Bunkerbarge
My apologies to all who have already seen this layout on other forums but, as we are just starting up and as we are looking at getting some archive material together I thought I might post it on here as well.  Apart from which I am using DCCconcepts equipment so there is a whole new area of interest here, when we get to that point!

I thought I might start off with a couple of pictures of the base board, built now around a year ago.  The base is Wickes Kitchen units on one wall with cut down MDF book shelves on the opposite wall with cheap B&Q doors on top of them.  This means the underside of the base is not available however I intend having almost all of the layout at higher levels above the base.  The original intention was for the outside mainline ring to be at 100 mm above the base, a lot of the next level down to be at 50 mm and there was then going to be low lying areas at 25 mm.  This however all changed!  A few bits and pieces such as a canal basin would be on the base board itself.  This meant that points motors and wiring was not going to be immediately accessible after the layout was been completed although it was anticipated there should be little damage needed to get to anything.

The west wall needed completing with the six inch wide shelf that was to hold the outer main lines but that will be done when the rest of the shelf is fitted.  This was to give a complete ring, needed for what was going to be the live steam line.  This has also since been changed!


2063_261513_470000000.jpg  2063_261515_550000000.jpg  2063_261516_140000000.jpg  2063_261516_290000000.jpg  2063_261516_470000000.jpg  2063_261517_030000000.jpg  2063_261517_190000000.jpg   

Reply 4 0
Bunkerbarge

After taking the decision to cheat and purchasing some lengths of pre-cut wood, when it arrived I could progress.  I had decided to go for the back 'shelf' as being 100 mm high but the more I thought about it and the more I read about it the more I was unsure of the idea.  While 100 mm would give me a lot more scenic options in the future as regards bridges and tunnels etc. my big concern, and the one which I read more warnings about than anything else, was the challenges with gradients, in particular when using full length main line traffic.  Consequently I decided against 100 mm and while 75 mm would be a good compromise 50 mm allowed me to cut my wood stock in half and double the quantity of bearers.  I could then use the whole 17 foot length of the layout to arrange the transition lines between the main line and the branch lines.  One would be on one side of the layout and the other would be on the opposite side.

Consequently I cut the wood in half and started to build the upper level 'shelf'.  The first piece was going to be a simple arrangement of a solid corner so the ply was marked out and cut and bearers prepared to support it.  The ply is only 3 mm thick, to allow easier cutting and shaping, so it will need good support to prevent any flexing so, despite a lot of scenic material on top that will solidify the structure, the bearers were placed quite close together for now.  The bearers are simply attached to the base with a bead of 'No More Nails' and the ply will be stuck on top in a similar way.  The holes in the bearers are for what was going to be the cable for the steam circuit 'Bus' and will allow the whole bus to be installed and made operational before moving on to the installation of the lower levels.  This idea has since been scrapped.



2063_151329_490000000.jpg  2063_151343_250000000.jpg  2063_151344_020000000.jpg 


Reply 1 0
Bunkerbarge
After a bit more playing around and a bit more pondering the shape of the first corner changed to give me an even larger radius for the main line and so the bearers were extended.  I also increased the width of the shelf to allow for two main lines side by side and around six inches behind it for a backscene and its transition.  The very regular lines will be broken up in the future when scenery is added to the layout as well as increases in terrain levels above the base and the shelf level.  In front of the 50 mm level will be an area of 25 mm high which will provide a suitable foundation for the more intricate levels to be added with easier to work scenic materials.  At this point the main aim was an operational ring of two main lines and a period of proving before progressing to the lower levels.

2063_251706_490000000.jpg 

After the bearers were progressed along two of the main walls I decided to have a go at installing a part of the steam line ring bus.  This worked better than I had anticipated and it allowed me to fix the first piece of ply in position.  The ply is simply held down with beads of "No More Nails" on the top surface of the bearers and a good weight to keep it all in place until it had set.

