Bryan Lane Bryan.Lane

Hello Everyone,

Well I’ve enjoyed reading lots of stories, help and advice here on this Forum, but have never been brave enough to put finger to iPad and submit something myself - until now !

My reason for stepping out of my comfort zone is to say something about my retirement project, a model railway to be called Pevenbourne, but also because I’m hoping for some help and advice from a forum that I feel I can trust. 

So retirement is going to happen on the 17th October 2023, after (if I make it !) 44 years service in the Rail industry. It’s been my plan to build a model railway for a while now, and I’ve been doing a lot of research in magazines and forums to help me shape my plans. Currently, this has evolved to a two layer railway, 500mm apart and connected via a five circle double track helix. I’ve pored for many hours over my design that has evolved over the past couple of years on my laptop using the brilliant AnyRail software.

We even moved house 18 months ago, partly because the old house really didn’t have anywhere suitable for my plans. The new house has a proper garage conversion to a room that is where Pevenbourne will be built. I’m just adding a new ring main for plenty of mains sockets in trunking around the skirting boards, LED Track lighting for good viewing and some cabinets for my 150 or so bus models. Finally, the top part of the room will be wallpapered with a blue sky and clouds design. I’m hoping to begin laying the boards for the lower level early next year. This will have a turntable style MPD on one side of the room connected to carriage sidings and then the bottom of the helix. This level is all about storage of my trains. I estimate that it will take about a year to 18 months to finish the storage level.

After the helix is added, I’ll commence the upper, main running level. So, this is where I seek your valued wisdom at this stage of my plans, any opinions, advice or help would be very much appreciated. The railway will be DCC and I’ve already invested in a Z21 system and played lots with it.

Currently, my thoughts are to get three Z21 Dual Booster units and create (along with the main control box) five power districts with two of the boosters and then two accessory buses (one for each level) with the third booster box. I’d connect them all together using the CAN Bus. This I believe should provide enough power and protection for the railway. I’d also be using 2 x ADS-2fx and 3 x ADS-8fx units for my junctions powering (probably) Peco solenoid motors, or maybe SEEP versions ? There will need to be a return loop controller on the lower level and at least another one on the upper - I’ve got a layout on the upper level that might be a bit of a challenge with respect to return loops, but I’ll think about that another time as it’s causing me a bit of a headache at the moment !

I’d like to get all the expensive kit and wiring at least purchased prior to retirement and some of it installed and working. I’ve researched significantly using the resources kindly provided by the guys at DCC Concepts to come up with what I believe is a good solution for power arrangements, it follows heavily the advice provided by DCC Concepts. But I wonder, is there a better way to do it ? Can DCC Concepts provide their own kit to be a better solution, or a cheaper solution ?

Thanks for reading, I look forward to any contributions anyone would like to make.

kindest regards,

Bryan

Bryan Lane
Pevenbourne Model Railway 
Eastbourne
Reply 3 0
Bunkerbarge
Hi Bryan, Interesting project and certainly one that is going to produce some worthwhile reading on here. I must say I commend you on your forward planning!  The technical questions I can only defer to those more knowledgeable than me but I am certainly looking forward to seeing how your scenery aspects of the layout are tackled.

The most important part is to take lots of pictures, then share them on here.
Reply 2 0
Emira Blight Ruffnut Thorston
Hi.

Sounds like a big plan...

Not a technical question...

Pevenbourne....

Pevensey and Eastbourne?

Just that is what immediately came to mind...🙋
Best wishes,
Em.
🧙🏼🙋🏼‍♀️
Reply 1 0
awh1
I see you contemplate solenoid points. With 3 x ADS-8fx and 2 x ADS-2fx units there will apparently be quite a few so I gather you are being guided by economy. When I resuscitated my layout last year the guys at DCC Concepts were very firm in guiding me away from solenoids using a single bus and NCE Pro Cab dcc control (5 amp). I chose to use Cobalt ips and SS points all round, all dcc controlled through Cobalt Central / AEU  with S Levers. Am glad I did. All my old solenoids are now discarded, particularly since all points are now electrofrog.

Just passing on my experience. Am not nearly as technical as you appear to be.
Reply 2 0
Briperran
Hi Bryan
Reading through your plan you seem to have decided many aspects of what you are trying to do.
You do not seem to be trying to do things as cheaply as possible and am surprised you are using solenoid point motors have you not considered using slow action point motors like Cobalts or Tortoises or if they are to be mounted above baseboard Cobalt SS above baseboard motors?
Re your question regarding the power solution thats been recommended so far of course there is an elephant in the room regarding what you are asking as this is the DCC concepts forum im sure what has been recommended by them is extremely good but if you want another commercial opinion may i suggest a telephone call to Digitrains or perhaps DCC Automation and see what they may suggest which may well be the same as recommended.

