Mister Rusty
Hi All,
The  reason that l have not been around is that a lot of time has been invested in the plate-laying on Buchshee to endeavour to get perfection [some hope!] despite not starting from virgin boards. Even the joint dowels have been taken out and replaced to improve alignment, over-centre clips making for very fast, accurate alignment, along with DCCconcepts dowels.
Now, l do not have to grovel and wriggle on the floor as l did with previous fixed layouts. One of the benefits of exhibition layouts is they can be put on their back module by module, or even upside-down for work on wiring, point-motors etc.
it is well-worth considering when building a new layout, even a never-to-be-moved one. You WILL be older when it needs a repair or modification.😉 Just think, take out a module and sit at a bench to sort it. Simples!!! Mine have a 2-pin plug and socket to connect the bus [track, in my case] between boards, and a fly-lead with male and female units in parallel to power-up any module, mine or a compatibly-wired layout, friends have several.
As access under is now easy, it means that tables can be used to support the layout, less crapentry needed, faster start time on the layout, an all-round win-win.
Photos to follow.
TTFN
Pete
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 1 0
Julian
Hi All,
The  reason that l have not been around is that a lot of time has been invested in the plate-laying on Buchshee to endeavour to get perfection [some hope!] despite not starting from virgin boards. Even the joint dowels have been taken out and replaced to improve alignment, over-centre clips making for very fast, accurate alignment, along with DCCconcepts dowels.
Now, l do not have to grovel and wriggle on the floor as l did with previous fixed layouts. One of the benefits of exhibition layouts is they can be put on their back module by module, or even upside-down for work on wiring, point-motors etc.
it is well-worth considering when building a new layout, even a never-to-be-moved one. You WILL be older when it needs a repair or modification.😉 Just think, take out a module and sit at a bench to sort it. Simples!!! Mine have a 2-pin plug and socket to connect the bus [track, in my case] between boards, and a fly-lead with male and female units in parallel to power-up any module, mine or a compatibly-wired layout, friends have several.
As access under is now easy, it means that tables can be used to support the layout, less crapentry needed, faster start time on the layout, an all-round win-win.
Photos to follow.
TTFN
Pete

Have considered using the metal dowels to connect the board Bus wires to each other?  The Bus being soldered to the back end of two matching male/female dowels.

Regards

J
Reply 0 0
Mister Rusty
J
It is why l am changing to brass dowels.
It was my intention when l bought DCCc passivated dowels last year, but they are alloy and do not easily connect electrically without spoiling their finish.
What bus wires?
Pete
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 1 0
Julian
J
It is why l am changing to brass dowels.
It was my intention when l bought DCCc passivated dowels last year, but they are alloy and do not easily connect electrically without spoiling their finish.
What bus wires?
Pete

I agree, it would be a shame to have to spoil those nice alloy dowels.  Mine are the steel versions, with C1" wide bases, with glue and three screws in each.  They are similar to some of the brass ones I have seen.  I simply used a longer screw which protruded through the mating wood surfaces and solder wires to them.  I had remembered that you were not running droppers, from some earlier posts, so was referring to the rails and connecting wires as a Bus.  Apologies, I hadn't intended to re-invent you baseboard.

Regards

J
Reply 0 0
Jaz Avalley JazAvalley

To my mind testing and testing, and ensuring you are happy is always acceptable, then loco pulling wagons on working track, with cat food on last wagon and cat in hot pursuit is ALWAYS fun...best NOT use an expensive loco if you try this!

TIP ALWAYS check you can get in your LONGEST Train, or else you will end up bashing your head on the nearest wall!.

 

P.S. The DCC Concepts dowels seem interesting any photos?

Jaz Avalley

Model Railway Discussion Group

https://www.facebook.com/groups/495282280644117/
Reply 0 0
Mister Rusty
Ask and ye shall receive:-
15668575501367648947786020403996.jpg    
30 seconds later, just the clips clipped home 15668576524638888882362403848785.jpg 
And the alignment is thus every time15668576985953688482254853762334.jpg   .
Track laid over joint, then cut using DCCconcepts rail cutters and an X-acto saw.
Ballast was then laid using a 25%  solution for stronger bond.
The baseboards then had to be eased apart firmly as some PVA had done as it should and glued the 2 boards together. Next time, 2 pieces of cling film will be placed in the join to aid separation.
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 1 0
Mister Rusty
Anyone notice the missing sleeper?

