Bryan Lane Bryan.Lane

Hello Everyone,

Well I’ve enjoyed reading lots of stories, help and advice here on this Forum, but have never been brave enough to put finger to iPad and submit something myself - until now !

My reason for stepping out of my comfort zone is to say something about my retirement project, a model railway to be called Pevenbourne, but also because I’m hoping for some help and advice from a forum that I feel I can trust. 

So retirement is going to happen on the 17th October 2023, after (if I make it !) 44 years service in the Rail industry. It’s been my plan to build a model railway for a while now, and I’ve been doing a lot of research in magazines and forums to help me shape my plans. Currently, this has evolved to a two layer railway, 500mm apart and connected via a five circle double track helix. I’ve pored for many hours over my design that has evolved over the past couple of years on my laptop using the brilliant AnyRail software.

We even moved house 18 months ago, partly because the old house really didn’t have anywhere suitable for my plans. The new house has a proper garage conversion to a room that is where Pevenbourne will be built. I’m just adding a new ring main for plenty of mains sockets in trunking around the skirting boards, LED Track lighting for good viewing and some cabinets for my 150 or so bus models. Finally, the top part of the room will be wallpapered with a blue sky and clouds design. I’m hoping to begin laying the boards for the lower level early next year. This will have a turntable style MPD on one side of the room connected to carriage sidings and then the bottom of the helix. This level is all about storage of my trains. I estimate that it will take about a year to 18 months to finish the storage level.

After the helix is added, I’ll commence the upper, main running level. So, this is where I seek your valued wisdom at this stage of my plans, any opinions, advice or help would be very much appreciated. The railway will be DCC and I’ve already invested in a Z21 system and played lots with it.

Currently, my thoughts are to get three Z21 Dual Booster units and create (along with the main control box) five power districts with two of the boosters and then two accessory buses (one for each level) with the third booster box. I’d connect them all together using the CAN Bus. This I believe should provide enough power and protection for the railway. I’d also be using 2 x ADS-2fx and 3 x ADS-8fx units for my junctions powering (probably) Peco solenoid motors, or maybe SEEP versions ? There will need to be a return loop controller on the lower level and at least another one on the upper - I’ve got a layout on the upper level that might be a bit of a challenge with respect to return loops, but I’ll think about that another time as it’s causing me a bit of a headache at the moment !

I’d like to get all the expensive kit and wiring at least purchased prior to retirement and some of it installed and working. I’ve researched significantly using the resources kindly provided by the guys at DCC Concepts to come up with what I believe is a good solution for power arrangements, it follows heavily the advice provided by DCC Concepts. But I wonder, is there a better way to do it ? Can DCC Concepts provide their own kit to be a better solution, or a cheaper solution ?

Thanks for reading, I look forward to any contributions anyone would like to make.

kindest regards,

Bryan

Bryan Lane
Pevenbourne Model Railway 
Eastbourne
Reply 3 0
JonD

Bunkerbarge wrote:
That layout must have covered more miles than just about any other layout Jon!  What an interesting story.  I also built a layout with my father in the 60s but it was built into a basement so had to remain with the house.  I often think about what he might have made of the layout I am building now.  I know one of his thoughts would be that I am spending far too much money on it!!  He was what you might call a 'careful' Yorkshireman with his money.

Yep,  a full "around the world" trip.   I too have often wondered what my Dad would have made of it all,  if he was still alive now.  He also was an engineer,  so I think he would be standing shoulder to shoulder with me, offering suggestions and ideas.  

Reply 2 0
AHJAY
HI. A few notes in the text.

Bryan.Lane wrote:

Hi Everyone,

Thank you all so very much for taking the time to reply and offer your valuable advice, knowledge and opinions, it really is very much appreciated. 

** Its good to take your time and think. Because of that we (more often than you may imagine) ask people to slow down and think a little more before parting with cash... Why? - because I really hate it when modellers make early mistakes/errors and fill the bottom drawer with waste or end up disappointed or having wasted lots of good modelling time. A little time and an hour or two spent face to face will save money by ensuring that when the wallet is opened, it will be for things that give 100% success first time.