2063_251713_170000000.jpg 

The bus was then pulled through to the point whereby the bearers need continuing and allowed me to get a feel for feeding it through the holes in the bearers. I also decided to fit some new lights to the ceiling to do away with the grim old flourescent tubes so they were replaced by some new low power LED units to give much better lighting.

2063_251716_360000000.jpg 

Next job was to work out how to create the transition in the corner to the narrow shelf across the wall adjacent to the staircase.  I want to put a great deal of care into the construction of this part to ensure perfectly smooth trouble free running as a derailment across this stretch will end up with rolling stock flying down the staircase.  I think a suitable retaining wall and a perfect straight run should ensure no such problems.

2063_251720_310000000.jpg 
Reply 1 0
Bunkerbarge
So now cable removed, stretched across the garden, twisted with a battery drill and re-threaded into the beginnings of the layout.

That was the first bus loop installed.
2063_272117_250000000.jpg 
Reply 0 0
Bunkerbarge
Not a huge amount of progress to this point but a significant step in the build.  The gap across the staircase was now completed with a shelf, which was to eventually hold the live steam line on the outside and the DCC mainline on the inside.  Care was taken to ensure that anything untoward happening on this section should not result in a loco and its carriages flying down the stairs so probably a stone wall and a fence will eventually be fitted to protect against this.  The upper level is now almost complete along three walls so not too much to do now to complete this level.  If you are wondering the wooden brace was temporarily holding a bracket in place while the glue sets!

2063_041343_540000000.jpg 

2063_041345_060000000.jpg 
Reply 0 0
Bunkerbarge
Finally in around October '17 I managed to complete the loop and then had a higher level all the way around the layout.  The Live Steam line power bus was in place and I had started to assemble the control bits and pieces at the control board.  The DCC controller is not in place as of this point but I had been using it to test run a loco on a simple piece of test track.  I very much like the Sig-na Trak ACE DCS 2044 control unit and found it easy to use while maintaining a high degree of accessibility and flexibility.  I particularly like the seperate hand held units and while I am only likely to be using one at a time you can plug in four and have four locos individually controlled.

I also assembled at this time a test piece to try to determine the best process for laying track and ballasting it.  I had decided to go for Peco code 100 flexible, mounted on 3mm cork, both held in place with neat PVA and track pins.  The ballast was a trial of two different types and a number of different glues and strengths.  I decided on using the ballast in the centre of the lower track, which was Woodland Scenics, as it looked the best to scale and it was the easiest to get in place.  I wanted to sort out a reliable and consistent technique that could be applied to the entire track to ensure the most consistent and reliable track is achieved, which I think at that time, I was happy with.

2063_201654_560000000.jpg 
2063_201655_140000000.jpg 
2063_201655_380000000.jpg 
2063_201655_590000000.jpg 

2063_201656_210000000.jpg 
Reply 0 0
Bunkerbarge
With the higher level completed and a test loop run for a week or two it was then time to take it apart again and start work on the track laying.  First job was to glue the cork underlay down.  I have gone for 3mm cork by Gaugemaster as it is relatively straightforward to lay and being pre-cut in half makes following curves quite easy.  I marked out the track by centre line then laid the first half of the cork up to the centre line from behind.  When that had cured it was relatively easy to lay the second half of the cork up to the edge of the first piece.  I offset the two halves to stagger the joints.  With a handfull of old gel batteries to hand to hold the cork in place while it set sufficiently progress wasn't too bad.  The intention was to get the two higher level circuits fully operational before going any further as lower levels will cover the cabling so I want to be sure all soldered joints are robust, secure and most of all reliable before covering them.  

The two inner curves at this end of the room were to be 600 mm radius on the inner track, intended only for freight and suburban traffic and the two outer curves were designed to be 670 mm radius, which will be for the main line trains.

