Bunkerbarge
My apologies to all who have already seen this layout on other forums but, as we are just starting up and as we are looking at getting some archive material together I thought I might post it on here as well.  Apart from which I am using DCCconcepts equipment so there is a whole new area of interest here, when we get to that point!

I thought I might start off with a couple of pictures of the base board, built now around a year ago.  The base is Wickes Kitchen units on one wall with cut down MDF book shelves on the opposite wall with cheap B&Q doors on top of them.  This means the underside of the base is not available however I intend having almost all of the layout at higher levels above the base.  The original intention was for the outside mainline ring to be at 100 mm above the base, a lot of the next level down to be at 50 mm and there was then going to be low lying areas at 25 mm.  This however all changed!  A few bits and pieces such as a canal basin would be on the base board itself.  This meant that points motors and wiring was not going to be immediately accessible after the layout was been completed although it was anticipated there should be little damage needed to get to anything.

The west wall needed completing with the six inch wide shelf that was to hold the outer main lines but that will be done when the rest of the shelf is fitted.  This was to give a complete ring, needed for what was going to be the live steam line.  This has also since been changed!


2063_261513_470000000.jpg  2063_261515_550000000.jpg  2063_261516_140000000.jpg  2063_261516_290000000.jpg  2063_261516_470000000.jpg  2063_261517_030000000.jpg  2063_261517_190000000.jpg   

Reply 4 0
Bunkerbarge
So just to detail a bit on what was done with the points at this time.  I still have options of changing this and I am still testing the ideas as of Sept '18.

As mentioned above firstly a loose set up was connected together using temporary dry connections to the bus.  My first use of the Cobalt SS units was going to be the crossover to the live steam circuit so there is quite a lot going on at this particular part of the layout.  Not only do I have the points operation to consider but I also have to be able to change the power supply over from the live steam transformer to the DCC controller and back again.  When the outer loop is on DCC  the points and the circuit has to operate as normal and when on live steam the points have to be completely isolated from the DCC system.  More about that part in later posts but for now the main objective was to simply get the crossover operating as a DCC set up.

After the challenge described above was addressed by using the reversing 'Y' connector and the motors proved to be operational when sat loose on the layout the next consideration was how to connect the motors to the points.  The supplied linkages are only good for having the motor very close to the edge of the track and I particularly wanted then to be hidden.  Consequently longer linkages were going to be required and, despite the Cobalt SS instruction sheet referring to available linkage extensions, DCC Concepts seemed to have no knowledge of these and repeatedly tried to tell me I was misreading the instructions as this was referring to remote operation electrically.  I'm afraid the instructions specifically refer to remote mechanical linkages.  Realising therefore I was on my own with this I started to experiment with possibilities and purchased some brass 0.8 mm square section rod and a couple of differing sizes of plastic.  The plastic turned out to be a non starter as it is way too flexible.  So I was left with brass square section rod.  I filed the ends down to a round profile before bending them into some sort of acceptable shape to roughly represent real life linkages.  

2063_082011_030000000.jpg 


A couple of failed attempts later and I managed to come up with something I was happy with.  On one point the rods will have to run below the adjacent track in a fairly prototypical manner so the underside of the track will have to be insulated to prevent the rod shorting out the tracks.  This will be done with small plasticard plates glued onto the base of the rail.

2063_082011_440000000.jpg 

The two motors were then mounted on the base board in an appropriate location to enable them to be covered and disguised by static rodding and tested.  After a couple of misfires as a result of parts of the rods interferring with other bits they started to work well and have proved to be fine since.  I will leave the temporary connections for now as I still have the change over arrangements to put in place for the live steam power supply.
Reply 0 0
Bunkerbarge
As often seems to be the case with such things parts of the project seem to be inter-dependent and such was the case with the upper level of the layout.  On the one hand I want to locate point motors below suitable buildings but on the other hand building locations will also be determined by the backscene.  Consequently while the building has been going on creating the backscene has also been progressing.