I’ve noted the common thread to your posts regarding point motors. An unwise man would disregard such advice from three separate sources, and so I’m going to take it onboard and look again at my solution for points. My original plans for point motors is based on previous experience of solenoid point motors, but this experience is from the late seventies when, as a teenager, I had a model railway in my parents’ loft. It was operated using Hornby’s Zero 1, point levers and little solenoid point motors. But the seventies are now a very long time ago, times have moved on and so perhaps, ought I !

** Solenoids can work just fine but they do not give you the easy installation or added switching ability of Cobalt. Adding things to solenoids can work but it will create ongoing maintenance needs especially if you are using live frogs etc... which you should. (I should add that we actually make solenoids for other brands and those we do make are inevitably the "best rated" in every magazine article... but Cobalt still trumps them for anything that needs added control and super reliability!

I think part of what worries me is the size of cobalt point motors in comparison to solenoids, I’m concerned about there being enough room to mount them under, for example, a double track scissor junction. Mind you, I’ve never actually seen one for real, I’m basing my judgement on what I’ve seen on YouTube videos - perhaps that’s an unfair judgement. Probably I need to have a look a one. I note your comment AHJAY about reliability, and I have no doubt this is true from the many reviews that I’ve read about them. 

***Plenty of room for Cobalt under a scissors crossing, 3 way, slip, double junction or anything in OO. Cobalt is actually far smaller than other brands of mtor drive (actually half the size of the nearest other option).

Briperren, thank you for your comments about the power arrangement. What I was wondering, and alluding to in my first post, is to see if anyone thought there may be a better solution for the Power Districts and Accessory Buses than my proposal of using Z21 Dual Boosters. These are dual 3A boosters. Do DCC Concepts have something similar that would be compatible with Z21 ? In particular, to provide maybe a higher current for each of the Power Districts ?

** The Alpha box. Far better power management and five amps with overload protection and power loading warnings if you get close to that. Use it with the Alpha power, which is also a far higher quality power supply than ANY other power supply offered in the hobby.

Then there’s AHJAY’s advice regarding Powerbase, I think that’s a great recommendation, particularly for the Helix on the up direction track so I’ll be looking at some more YouTube videos with a view to implementing it. I’ll also download and read the advice leaflets from the DCC Concepts website. Probably I will also use it for another graded track on the upper level as well. Incidentally, I’ve restricted all slopes on the railway to be 3% or less - I’ve read advice that it wouldn’t be wise to exceed this. Also, the smallest radius track is 450mm.

** If you like smaller locos seriously consider putting it under 100% of the track. We were amazed how much better pickup quality became with small locos and personally I will never ever build another layout without it under every inch.

And finally, track. AHJAY mentioned to use Code 75, and this is indeed the plan for the helix and upper level of the railway. However, the storage level will be Code 100 - the only reason for this is that I acquired a lot of Code 100 track, points and crossovers from a friend’s father when he died, along with the rest of his model railway. There’s almost enough to complete the storage level so it makes sense, and will be a fitting use of my friend’s dad’s railway. Most of the points and crossovers haven’t been used. 

** That makes total sense. No point in wasting it. DO use 75 on the helix though - that wee bit closer spacing between powerbase plates and magnets makes a difference.

I’m planning to visit the DCC Concepts shop in the not too distant future. I’m hoping to come and have a chat with someone to discuss and finalise my plans. I’ve got a bit more thinking to do first and that’s all thanks to you guys offering your advice. I shall come to Settle with a fat wallet and hope to exchange cash for the first load of kit to get my Railway off the ground. 

