barrier to glues that migrate...

regards, Ahjay
Reply 0 0
Robin Sundt Echini
Good idea Ahjay!
Reply 0 0
Bunkerbarge

Well with the ballasting absorbing so much time the only update since the last one is the fact that ballasting has 'progressed!'  I thought I would take a couple of shots of the process that may just help someone else as they try to work out what might be the best process for themselves when they come to the same stage of construction.

Despite trying a number of slightly varying processes and many different materials on scrap boards I came to the conclusion that the process I settled on does recover a very large proportion of ballast, making it a fairly efficient way of doing it.  The main downside is the time it takes but this will improve significantly as I move away from the points area.  I progress in approximately 6-8 inch sections as any further and the glue at the beginning of the stretch is getting a bit too dry and needs redoing.  So the first job is to lay down a length of frog tape along the line of the edge of the underlay.

P1050288.jpg 

When that is in place the 50-50 PVA is painted onto the underlay on the edge only, pushing the brush in between the sleepers.  I use a small flat brush as this allows me to use the edge to push in between the sleepers and the flat to give a wider spread over the rest of the underlay.  I try to keep the glue wet but not too much against the edge of the tape.  If I get some glue on the top of the sleeper I usually give it a quick wipe with my finger to minimise it.  I don't mind a bit of ballast on the tops of the sleepers but not excessively.


P1050289.jpg 

When the glue is all painted on I pull the tape up and put it on one side. 

P1050290.jpg 

Then I spoon the ballast material over the glue with a teaspoon until the glue is completely covered and gently tamp it down with my fingers. 

P1050291.jpg 

I will try to do three or four sections like this before finishing and cleaning up.  The glue is left overnight to completely harden before I touch anything.  Next job is to simply vacuum up the loose ballast into a battery vacuum cleaner, which has been cleaned out thoroughly and dried out for the job and which obviously is not used for anything else during this time. 

P1050292.jpg 

The ballast can then be recovered from the vacuum cleaner by simply emptying into a baking tray and pouring back into the glass ramekin for further use.  I will try to do a single colour of ballast in an area before moving onto a different colour to make segregation of the ballast that bit easier.  I will use a brown for the cess area and a very dark blend for the yard areas.  If I have blended ballast types and colours I make a note of the recipe so I can repeat it in the future.  When I have done all the outsides of the track in this area I will move onto the centre sections.

Reply 0 0
WarleyMRC
Is that a fine ballast blend, looks almost like n gauge. It looks very neat, worth taking your time to get it right. What make of ballast is it?
Reply 0 0
Bunkerbarge
If you read through my previous post on ballasting on the previous page you will see the recipe for the  blend I am using.  Interestingly if you actually measure up the ballast grains from many suppliers sold as OO gauge it works out quite frequently as well oversized!  Correctly scaled down ballast chippings is actually quite a bit smaller than most suppliers seem to sell.  See my comments in the same post.  I was actually worried initially that it looks too fine, as you say, but the more I compare it with real photographs the happier I am with it.

The first picture is some of my experimental processes, I settled on the grain size I used in the track centre, rather than the oversized grain that I used on the shoulder.

20-10-17-15FensideRailwayTrackSample3.jpg 
8183609490_897201869b_o.jpg 

40339972781_83689ab3b4_o.jpg 
Reply 1 0
Bunkerbarge

So while the ballasting progressed, and more of the process later, I still have to progress the scenery in the area as well.  I wanted to add a bit of interest to the right hand side of the signal box so the first job was to put a small domestic coal staithe against the wall for the signalmen to store their stove coal in and beyond that I had a bit of a think.  I did purchase a nice little laser cut wood kit of a greenhouse but, when I received it and thought more about it I wasn't so sure.  I'm not a great fan of 'cliches' when used in scenarios and felt that the greenhouse had been done before.  I'm still not sure whether a vegetable patch might be an option for the same reasons!  Then along came the free Ratio Grounded Van in Railway Modeller so I turned my thoughts to that. 

The trouble would be with something so readily available that they would suddenly appear everywhere so the trick was to personalise it in some sort of noticeable and imaginative way.  The first job was to simply glue the 'box' together and then apply some thought to it.  It went together easily and did display a commendable level of surface detail so it had possibilities.  I also added a strip of Evergreen to the lower edge to simulate a sole bar and fill in the gap.  How to make it just a little bit more individual though.   