I started off by looking closely at a couple of possibilities from the ID Backscenes catalogue, which seemed to fit the bill.  I had also toyed with the idea of taking my own pictures but finding a suitable printing firm that understood what I wanted seemed to be a challenge, despite a number of phone calls.  It was then that I noticed on the 'Art Printers' web page that they would also consider making a bespoke backscene from your own pictures.  That was just what I was looking for.

Next job was to take the pictures and that involved chatting up a friend who has 'contacts' in the local church and was able to help me by arranging to allow me access to the top of the church tower on a Saturday morning while the clock was being wound up.  I therefore took my camera up to the top of the tower and took a great many sequential pictures at varying focal lengths while I tried to maintain a consistent perspective field and horizon position without the use of a tripod.  When I got home I studied the shots, picked out the best focal length and forwarded the set to 'Art Printers'.  Of course I wanted a backscene of 1 foot high by 29 feet long, times two, so the part of the shots that would be used was going to be only a narrow band either side of the horizon from my shots.  John  at 'Art Printers' stitched all the shots together before a few e-mails were exchanged to fine tune the results.  John very cleverly copied and flipped a couple of parts of the scene  to give me a bit more length and therefore allowed a wider band of the original pictures to be used, thereby increasing the resolution of the final scene.  When I explained that I was looking at a 1940s era he also produced some further magic by removing some obviously new bouses as well as removing the solar panels from many of the house roofs.  

Despite all this work he did not charge any extra for the editing and the resultant backscene cost me no more than an 'off the shelf' one would have cost.  He even gave me a discount for a large order!  I cannot recommend his service highly enough.

I must admit that when I first recieved the rolls I was a bit dissapointed as they looked quite indistinct and too soft however recent reading has taught me that the backscene should not be too sharp or high contrast as it will detract from the foreground and look unrealistic, bearing in mind that real distant horizons are not clearly defined.  I decided to trust to the expertise of 'Art Printers' and reserve judgement until it was on the wall.

2063_082052_110000000.jpg 


For mounting I decided to follow the advice given by 'Art Printers' and use Foamex foam board in 3mm sheets, which can be puchased from the supplier recommended by 'Art Printers' at 2440 mm long by 300 mm high.  This arrived superby packaged and in perfect condition so was unpackaged ready to fit.  I used a high grip sealer/glue mastic and ran it over the back of the foamex before placing it against the wall and rolling it down with a small paint roller and a seam roller.  I decided on a corner radius that enabled a smooth transition of the backscene without loosing too much of the available surface and held it in place with some masking tape overnight.  The mastic proved to be particularly sticky however and it went into place easily. 

2063_082053_170000000.jpg 


The blue is a protective film on the face of the Foamex.

2063_082053_560000000.jpg 

Next job was to place the six 1500 mm pieces of backscene on to the foamex and this was a bit trickier.  I started in the centre and ensured that the rolled up piece remained square on the base at all times while it was carefully unrolled and pressed down simultaneously.  An assistant makes this very much easier.  I did the three pieces to the left of the centre line and the first piece to the right and the more I looked at it the more I thought it fit the bill perfectly.  There were a couple of areas that I thought may require scenic breaks to hide but they are significantly fewer than I feared and I am certain that with some careful blending in and perspective assistance the backscenes are going to look better than I could have hoped.

Then I came across piece number five of the first scene, which had a cut out in it to go around a wooden post in the wall as well as go around the corner, while I was straddling the open staircase and leaning across the corner of the board.  I didn't get it square and so decided to try to remove it and try again.  I ripped it while removing it so a phone call to 'Art Printers' saved the day as they keep all customers files and can reprint any part of your bespoke scene.  Huge relief!  I'll take another shot when this wall is finished but meanwhile I am very pleased with the results.

2063_082054_320000000.jpg 
Reply 0 0
Bunkerbarge
Subsequent to the last installment I finished the backscene on the north wall but had a problem yet again with the same piece.  The challenge stems from the fact that I have to make a deep cut out to go around a piece of wood on the wall so the backscene ended up very weak and flexible at that point.  This resulted again with a bad joint but I decided this time to hide the joint with cunningly placed scenery later.  This piece also of course then threw the last piece out as well so I have two bad joints to hide.