** You will be most welcome. If you want lots of tech help and advice make sure that Anthony, Mick, Richard B or John will be here when you arrive - a phone call can quickly confirm that

Thanks again Gents,

Kind regards,

Bryan

Reply 2 0
Pad-Ply-Pen
Looking At Bryan’s post seems almost a parallel universe 
I am looking forward to visiting the BOFFINS 
at DCC Concepts around  16/17 how they will feel after that is another matter 😀 hope they have a darkened room to recover !!
PPP
Reply 2 0
Bryan Lane Bryan.Lane
Hi Bryan
A visit to Settle is always worthwhile, and a delight, too.
I have been a couple of times and always been made very welcome.
If you send them  a heads-up of what you are doing, track-plan etc, l am certain that your visit will be fruitful.
Thanks Pete, we have friends in Lancaster so we’re planning to visit for a long weekend sometime soon when they’re free. We’ll take the Friday off work, and travel up Thursday evening, I’ll allocate the Friday to visit the guys at Settle. Will make a pdf of my AnyRail plan and e-mail ahead. AHJAY has given me some names to ask for so I’ll call a couple of weeks ahead and arrange my visit so that I can get the most out of it. I’ll also write down a list of questions to ask as well. And as a bonus, it’s a beautiful part of the country too as you rightly say.
Cheers !
Bryan
Bryan Lane
Pevenbourne Model Railway 
Eastbourne
Reply 1 0
Bryan Lane Bryan.Lane
Thanks again everyone, I shall do a bit more homework looking into the various things that have been mentioned here. Then I’m going to visit the guys in Settle. Hopefully the first boards will start to go down early next year. I’ll keep you posted as and when.

Cheers guys !

Bryan
Bryan Lane
Pevenbourne Model Railway 
Eastbourne
Reply 1 0
Bryan Lane Bryan.Lane

Bunkerbarge wrote:
Next weekend is, of course, one of the largest model railway shows on the calendar, The Great Electric train Show at Milton Keynes, so well worth a visit.  The majority of the big names will be there and available for conversation and advice but, for me, the biggest attraction is looking for ideas amongst the huge number of layouts on show.
Hi Bunkerbarge, 
Yes indeed the Great Electric Train Show looks to be a superb event. I have been to two or three shows, but unfortunately I struggle with them. There are just so many people there, and for me this creates a problem. I live with anxiety/depression which I mostly manage without too much problem having had to deal with it for about ten years now. But one of the triggers of my anxiety is large crowds in confined spaces, and Model Railway Shows create those conditions. It’s a shame really as I’d love to go to some of the big ones that are coming up. I can usually manage ok with the smaller shows so long as I can get out quickly if I start to feel anxious. But thanks for the suggestion, it’s much appreciated. 

Best wishes, 

Bryan

Bryan Lane
Pevenbourne Model Railway 
Eastbourne
Reply 1 0
Peter Rust Rusty Pete
You have my sympathy, I've  lived with it for 50 years, until 10 years ago.
It's  not funny, but those who have not suffered seem to find it so.
More than one way to skin a cat ðŸ˜‰
Reply 2 0
Bunkerbarge
Pete, It seems a little unfair to claim that everyone who has not suffered find it funny.  I think this is one of those conditions that the majority actually suffer from but to vastly varying degrees.  I can fully understand and sympathise as, while not being affected to the same degree as Bryan, I would still never go to a football match or a pop concert.  I just feel very uncomfortable if I am not in control of myself and my surroundings and within such large crowds as that I most certainly would not be.  I am OK with smaller gatherings but, should it start to get too crowded I would naturally be looking for a bit more space.

I can live with missing out on football and concerts, although I would have given my right arm to see Queen or Pink Floyd, but I do feel for those who miss out on such things as shows and exhibitions where there is so much to potentially enjoy.

At least Bryan can enjoy the smaller ones, which I do tend to think have as much to offer and certainly in a more intimate atmosphere. 
Reply 3 0
Peter Rust Rusty Pete
Richard, I accept that l may have exaggerated the the percentile, however l maintain that it is closer to 99.5% than zero ðŸ˜„
Clapton at The Albert Hall was okay, until a bomb scare evacuated Edgware Road on the way home.
It's also why l avoid London totally these days.
It's not the fear of violence or assault, it's more an insidious pressure thing.
Anyway, enough, back to chuffers....😉 [or darbooms..😏]
More than one way to skin a cat ðŸ˜‰
Reply 2 0
Jaz Avalley JazAvalley

a belated welcome to posting 😃.