P1050293.jpg    


A search around the internet didn't really generate any inspiration but I know of a grounded van sat in a field not that far from here and along a footpath where we regularly walk our dogs.  I went along for a look.   The trouble with that one was, as I suspect is the case with a very high percentage of these nowadays, that they are in such poor condition as to be falling apart and unsafe.  What I did notice however was the fact that the canvas on the roof was almost completely gone and the rotten roof planking  was all but disappeared.  What it did suggest though was the fact that the canvas covering is rarely seen  in such a poor condition as to allow the planking below to show through so maybe there was a possibility there.

I had a play around at home and came to the conclusion that I could easily model the grounded van with a damaged canvas roof covering with the planking showing through.  First job then was to cut out a small section of the plastic roof and replace it with some spare wooden deck planking from my model boat wood pile.  The wood was thinned by sanding and then teased into a curved shape to match the curvature of the roof.  The planking was cut to match the removed section and simply glued in place with some cyanoacrylate.  The entire roof was then sanded down to remove the joint and provide a smooth surface.


P1050295.jpg 

The next job was to cover the roof with some canvas and for this I have used in the past a particularly tenacious packing tape that has a well defined textured surface and a nice matt finish to hold paint.  I cut out a piece to cover the entire roof, folded it over the edges and pressed it firmly in place before trimming it away with a sharp scalpel.  Finally I tore the 'canvas' away from the planked area and pulled it back into a fold.  The tape was secured in place with a spot of cyanoacrylate glue.

P1050296.jpg 

Pleased with the potential I then did a relatively simple paint job on it.  The van sides first received a covering of a thinned down brown enamel and the canvas was painted in a very thinned down light grey.  I particularly wanted the natural brown of the tape to show thorough the paint in patches. 

P1050305.jpg 

P1050306.jpg 

After a few days for this to harden the sides then received a watered down coat of 'track wash', which was mostly removed with a damp brush to leave it in the shadows only. 

P1050311.jpg 

The centres of the panels then received a dry brushing of the same track wash mixed with a light grey and the metal work was given a dry brushing of first gunmetal followed by a dark rust and finally a light rust, taking care to not get any of these paints on the woodwork. 

P1050312.jpg 

P1050313.jpg 

The canvas roof was also given a coat of the thinned down track wash before a dry brushing with some light grey and the bare wooden planks were given a very thinned down coat of a dark wash before a dry brushing with some track wash and light grey mixed.  I might add a couple of buffers and hooks to the buffer bars but I'm not sure yet until I decide where exactly it will sit and what will surround it.

P1050315.jpg 

With that done it was time to progress the ballasting again.

Reply 3 0
Mister Rusty
Wow, that would stand alone as an article on weathering, maybe we should start another competition with who did what to this free gift.
I personally would not fit buffers or hook as I would anticipate [having known many farmers] that they would have weighed them in for scrap, if they had not been removed as spares in BR days.
Just an opinion based on not having seen any on a scrap or de-mounted body over the years.😄 No, l do not need photographic proof that l am wrong 😄.
In any case were not the buffer beams part of the transverse end of the chassis, upon which the body and floor were bolted or riveted? This would make sense to impart shock through the chassis and not the body when in use.
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 0 0
Robin Sundt Echini
Love the weathering, particularly the damaged canvas roof. Great job!
Reply 0 0
Bunkerbarge
Wow, that would stand alone as an article on weathering, maybe we should start another competition with who did what to this free gift.
I personally would not fit buffers or hook as I would anticipate [having known many farmers] that they would have weighed them in for scrap, if they had not been removed as spares in BR days.
Just an opinion based on not having seen any on a scrap or de-mounted body over the years.😄 No, l do not need photographic proof that l am wrong 😄.
In any case were not the buffer beams part of the transverse end of the chassis, upon which the body and floor were bolted or riveted? This would make sense to impart shock through the chassis and not the body when in use.