Brian
Reply 2 0
AHJAY
There is no elephant in the room. All subjects are OK as are all opinions.

Your plans look great.

One thing I would say is use PowerBase for at least one full train length before and after the helix and of course under all of the helix track too. That will guarantee that you will actually get reasonable trains up the helix as OO/HO trains can be incredibly disappointing on gradients when it comes to haulage ability. It is not high cost and WILL at least ensure you will not be disappointed)Look at the combined cost rather than individual items as economy is not just unit cost - it is really unit costs plus wire plus wiring time etc...

I would aslo recommend that you use Code 75 track and stay 100% with live frog (electrofrog) pointwork.

As to cost, its not about low unit costs.
For example its actually often cheaper to buy a motor that works well ALL of the time that already includes any onboard switching needed because its also more reliable that way (no separate switch to go out of adjustment). It is also better to buy a motor with the decoder built in cost wise - and that needs less wire and will be easier to live with too.

As to "US" - Reliability cannot be questioned really. We test all motors to beyond a reasonable lifetimes use, and is important too. If you have to buy twice there is no saving in low cost! In all comparisons a cobalt motor will, for example, outlive a solenoid by a very long time. Solenoids are also much harder on points - when we test solenoids we have to change the test pointwork very often, but our last test point using cobalts lasted many hundreds of thousands of changes because the action is very gentle!  (That is also why we can offer a lifetime warranty)

As always its up to you - but if you DO look at SEEP motors, please use the new ones not the old original seeps. The new SEEP is far, far better in reliable changing, it is lower current and far better built too.

regards, Ahjay
Reply 2 0
Bryan Lane Bryan.Lane

Bunkerbarge wrote:
Hi Bryan, Interesting project and certainly one that is going to produce some worthwhile reading on here. I must say I commend you on your forward planning!  The technical questions I can only defer to those more knowledgeable than me but I am certainly looking forward to seeing how your scenery aspects of the layout are tackled.

The most important part is to take lots of pictures, then share them on here.
Thanks Bunkerbarge for your kind comments. I will continue to post as things progress. There’s not much to see yet, a room full of boxes and trunking, cables and sockets going in ! It’s been a while in the planning and of course the house move. I want to get things right and avoid problems later on, that’s why I think forward planning is good. And it’s great reading the advice and experiences of people like yourself. 

Best regards,

Bryan
p.s this is the first time I’ve replied to anyone, if I’ve done it wrong I apologise !

Bryan Lane
Pevenbourne Model Railway 
Eastbourne
Reply 1 0
Bryan Lane Bryan.Lane
Hi.

Pevenbourne....

Pevensey and Eastbourne?

Just that is what immediately came to mind...🙋
Hi Ruff,
You’re spot on ! It’s where i live 😊
Well done !

Best wishes,

Bryan
Bryan Lane
Pevenbourne Model Railway 
Eastbourne
Reply 1 0
Bunkerbarge
Bryan.Lane wrote:
Thanks Bunkerbarge for your kind comments. I will continue to post as things progress. There’s not much to see yet, a room full of boxes and trunking, cables and sockets going in ! It’s been a while in the planning and of course the house move. I want to get things right and avoid problems later on, that’s why I think forward planning is good. And it’s great reading the advice and experiences of people like yourself. 

 

Best regards,

Bryan
p.s this is the first time I’ve replied to anyone, if I’ve done it wrong I apologise !



Spot on Bryan, you'll be embedding movies in no time!
Reply 1 0
Bryan Lane Bryan.Lane

Hi Everyone,

Thank you all so very much for taking the time to reply and offer your valuable advice, knowledge and opinions, it really is very much appreciated. 

I’ve noted the common thread to your posts regarding point motors. An unwise man would disregard such advice from three separate sources, and so I’m going to take it onboard and look again at my solution for points. My original plans for point motors is based on previous experience of solenoid point motors, but this experience is from the late seventies when, as a teenager, I had a model railway in my parents’ loft. It was operated using Hornby’s Zero 1, point levers and little solenoid point motors. But the seventies are now a very long time ago, times have moved on and so perhaps, ought I !

I think part of what worries me is the size of cobalt point motors in comparison to solenoids, I’m concerned about there being enough room to mount them under, for example, a double track scissor junction. Mind you, I’ve never actually seen one for real, I’m basing my judgement on what I’ve seen on YouTube videos - perhaps that’s an unfair judgement. Probably I need to have a look a one. I note your comment AHJAY about reliability, and I have no doubt this is true from the many reviews that I’ve read about them. 