I agree the planning stage cannot be hurried, you can change your mind a million times and still not go wrong 🙂 You can put stuff down and look at it critically and do things  that suit  YOU, you need to be comfortable with it. You will be surprised how a short person can find a layout made by a taller person with a longer reach can be a real pain. Person with a belly had best avoid track that they might accidentally knock stock over. A disabled person might wish to consider a seating height, and frankly as you get older forward thinking so that you can continue to use it if you are unlucky enough to have bad health later might be worth accommodating. 

I love Helix we added one, we went the full train length at both ends as suggested by Ahjay (it's a very good point) but even though we designed with long trains in mind, we had several which would fall to centrifugal force and just literally fall off....YIKES!...we tried testing them unpowered first with extra width and adjustable bars and still ended up tearing it out. We tried weighting them, and any number of other ideas. We could have persevered but had room for a long fall and rise so just chickened it. I would say to you it is a brilliant idea, I would recommend you go for it early on, test and retest, allow width for adjustment, and some duvet or pillows in case it takes off! Many people get them to work so do not be put of by my horror story, just go carefully, research, and have fun. 🙂

I would say if you plan the whole hog scenic. Do the ceiling first, because climbing on the tables to paint the ceilinged or wallpaper it can be tiring on the arms (been there done that got the t shirt LOL) IF you might ever have to climb on the table make sure it can take your weight! And get the back scene in asap. You can take be blue down, some people with the photographed backgrounds cut around the trees or horiszon and allow the blue to go behind.

The last one I would say is keep your points or track transfers to somewhere you can easily reach in the event of maintenance. This can be achieved in lots of ways. People sometimes have a scenic area you can pop up under. Or a lift off area ,or an area you can lean one hand comfortable on and reach further a field.You can have just the track in permanent position, and drop in scenic areas (this can lead to optional scenic areas, handy if you want more ideas than you can fit in to the space available. 

Also when spacing track, I personally would advise never ever go for the narrowest options, if you want to fit in scenic trackside detail later you might end up turning the air blue, signals, ground signals, scenic looking power lines (often four at a time) need space to be squeezed in between tracks.

IF you have enough room for a long platform, chances are you will use it, Consider just what is likely to be your longest passenger train as well as rolling wagons. Once you have that, you can then know where you might want to have DCC cut offs.

There are so many points I could bore for Brittain on those points, but my final point is, it is YOUR railway, YOUR rules, if you want to be a rivet counter enjoy it, and if you don't enjoy it. Never ever be pushed by others friends or otherwise to do what they want and not what YOU want.

I for one give lots of suggestions, it does not mean you have to be influenced to take them, they are there for you to decide if any thing interests you, and you want to take it forward, or thing nope not for me.

Lastly, if you go one route, and wished you went another, you can always change YOUR mind (not others change it for you 🙂 ) Enjoy the journey. Do not let it pressurise you do it to enjoy it, when it becomes a chore, take a break, and come back mojo full on, otherwise it can drain.

Sorry I wrote so much, but I hope just one of my points help you to a successful layout that you love.

Jaz Avalley

Model Railway Discussion Group

https://www.facebook.com/groups/495282280644117/
Reply 2 0
Bryan Lane Bryan.Lane
Hi Jaz,

Many thanks for taking the time to write a reply to this topic and offer your knowledge and experience to help me with my plans for Pevenbourne, it’s very much appreciated.

I’m certainly in agreement about planning ! This railway has been in planning for three to four years so far, but I’m glad to say is really picking up momentum now I’ve moved house that has a room to become the railway room. I’ve thought about some of the issues you mention, I come from a maintenance background so always think about future maintenance needs, there will be a couple of strategically positioned removable bridges so that I can reach every part of the railway. This means that not only will I be able to reach everything to maintain it but - and this is important as I get older (it’s a retirement project after all), I can access everything without having to get on my hands and knees. This will be an important factor as I make my final selection for the types of control gear, point motors and everything else that supports the operation of trains on the railway. And I have to say, posting in this Forum has been very helpful in this respect.