2063_072149_370000000.jpg 

2063_072149_560000000.jpg 
2063_072150_110000000.jpg 

2063_072150_490000000.jpg 

2063_072151_030000000.jpg 
Reply 1 0
Bunkerbarge
With the progress of the cork laying being fairly laborious it soon became apparent that an alternative task was required to fill in the regular gaps while the cork cured.  Consequently it was time to turn attentions to the track laying.
First up was the decision of what track to use.  It had to be flexible at least for the live steam ring as a dropper was going to be connected to every single piece of track so minimising the number of pieces was an important consideration.  I figured the same may as well apply to the DCC ring and layout to ensure the highest levels of reliability.  Eventually I decided on Peco code 100 Flexitrack and Peco code 100 Electrofrog points.  I went for Electrofrog for reliability and looks, without limiting myself in the future with potential rolling stock with code 75 track.

Having decided on the track next up was to decide how to operate the points.  As I have mentioned almost all my wiring and electronics was going to be above the board so surface mounted points motors was also necessary.  All the reading and research eventually led me to DCCConcepts Cobalt SS points motors and the two below board motors on the staircase crossing could be DCCConcepts ip Digital motors with their neatly built in decoders.  Consequently I put together a starter order with DCCConcepts for a pack of six Cobalt SS Points motors with decoders and accessories, a crossover pack for the two crossovers, two of the six pack would be used for the other crossover, and a couple of below board Cobalt iP digital motors.  When the order arrived it was time for a play and a look at all the goodies.


2063_182221_300000000.jpg 
Reply 0 0
Bunkerbarge
When I opened up the six pack of Cobalt SS motors I was very surprised to find such a comprehensive set of accessories.  There was a two way and a three way splitter included as well as an extension cable giving quite a bit of flexibility.  There was also a bag of various link wires for mounting either on ballast or on the base board and plenty of screws to put them all together.  The decoders are supplied in pairs on a single board and are a substantial size but they do fit comfortably underneath a Bachmann barn so will be arranged around the layout with buildings simply dropped over them.

2063_182224_230000000.jpg 


2063_182224_450000000.jpg 
Reply 0 0
Bunkerbarge
When the DCCconcepts order arrived I could not resist having a play, which eventually developed into fitting one of the Cobalt iP Digital motors to the first piece of track to be laid, namely a point.

First up was to mark out the base where the point was going to be fitted so I could then drill the two holes for the droppers and the larger hole for the tie bar actuator.  

2063_182226_050000000.jpg 



The two link wires were removed from the points blades to isolate the frog and two droppers were soldered to the outer rails, with links being incorporated to jump to the inner rails.  



2063_182227_070000000.jpg 

2063_182227_360000000.jpg 


The centering spring was also removed so avoid the motor having to work against it. I didn't want to rely on contact with the outer rails as they were going to be painted so a direct feed would be far more reliable.  

The Cobalt iP motor was mounted onto a wooden plinth rather than directly to the 3mm ply base to give the screws something to hold on to plus giving complete flexibility when finally permanently mounting the motor.  The plinth will be simply glued in place below the base board.

2063_182230_430000000.jpg 


With the droppers soldered onto the base of the rail a test fit showed the point sat where I wanted it with the tie bar right in the centre of the large hole and the operating arm clear all around.

2063_182231_310000000.jpg 

Consequently the point was glued and tacked into position.  With my first piece of track actually permanently fixed in place I really couldn't help myself as I wanted to see how a length of track was going to look.  Consequently I marked out the next piece and soldered two droppers to a piece of flexitrack.  The chairs were cut back and fishplates were fitted and the piece of flexitrack was also fitted and glued down.  I wanted to see how the droppers looked and was pleased to see that they are neatly tucked away below the rail.  I thought at the time of experimenting with soldering the droppers with the bend in line with the rail but after some experimenting with seeing how ballast would cover the ends of the droppers I was happy with the arrangement I had gone with.

2063_182235_060000000.jpg 
2063_182235_240000000.jpg 
Reply 0 0
Bunkerbarge
As the underlay slowly progressed it was time to turn my attention again to the track and, first of all, decide on the processes I wanted to adopt to lay it.