Briperren, thank you for your comments about the power arrangement. What I was wondering, and alluding to in my first post, is to see if anyone thought there may be a better solution for the Power Districts and Accessory Buses than my proposal of using Z21 Dual Boosters. These are dual 3A boosters. Do DCC Concepts have something similar that would be compatible with Z21 ? In particular, to provide maybe a higher current for each of the Power Districts ?

Then there’s AHJAY’s advice regarding Powerbase, I think that’s a great recommendation, particularly for the Helix on the up direction track so I’ll be looking at some more YouTube videos with a view to implementing it. I’ll also download and read the advice leaflets from the DCC Concepts website. Probably I will also use it for another graded track on the upper level as well. Incidentally, I’ve restricted all slopes on the railway to be 3% or less - I’ve read advice that it wouldn’t be wise to exceed this. Also, the smallest radius track is 450mm.

And finally, track. AHJAY mentioned to use Code 75, and this is indeed the plan for the helix and upper level of the railway. However, the storage level will be Code 100 - the only reason for this is that I acquired a lot of Code 100 track, points and crossovers from a friend’s father when he died, along with the rest of his model railway. There’s almost enough to complete the storage level so it makes sense, and will be a fitting use of my friend’s dad’s railway. Most of the points and crossovers haven’t been used. 

I’m planning to visit the DCC Concepts shop in the not too distant future. I’m hoping to come and have a chat with someone to discuss and finalise my plans. I’ve got a bit more thinking to do first and that’s all thanks to you guys offering your advice. I shall come to Settle with a fat wallet and hope to exchange cash for the first load of kit to get my Railway off the ground. 

Thanks again Gents,

Kind regards,

Bryan

Bryan Lane
Pevenbourne Model Railway 
Eastbourne
Reply 0 0
Emira Blight Ruffnut Thorston
Hi Bryan.

That is a nice area.

I love Eastbourne station. Especially the clock tower on the corner, and the huge signal box.

The station retained the BR(S) enamel notices for a long time after the black and white notices were meant to have taken over.

I had friends who lived in Bexhill, and Sidley a long time ago now, and traveled from Brighton, where I went to school for some time.

That's why the name rang a bell! 😉😃🙋
Best wishes,
Em.
🧙🏼🙋🏼‍♀️
Reply 1 0
Peter Rust Rusty Pete
Hi Bryan
A visit to Settle is always worthwhile, and a delight, too.
I have been a couple of times and always been made very welcome.
If you send them  a heads-up of what you are doing, track-plan etc, l am certain that your visit will be fruitful.
I am renovating  20year-old layout that had Peco motors that were falling apart because of 70s  tech, (capacitor discharge power screws them quite quickly. I have fitted DCCconcepts iP digital units and will recommend them to anyone. Concern over clearance depth can be ameliorated by using a 90 degree device that they have created.
Ask them as much as you wish. They give it candidly, and cheerfully if you phone.
All the best
Pete
Ps allow a full day, go B&B nearby, we will, in future.
More than one way to skin a cat ðŸ˜‰
Reply 2 0
Bunkerbarge
Next weekend is, of course, one of the largest model railway shows on the calendar, The Great Electric train Show at Milton Keynes, so well worth a visit.  The majority of the big names will be there and available for conversation and advice but, for me, the biggest attraction is looking for ideas amongst the huge number of layouts on show.
Reply 2 0
JonD
Bunkerbarge wrote:
Next weekend is, of course, one of the largest model railway shows on the calendar, The Great Electric train Show at Milton Keynes, so well worth a visit.  The majority of the big names will be there and available for conversation and advice but, for me, the biggest attraction is looking for ideas amongst the huge number of layouts on show.


I'd truly love to go but Milton Keynes is a bit far for me  - like 16,500 km too far ....... ÃƒÂ°Ã…¸ËœÆ’
Brisbane to Milton Keynes.png 

But maybe next year.  After living in the antipodes for 51 years we will be relocating and "coming home" next year,  if everything goes to plan ÃƒÆ’°Å¸â€˜Â. 

The ironic thing is that I will be bringing with me a model rail layout that my Dad built in the early '60's before we emigrated to AUS.  It sat boxed up and neglected in its original shipping crate for the 47 years,  and has only in the past few years since I have retired,  literally seen the "light of day". Since then I have endeavoured to tastefully renovate it and bring  it back into full operation, as part of a much larger layout that I can currently building.   And this too will be now be going back home to the UK,  where it was originally built!
Reply 2 0
Bunkerbarge
That layout must have covered more miles than just about any other layout Jon!  What an interesting story.  I also built a layout with my father in the 60s but it was built into a basement so had to remain with the house.  I often think about what he might have made of the layout I am building now.  I know one of his thoughts would be that I am spending far too much money on it!!  He was what you might call a 'careful' Yorkshireman with his money.
Reply 1 0
Reply