Thanks for your experiences with the Helix. This could be an interesting challenge on the railway and a crucial one as it will be the link between the storage area of the railway and the running areas. Current thoughts are that it will be double track, using Code 75, the outer one will be 630mm radius and the inner at 570mm. From this you’ll note my choice of 60mm track spacing. I’ve also taken onboard the recommendation from AHJAY about PowerBase. I’ve set up a board with 4 x 180 degree semicircles of track at 630mm, 570mm, 510mm and 450mm. I’ve trialled run Joeuf Mk3 coaches around the semi-circles (the longest coaches I have) and there is full clearance so that’s what my track plans are based upon. There is one exception, a straight double track section with a junction spreading from two or four tracks for a station. This will use standard Peco 55mm track spacing and I’ve already purchased the Code 75 junction from Pat (PC-Recycler) on e-bay.

As you say, there are so many points to consider. Thanks again for adding your contributions for my consideration.

Kind regards,

Bryan
Bryan Lane
Pevenbourne Model Railway 
Eastbourne
Reply 2 0
Pad-Ply-Pen
Hi Bryan 
like your self I also have been planning a layout as a retirement project planning started a long time ago much to the bemusement of my other half and various sellers of various properties we visited when the vendors best efforts of tidying up fresh flowers smell of freshly baked bread etc and all the other tricks of the trade were meet with a strange request for access to the loft!!
I am hopeful of making a start in the near future DV and have tried to plan ahead 
and have most of the basics in place.
 The current situation is the second attempt to get things right re the loft the first  a half baked was half attempt using hardboard to sheet the roof  in no insulation and poorly constructed baseboards lessons hard learnt is measure twice cut once ie
Be a wise man learn from others experience and methods and appreciate the advice given on forums such as this (look past all the poor puns and jokes including 
mine)
My interest was always there but in the December 1963 Railway Modeller a article on the Great Westmark Railway was the catalyst.
Since then I have dreamed of a GWR layout and in the last few years made a start 
again inspired by a 
layout in the Railway Modelling in the past few years based on Exeter by a father and son his name escapes me at present but but his design came closest to what I was planning and adapted accordingly so many thanks to all for their inspiration including Mick of Deadmans lane fame for his fiddle yard which struck a cord with me and is the starting point to learn the wiring process.
I doubt if I will get this project finished age and time against that,but it is worth the effort pictures on my album are titled MADNESS which is true as the wiring scares the life out of me.
One thing I made sure of was the ability of being able to move the cross support s for the baseboard to be moved using a L shaped edge rather than fixing permanently to avoid points then fixing see photos 

PPP
Reply 2 0
Pad-Ply-Pen
EEC75F93-2C10-4009-99BB-86BE4E09DB11.jpeg  E7CE679A-C5CA-482C-A1D7-49A3BB26653B.jpeg  0FA5C3F5-79E8-4A4D-87AB-D224DB4F042A.jpeg  5E740782-028C-48EF-8D1B-FE69528CA35B.jpeg  64D25D5A-BC73-4597-B55E-7CD84DD72E2E.jpeg  84FB7D7E-A99A-4253-8B33-8301FF955084.jpeg  319AD6E5-BA71-44B5-BEE0-ABF3A4740EA8.jpeg  DC4E28C6-B89A-4719-9F76-80465F72BC3B.jpeg 
Reply 1 0
PeteA
Hi Bryan,

As a fairly recent retiree (31 Dec 18) I would offer the following words of advice- which is not as contradictory as it may at first seem!
1. To quote Sir John Harvey Jones (TV’s ‘The Troubleshooter’: “Planning is an unnatural process; it is much more fun to do something. The nicest thing about not planning is that failure comes as a complete surprise, rather than being preceded by a period of worry and depression. 2. However, according to the old military adage, “Even the best laid battle-plans rarely survive first contact with the enemy”.
In short, planning is good - but don’t be afraid to change your mind in the light of events.
3. At the end of the day, it’s your retirement project: and you should enjoy it - not be a slave to it!
Reply 4 0
Pad-Ply-Pen
FYI
The last 3 photos are intentionally upside down for Southern Hemisphere Modellers 😀
Reply 5 0
Reply