Initial playing around with it soon identified the challenges of trying to get it to remain in shape so soldering droppers to curves and marking out the base for drilling became quite a challenge.  I also noted that laying straight lengths was far from easy as the Peco flexi-track is exactly what it says on the tin, namely very flexible!  I found that glueing the straight lengths worked better and nailing the curves made life a bit easier there.  Everything would become consolidated at the end when the ballasting was glued in place so I made a decision to glue the straight lengths while using a straight edge to ensure the piece remained true but to nail the curves, while following the join in the underlay.  

I also realised from a lot of reading and watching far too many YouTube clips that there are as many methods of laying track as there are people doing it so I would still need to make my own mind up as to the process and I think everyone has thier own little pet preferences that are important to them.  As an example I really want the droppers to be invisible so they have to be soldered to the base of the rail.  This means they must be soldered before fitting, thereby making the soldering and fitting significantly more tricky.  I notice many solder the droppers in place but the ends can never be really hidden then so that is just my own little thing.  A point I did take on board was to stagger the rail joints on the curves.  This again makes things much more tricky but the curve is definately much smoother.  I decided not to bother on the straights as they didn't really need it and it saves at least that job.

Consequently I ended up with the following process that I am reasonably happy with.  It may be modified as I go along but the most important part for me at the moment is to establish the procedure, which I can become familiar with and then follow, which will hopefully prevent me from making so many mistakes.  Pitfalls I have fallen into so far are as follows: 

1) I forgot to put an insulating fishplate on the track joint at the frog rail of the point.  I had to remove the metal fishplate, cut a gap with a Dremel, insert a cut down insulating fishplate and seal the joint with epoxy.  Luckily I was able to do this with the track in place.
2) I hadn't realised how critical it would be to get the dropper wires in exactly the right place for the drilled holes.  I could use a larger drill but for my first attempt I soldered the tabs of the dropper the opposite way around and it put a significant 'S' bend in the track.
3) I forgot to file the track before soldering.
4) I mixed up the red and the black cables on one piece.
5) Drilled the baseboard between the wrong pair of sleepers!

Etc...etc...  All a learning curve.
Reply 0 0
Bunkerbarge
So with those learnings in place this is the process I have settled on.  This is a straight piece without staggering the joins:

1) Remove the chairs from the end sleeper on both ends of the track.

2063_012213_200000000.jpg 

2) Remove the tabs from two gaps below the track.

2063_012213_430000000.jpg 

3) File the surface of the rail to enable a better soldered joint.

2063_012214_160000000.jpg 

4) Mark the underlay at the exact point where the dropper is going to be, bearing in mind the right angle on the end of the wire.

2063_012214_390000000.jpg 

5) Drill the holes for the dropper wire in the baseboard with a clearance drill that enables a nice easy fit without being too sloppy.

2063_012215_030000000.jpg 

6) Tin the underside of the rail with a good sized blob of solder ensuring the rail is hot enough to wet the solder.

2063_012215_380000000.jpg 

7) Tin the end of the dropper wire.

2063_012216_050000000.jpg 

8) Bend the end of the dropper over at 90 degrees.

2063_012216_280000000.jpg 

9) Cut the tab on the end to suit the gap in the sleepers.

2063_012216_480000000.jpg 
Reply 0 0
Bunkerbarge
10) Place the tab on top of the tinned rail and apply the soldering iron tip again to fuse the two together.

2063_012217_460000000.jpg 

11) You should end up with nice neat droppers solderd to the base of the track.

2063_012218_090000000.jpg 

12)  Next is to fit the droppers to the holes in the baseboard and pull through just enough to leave the track upside down.

2063_012218_410000000.jpg 

13) The two fishplates are then fitted to the fixed track ends and pushed up to the first complete sleeper, ensuring that they will sit firm as the track is fitted.

2063_012219_100000000.jpg 

14) A bead of neat PVA glue is then run down both sides of the track below the rails before the track is then flipped over, the ends slid into the fishplates, the droppers pulled through the base and the track aligned with a metallic straight edge.