After that I completed the two upper level loops of track and have been frequently testing it since.  The straights could be better but being fitted at arms length were never going to be easy.  The rolling stock all seems to work fine apart from the Hornby L1, which seems to have a reputation anyway.  From what I can see on line the front pony truck is a well known challenge so modifications are probably going to be required to this at some point.  It really does look like a very odd arrangement and doesn't seem to be at all reliable in operation.    

Anyway the track incorporates two crossovers between the loops on the north side with the pairs of points being operated from a single channel on the Cobalt SS control box.  I also have the two points fitted to connect to the lower levels at a later date and a point to a loco shed siding line and a goods shed siding line.  The goods shed will fill up a corner but I thought it simply looked odd with a buffer behind it as I am sure that trains will be filled as they file through the shed for its full length.  I decided to cheat by using a tunnel entrance to give the impression of a much longer siding and the best way of achieving this seemed to be by knocking around some Will's kits.  Fitting it into a curved backscene took a bit of doing.  It remains a separate piece for now until the painting and scenery pieces are added.

Another thing that absorbed a lot of time was the playing around with the building of the loco shed.  I liked the LCC kits so put one of those together and added some detail in the form of quoins to cover the corners, fans in the gable ends a piece of platform inside along one side and some signage.  I have played around with this on a test board and added a platform, also from LCC with some additional stiffening, and a coal office.  For that I didn't like the wooden staithes so I made my own from wood stock.  The derrick was a ratio kit and the water tower was a Backmann ready made item, both at this point in time still to be finished painting, detailing and weathering.  The stores/office/canteen is a cheap Hornby coach removed from its wheels, mounted on a wooden frame and weathered up.When I am happy with everything they will be transferred to the layout after the goods yard in the corner has been done.


A big challenge has been the operation of the crossovers, which regularly fail and then throw the pair into an uncoordinated mess, which takes a long time to reset.  I can only think the challenge comes from the 1 mm brass rod I have used to operate them, which maybe causes them to stick occasionally.  I must admit I am not as happy with the look of them as I had hoped so I might try for a less obtrusive and more reliable connection to the point or I might try some plastic sleeving and piano wire arrangements instead and then use plastic points rodding kits to hide them.  I have some 1mm OD x 0.5 mm ID plastic tubing and some 0.46 mm piano wire, which fits perfectly.  maybe it is a good time to have a play with the new operational points rodding from DCCconcepts! ÃƒÂ°Ã…¸ËœÆ’

When everything is eventually working reliably the electronics will be boxed in and a hinged cover fitted which will have scenic items on top of them to hide them.

2063_300257_410000000.jpg 
2063_300257_590000000.jpg 

2063_300258_150000000.jpg 

2063_300258_360000000.jpg 

2063_300259_040000000.jpg 

2063_300259_280000000.jpg 
2063_300259_450000000.jpg 
2063_300300_420000000.jpg 
2063_300300_590000000.jpg 
2063_300301_150000000.jpg 
2063_300301_340000000.jpg 
Reply 0 0
AHJAY
A nice thread, thanks for sharing it.

The "distant mount kit" for Cobalt-SS is now available - we had initial stock arrive a week or so ago and much, much more is now on the way also by air.... so within days.

It is easy to use, very unobtrusive and smooth in operation... An image to show how subtle it is.  Fine phosphor bronze wire and teflon tube.

The parts are fine as you can see - it also includes cranks for the more awkward areas. This underlay is our own. As you can see it simply fits into it with a slit cut with a sharp knife.
angle with crank view no second track.png 
Regards, AHJAY
Reply 2 0
LarryG
I do like that Cobalt SS and distant mount 'kit'.
Reply 0 0
Bunkerbarge
My track laying for this project leaves a lot to be desired in many ways, based mainly on my lack of experience. I have used a track base that, I now realise, is far too thin, planning on the supports to stiffen it, which they haven't sufficiently, and the main baseboards are cheap fabricated household doors, which are nowhere near as strong as I had hoped they would be. I have decided that strategically placed solid wood boarding will consolidate everything sufficiently.