Thanks for the comment.  I hadn't thought of the scrap or recycling aspects so I think you are right.  I also suspect that whatever railway company owned it originally would remove such items long before letting it go.  Saves me a job!!
Reply 1 0
WarleyMRC
The box van looks great, we like the way you have weathered the roof and the peeling felt excellent job
Reply 0 0
Mister Rusty
Izal quality paper has 2 different textures, one is good for felt, the other for rough render on walls. Use PVA to make it adhere. Cheap children's tracing paper gives similar effects.
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 0 0
Bunkerbarge
The challenge is getting PVA to adhere to polystyrene, especially if it is significantly watered down.  In the case of the grounded van it might then be an idea to replace the entire roof with wood and make a few more damaged areas in it.  Can you still buy Izal?  Haven't seen the stuff for years.  I'm sure it is far more useful as a modelling medium than what it was intended for!
Reply 0 0
Mister Rusty
:-D GOTCHA :-D 
Wondered who would admit to remembering Izal
;-) 
Agree with your comment about it though.
At least it was finger-proof
:-SS 
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 0 0
Bunkerbarge

Apart from a little diversion to build the grounded van most of recent efforts have been put into the ballasting.  Unless, of course, you also include the rushed completion of a competition racing RC model boat that has to be completed, tested and ready to race for this season which now starts three weeks today!

So in between building the boat and the grounded van experiments with ballasting have continued.  I was fairly happy with the process of doing the shoulders and the 50-50 PVA mix applied with just the right size of flat brush seemed to do the trick.  Between the rails however has taken a bit more thought and experimentation.  First of all this is no more than a method that I have settled on that works for me.  I think of all the processes we decide to use ballasting is just about one of the most individual and we all tend to go for a process that we are personally happy with.  I offer this only as my own preferred method that works for me and fully accept that this might not be the right process for anyone else.

After a lot of playing and vacuuming up the ballast on a frequent basis on the test pieces I eventually decided that the best way to apply it was to simply spoon it along the track in approximately the correct amount.  Going a little under in quantity was easier to deal with than slightly over and so, after a while, I got to the point of having a fair idea of how much I needed to apply. 

P1050297.jpg 

I topped up as needed and used a tamiya paint stirrer to place the grains in the points. 

P1050299.jpg 

After the ballast was spooned along a section the next part of the process was to tease it into the spaces with a small flat brush.  If you have applied too much you will find that you are chasing the excess along the track for the next ten minutes so hopefully there is not too much excess. 

P1050302.jpg 

P1050325.jpg 

Once the ballast has been spread into the gaps between the sleepers the next job is to go along the rails and tap them with the curved bottom of the spoon.  This works exceptionally well to settle the ballast as well as it help to clear any that might be sitting on top of the sleepers.  Any stubborn bits that remain can be pushed off with fingers or the brush to leave the tops of the sleepers fairly well clear.

P1050327.jpg 

The next step was the most troublesome.  I have tried to use the washing up liquid method but really not been happy with it.  Washing up liquid does work but it takes too long so when you place a drop of the water onto the ballast it still insists on forming a blob before it decides to soak into the ballast.  While this blob is formed it inevitably lifts up some ballast particles and deposits them on top of the sleepers or on the insides of the rails.  After all the care and attention that was put into settling the dry ballast this was particularly frustrating.  Spraying it on proved equally frustrating with wetting agent either all over the place or blowing the ballast out of place. What I needed was a wetting agent that had a significantly lower surface tension than water and hence would immediately soak into and wet the ballast without disturbing it.  I am now aware that DCCconcepts recommend alcohol, which I am sure will be an extremely effective wetting agent however I didn't have any to hand but I did think of trying turps.  I placed a drop from a pipette onto the ballast and it instantly soaked in, immediately wetting the ballast without disturbing a grain.  The next part of the test was to see if the 50-50 PVA would then be miscible with the turps. I placed a couple of drops of the PVA again from a pipette onto the wetted ballast and it immediately soaked into the ballast beautifully.  It didn't disturb the ballast grains and what parts looked initially dry soon soaked up the turps and the PVA to form a very nice neat bed of grains.  The final test was then to see if there was any reaction with the turps and the PVA when it dried so it was time to leave it overnight.

The next day the ballast on the test track was checked and I found it to be very firm and secure, all completely in place and nice and dry.  There are many tutorials and advocates of spraying water all over the ballast prior to applying the glue but I simply found that this lacked the control I want.  I fully accept that placing drops of any wetting agent followed by drops of PVA is a significantly slower process than spraying and squirting but I am happy for this process to take longer but I remain in control and I'm not spraying a wetting agent all over everything.

P1050303.jpg 

To date the shoulders are not too far away from being completed in the area of the final scene and now I can crack on with getting the centres done as well.  I want to finish all of this colour of ballast before I move on to doing other colours as I only have one available vacuum cleaner and I don't want to be frequently changing colours in it!  When the light ballast has all been completed I will move onto the cess areas and complete all those in one process.

Reply 3 0
Reply