2063_012219_400000000.jpg 


15) Finally a straight piece of wood is placed on the track and weighed down until the glue has set.

2063_012220_090000000.jpg 

 
Not a great deal to show for the efforts so far but at least I now have a process I am happy with and the track I have down so far seems to be neat enough and I am happy with the fact that every piece has a pair of droppers soldered to it.

2063_012220_370000000.jpg 
Reply 0 0
Bunkerbarge
Moving up to December '17 now.  First of all the underlay was now finally been completed at this time around the two main tracks of the higher level with the crossovers also done as well as a line to the engine shed.  I still have to do a siding on the North side to run along the loading bays and warehouses but the main work is done for now.


2063_261740_180000000.jpg 



Next job was to fit the second points motor below the staircase 'causeway' and wire it up to the DCC bus. Armed with the knowledge gained from the first one this went in fairly quickly and, after a couple of calls to the guys at DCC Concepts to help me address the first one I was able to set this one up very easily and quickly. Its a shame I only have these two as all the remaining points motors are going to be of the Cobalt SS type.

Next job was to work out how to complete the soldering of the bus connections, which is quite tricky with pre-twisted cables.  I wanted to displace the connections to minimise the risk of any shorts being experienced so simply cut open the insulation for a few milimeters, tinned the exposed cable and soldered the end of the dropper to it.  I really wanted to avoid cutting the bus to minimise any resistance losses in it so opening it up with a wedge of wood allowed me to work on it while maintaining the access and achieving a strong joint.  

2063_261742_000000000.jpg 
2063_261742_230000000.jpg 
2063_261742_480000000.jpg 
2063_261743_090000000.jpg 


Finally I sealed the soldered joints with liquid insulation.  One thing this has taught me is to try to minimise the numbers of connections directly to the bus as the twisted cable is quite tight and opening it out for numerous connections adjacent to each other is going to be tricky.  Consequently when I move on to the Cobalt SS motors I will be looking at a single dropper connection for a control board and take the power for the points from this dropper rather than the bus.  


2063_261743_320000000.jpg 
2063_261743_500000000.jpg 
Reply 2 0
Bunkerbarge
Next job was the first play around with the Cobalt SS point motors and controllers.  I first of all rigged up a temporary test by taking power from the bus to feed into the controller and connecting two of the Cobalt SS motors.  The controllers can actually power three motors comfortably on each address however there are only two addresses available on each board.  Consequently for a crossover both point motors can be arranged to change simultaneously on the one command, which is very convenient and, of course cheaper.

2063_261759_540000000.jpg 


In the case of the first one I was playing with I wanted one address to operate the two points of a crossover and the other address to operate the point for a siding.  The test set up included the board and two motors on one address coinnected together with a 'Y' lead and an extension.  After only a little bit of playing around I soon found out how to asign the address from the DCC controller, which, once the order of play was understood, proved to be extreemly easy.

2063_261800_450000000.jpg 

The manufacturer even thinks to include a reversing connection on the 'Y' leads to give you even greater flexibility with the plug in arrangement.

2063_261801_220000000.jpg 

Next job was to decide which of the many linkages supplied with the motors to use to connect to the point.  These all give you flexibility depending on your underlay, scale etc..etc.. 

2063_261803_070000000.jpg 

 I found that the orange labelled packet worked best however I was not happy with the placing of the motor and realised it was time to decide just how I was going to mount all my motors, bearing in mind the old chestnut of balancing the operation against the scale reproduction.  All I have decided so far is the fact that I want the motors to be hiden below various assorted track side huts with the linkages arranged to at least represent realistic rodding and interlocks.

2063_261803_410000000.jpg 

2063_261803_590000000.jpg 

I am therefore going to have to decide how to extend the linkages from the motor to the point operating arm while maintaining a degree of realism.  Don't forget this is before DCCconcepts announced operational point rodding!
Reply 1 0
Reply