Techniques for laying and fixing could have been better but one of my biggest mistakes was not leaving sufficient thermal expansion gaps. Being an engineer this is inexcusible but it never occurred to me when I was laying the track. In the recent very hot spell a section of track, which passes a West facing window, has deformed alarmingly so I had to go about rectifying it but that then begs the question of just how big a gap should I leave?

Going back to school the old thermal expansion formula is basically:

Change in length = Original Length x Coefficient of expansion ( Original temperature - New Temperature)

My longest straights are around 2.5 meters and, assuming the coldest it is likely to be in winter of say 15 deg C and the hottest in Summer of say 25 deg C and assuming the Coeficient of Expansion for Stainless Steel of 0.000016 this falls into place as follows:

Change in length = 2.5 x 0.000016 (25-15), = 0.0004 m, or 0.4 mm. So, to be safe, I have to allow for half a millimeter expansion on all the main straights. On the straight in question I have trimmed back an additional chair on the sleeper, slid back the fishplate, removed the track pins, lifted the track end and filed the end of the track to give a half a millimeter gap when it is replaced. I then dropped it back and slid the fishplates back into position.

The next job was how to ensure that the straights were going to be actually perfectly straight as my initial attempts with track pins were not as perfect as I would have wanted. I purchased a metre length of finished carbon steel, 16 mm x 20 mm cross section. I dropped this onto a spare section of track and slid a piece of 2mm x 2mm plastic angle strip, which just happens to have a thickness of 0.5 mm, down between the steel bar and the track. I ran superglue along its length. When it had set I removed it and glued the underside as well so I now had a solid steel former precisely 16.5 mm wide and 20 mm high. This holds the track perfectly straight for a meter and has sufficient weight to keep the track level while leaving the edge of the sleepers available to glue. So now I can drop my former onto a straight section, glue and ballast the outside of the sleepers then, when set, remove the former and ballast the centre section of the track.

I am now working towards lovely straight sections with suitable expansion gaps that won't do this on a hot day!

railway_sun_thermal_expansion.jpg 
Reply 0 0
Bunkerbarge
This is the straight track 'former' made from a piece of 20 mm x 16 mm x 1000 mm finished steel with a piece of plastic angle glued to it. Time to start working on removing track pins and glueing the straights, straight!


What I liked with this idea was the fact that the weight of the former holds the track in place quite firmly and allows you to glue the sleeper edges with it in place.

Just to make me smile I have placed the former on all my existing fitted straights and I now see just how much the track I was happy with and thought was straight is, in fact, not as true as I thought! Luckily I only used track pins so far as I wanted to prove everything works OK before committing to glueing and ballasting.


04-07-18-02RailwayStraightedgeProfile2.jpg 
04-07-18-03RailwayStraightedge1.jpg 
Reply 0 0
Bunkerbarge
A few weeks ago I thought I would have a go at rectifying the warped track I mentioned earlier and try out my new straight template as I have now at least had a go at reducing the heating effect by putting a solar film over the windows.

I decided to increase the expansion gap I had created earlier so I split the track again and filed the ends to give a slightly bigger gap. When I was happy with that I replaced the track, slid the fishplates back and put the former in place to align the track.

To start with I put a strip of masking tape against the shoulder of the cork underlay and painted a watered down PVA along the edge for around six inches. Then I peeled the masking tape back up to where I had got to with the glue and poured the ballast over the glue, gently tamping it down with a finger. I continued glueing and moving along in six inch sections until I had finished up to the end of the former.