There are 2 neodymium magnets under each rail for operation of Kadees.
Better than the original ''barrow crossing'' Kadee magnets, both aesthetically, and operationally as the Kadee item is not suitable for code 75 as it stands proud when laid on the sleepers, and requires too much butchery to drop it to the correct height.
Putting the Kadee unit under the track reduces the magnetic force to marginal.
Magnets are 8mm diameter 1x 1mm and 1x0.5mm on each rail, cyano-attached to the rail, with 7mm between the 2 stacks. Glue one first, then put a spacer in to stop the second lot joining the first 🙄.
It is no trouble to slice out a sleeper and slide these in, after the track is laid, just clear the ballast properly.

TTFN
Pete
ps started a point-mod post 5 times and lost it each time.
Had enough, off to beddie-byes
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 1 0
Bunkerbarge
I keep a roll of clingfilm in the workshop and use it frequently when I want to control the flow of glue!  Very neat job Pete, not easy getting it so good when the track crosses the joint at an angle.
Reply 0 0
Mister Rusty
As the layout was designed and built 20 years ago, using rails soldered to paxolin, l felt a sufficiency of time had passed, and a fresh approach should be sought
The paxolin was removed, replaced with balsa to regain a flat track-bed.
The track was then laid across the joint and liberally glued, using superb-glue.
Once set [24 hours were allowed], the rails were snipped through, and the ends lightly dressed.
This left sufficient room for an X-Acto razor saw to cut the sleeper-base.
The result was as shown above. First time that l had ever tried such an operation, delighted with the result.
Hope that it helps.
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 1 0
Mister Rusty
Jaz commented about testing with one's longest train and banging one's head on the wall.
My issue was exactly that.
4 coaches and a Duchess in a 2-coach platform.
1 cut a hole in the backscene
2 lengthen platform
3 build a head-shunt
My final solution,  yet to be finished 15669044057901332174950.jpg  Now you know why I've been quiet 
TT is digital-drive, my style, as seen in other posts.
Ground cover is coffee-grains, dried after use, as an experiment, other tracks and exits will be installed as the module is designed to fit multiple layouts, attached with lock-grips.
DCCconcepts lighting from and packaged as Gaugemaster, so beautifully made, much finer than most other suppliers.
The module lives under Killin Junction station building, now known as Buchshee [Bocsidh, in Gaelic].
Gorra goo, shop called, repairs to collect, they take priority.
TTFN
Pete
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 1 0
Jaz Avalley JazAvalley

Ask and ye shall receive:-
15668575501367648947786020403996.jpg     30 seconds later, just the clips clipped home 15668576524638888882362403848785.jpg 
And the alignment is thus every time15668576985953688482254853762334.jpg   .
Track laid over joint, then cut using DCCconcepts rail cutters and an X-acto saw.
Ballast was then laid using a 25%  solution for stronger bond.
The baseboards then had to be eased apart firmly as some PVA had done as it should and glued the 2 boards together. Next time, 2 pieces of cling film will be placed in the join to aid separation.

I agree with you, that is a natty piece of kit.

I also agree with Bunkerbridge vey nice aligned, the extra effort really pays off, I do not even see any fishplates. 

I also like the fact the dirtier track is near the platform where it would stop more often 🙂

Jaz Avalley

Model Railway Discussion Group

https://www.facebook.com/groups/495282280644117/
Reply 0 0
Mister Rusty
Track is yet to be spot weathered.
So far it's only had a general grime put on, after being ballasted
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 1 0
Mister Rusty
Also, there are no fishplates, utterly un-necessary. 
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 1 0
Mister Rusty
Just had a friend's layout module brought to me.
The beauty of module engineering can be seen.
1 - just the faulty module can be inspected/transported etc.
2 - standing it on its back edge makes it easy to trouble-shoot.
3 - test protocols are simplified
4 - no physical dexterity needed
15673398262502259030099072090131.jpg  One of the advantages of using the DCC Cobalt  Alpha Central switch box is that l can easily swap between several layouts, using up to 12 single points per layout.
After all, 7 is 7 on whichever layout.
As l say, think on  before cutting wood. The tables are catering tables, bought on-line for around £25 each. 
Just think, l do not have to kneel on the floor, nor grovel upside-down  to do wiring.
Or do you enjoy that aspect? 🤣
Just as well  really as my fake knees are weird to kneel on. 🙄
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 2 0
Bunkerbarge
Nice neat job.  A lot to be said for the modular approach, which I guess we tend to think of as 'exhibition' orientated.  Can have value in fixed layouts as well.  On the other side of the balance of course is dealing with the joints but, once you become adept at that the advantages start to outweigh the disadvantages.
Reply 1 0
Reply