When I had completed the first side I did the second side in exactly the same way. When the glue had completely set overnight I vacuumed the excess ballast off with a thoroughly cleaned out and dried hand held vacuum cleaner. Next I slid the former along around two thirds of its length to ensure it maintained a true position with the completed piece but still allowed the end to be positioned according to the underlay. I then continued adding the outside edge until I reached the new end position of the former. The first piece of track done was now exposed in the middle so that was filled with more ballast from a spoon, which was then distributed with a flat brush along the length of exposed track. This was then sprayed with a plastic spray bottle containing water and a little washing up liquid to break the surface tension and then, when wet, watered down PVA was laid on the ballast in the middle of the track.

I will now continue the process of sliding the former along and doing the edges as I go while back filling the middle as it becomes exposed, until I reach a curved secion of track. Then it is all freehand!

When the glue has dried I will apply some paint to the edges of the rails and some washes to the ballast and sleepers. The ballast is a mixture of DCCConcepts HO/OO Legacy Ballast in grey, which is just a little on the course side for me, and Woodland Scenics Grey Blend Ballast, which I find a little fine. Mixing the two together allows the blend to be varied to add a more realistic finish. I will do the cess in a brown blend when the two tracks are finished.

As always a steep learning curve, some aspects came out better than others but hopefully things will improve as I gain experience and move forward.

P1040914.jpg 


P1040915.jpg 


P1040917.jpg 


P1040918.jpg 


P1040919.jpg 


P1040920.jpg 


P1040921.jpg 




Reply 0 0
New Waltham
Out of curiosity, why is the layout called the Lincolnshire Loop?  Certainly one of the red brick farmhouses in your photos could have been from the wolds area.  FYI I am in the GWN but my layout is based on the Grimsby area circa 1955 to 1960 with 1962 thrown in so that I can run Deltics
Reply 0 0
Gary Long Long Rail
I used a cheap laser line which projects a red line along the center of the track, also used a 1m aluminium ruler in some areas and to blend in with curves. 
With regards to ballast size try N gauge stuff much better
Gary
Reply 0 0
Gary Long Long Rail
tapping the rail with a small hammer will allow the ballast to settle much better than a brush
Gary
Reply 0 0
Gary Long Long Rail
AHJAY wrote:
A nice thread, thanks for sharing it.

The "distant mount kit" for Cobalt-SS is now available - we had initial stock arrive a week or so ago and much, much more is now on the way also by air.... so within days.

It is easy to use, very unobtrusive and smooth in operation... An image to show how subtle it is.  Fine phosphor bronze wire and teflon tube.

The parts are fine as you can see - it also includes cranks for the more awkward areas. This underlay is our own. As you can see it simply fits into it with a slit cut with a sharp knife.
 
Regards, AHJAY


How long has that motor been available? not seen it advertised
Gary
Reply 0 0
AHJAY
More than a year...

It has been advertised but not as widely as the standard Cobalt perhaps.

Here is  a current A5 ad...

regards, AHJAY
A5 CBSS.png 
Reply 0 0
Bunkerbarge
New Waltham wrote:
Out of curiosity, why is the layout called the Lincolnshire Loop?  Certainly one of the red brick farmhouses in your photos could have been from the wolds area.  FYI I am in the GWN but my layout is based on the Grimsby area circa 1955 to 1960 with 1962 thrown in so that I can run Deltics


I live quite close to Woodhall Spa, GNR area and on part of what was the Lincolnshire Loop.  I would like to have a go at scratch building a station, when I get that far, based on my local one, which is still standing.
Reply 0 0
Bunkerbarge
I used a cheap laser line which projects a red line along the center of the track, also used a 1m aluminium ruler in some areas and to blend in with curves. 
With regards to ballast size try N gauge stuff much better


For myself I find it far more positive to actually hold the track in place while I ballast it to ensure the best possible straight fit.  Following a line, ruler or marker I find always has the potential to lead to very slight deviations.  Maybe you could describe your procedure in more detail on another thread for others to see?

I am actually using a blend of ballasts and will vary it according to the location as regards colour and size to give variations.  As to whether 'N' gauge is 'better', perhaps again you could show your own comparisons in another thread, then we would all get the chance to learn from alternative procedures.
Reply 1 0
Reply