I thought with the competition now over and my efforts return to progressing the layout in general rather than just the Scopwick Signal Box section I would insert the competition final entry in here to update this thread before progressing further.
Introduction
I think, as railway modellers, or indeed any kind of modellers, we are always motivated for the ultimate in realism. On our railways we may be striving for the best possible realism as regards operation and the closest we can get to a real timetable or we may be looking to achieve the most realistic make up of train formations including those rare and interesting items of rolling stock only obtainable by scratch building. Some of us however are looking for the most realistic modelled representation of the real thing that we can achieve by any means available. Those means nowadays manifest themselves as the most superb miniature representations of buildings, scenery and rolling stock we could ever imagine as well as procedures, materials and electronic wizardry we could not have imagined only a few years ago to help us achieve them. One aspect however of true scale railway modelling that has remained exclusive to only those of the highest calibre of scratch build modellers has been functional point rodding. Plastic kit representations have been available for some years but operational rodding has remained in the hands of only the most committed and skilled of modellers who have had to build their own parts from their own plans and materials. Now, for those of us who want to enjoy seeing point blades moving slowly and smoothly under the power of their very own rodding system, propelled by a motor hidden underneath the realistically positioned signal box, can avoid the lengthy process of building their own system from scratch and take advantage of the readymade system from DCCconcepts. When used in conjunction with the Cobalt SS motors to provide the smooth, slow, quiet and very realistic operation the potential to achieve realistic operational rodding is now within everyone's grasp.
Planning
I had already identified a spot on my layout that was perfect for testing out such an installation. There was a crossover between the two main loops next to a siding off the suburban line that gave me three points in close proximity and was perfect for testing out an installation of operational rodding. The layout had been built with the philosophy in place that the electronics were going to be mounted on the surface because below the board was generally inaccessible.
This had naturally lent itself already to the use of Cobalt SS motors and a period of testing them with simple local linkages had proven their reliability already so it was time to start thinking about the rodding arrangement and the relocation of the motors to a more suitable location. The ideal position simply had to be inside a signal box to give the ultimate in credibility to the arrangement and to push the thinking towards using the rods to operate the points rather than have them simply pushed by the point blade in a 'following' fashion.
The planning phase therefore ended up with a signal box in the location of the points with three Cobalt SS motors fitted underneath it with appropriate rod runs to the three points. This was going to entail rods going below the tracks for the best scale appearance as I particularly wanted to maintain as close a scale operation as possible. This meant not using the luxury of the thin wire inside the plastic tube means of going below the track but the creation of a bespoke arrangement using the existing rods passing through gaps in sleepers in much more of a prototypical manner. I also decided at the design stage that I wanted some lighting in the signal box and nearby area and I wanted an operational signal to protect the line in front of the signal box, which was an additional siding leading to a goods shed.
Interestingly only within the last few years a local signal box was removed from a level crossing over the railway line closest to my current home. This one was unusually lucky however and rather than succumbing to the demolition squad in line with most such structures up and down the country it was dismantled and rebuilt only a few hundred yards away in a garden that is extensively equipped with a large live steam railway system. The signal box that used to be at Scopwick therefore became the inspiration for the competition scenario and gave the entry its title. I was even able to obtain some internal photographs of the signal box to enable a fairly realistic representation of the internal detail when it came to the build.
The Build - Setting Out
With the ideas all in place it was therefore time to start the build. The track was laid on Gaugemaster 3mm cork underlay mounted on an area raised from the main base board by 50mm. The track was glued and pinned in place with all pieces of track having their own individual droppers soldered to the base of the rail. The droppers were all led out from below the raised area of base towards where the electronic controls were to be located and the nearest bus connection would be installed. When the track was all in place the location of the signal box was identified and the three Cobalt motors were screwed down and again the cables led through the raised base to the area of the control box. Extension cables and reversing extensions were fitted where appropriate and the cabling all tested after connecting up to the control unit. While it would have been the perfect scenario to scratch build the signal box to be an exact replica of the Scopwick box I also had to be realistic and consider the time frame for the competition. While a build time of four months might initially seem like a generous amount if time I was well aware that this would disappear very quickly and so realised that compromises would have to be considered. Consequently a readymade Bachmann Scenecraft box was used as a base for modification and enhancements to be added, which I thought was better use of time than putting a scratch built structure together.
A detailed interior was created, assisted from kit supplied parts, with interior lighting and additional lighting outside the box. A figure was used to add life and a change of colour scheme was applied to match the green used by the LNER in this area.
The Build - Rod Installation
While the box was being worked on the rod systems were also being installed. I wanted the runs to look as realistic as possible so I wanted them to follow the edge of the track and I wanted them to cross the track in an appropriate gap between sleepers.
The stool heights were adjusted to ensure that the rods sat on top of the underlay and care was taken to ensure that the movement of the cranks were free and not able to interfere with each other.
While real life pictures showed in many cases cranks very closely mounted together this proved to be difficult to achieve in model form when the movement of the point blades is significantly greater than in real life. With the cranks also being slightly greater than scale size care had to be taken to ensure that they all worked smoothly. Another point to remember is that while the supplied instructions advise glueing the stools down while fitted to the rods the flexibility of the rods can allow deformation to occur so whether fitted to the rods or loose the stools should best be fitted against a straight edge.
If the curve of a track is to be followed then some sort of flexible guide should be set up to ensure a perfect consistent run of the rods. The stools were all then glued down to the base with a spot of neat PVA glue. During this process it became apparent just how critical it is to ensure that the cranks operate throughout a realistic arc of operation. This invariably means that completing the connection to the motors and the point tie bars should be done last to try to obtain a neat and square attitude of the cranks when in their 'normal' position. Also important to consider here is how to mount the crank bases. Once the appropriate height of crank has been chosen and the correct operating attitude has been identified it is then possible to determine the position of the crank posts. Having done some testing with the pins supplied with the kits I decided that the risk of damage to the cranks was too great and, as the bases were going to be covered in ballast anyway I decided on using a two part epoxy glue to secure the crank bases. The centre spot was lightly drilled by hand to give an indentation for the protruding pivot to sit in and the crank secured in position and left overnight to cure properly.
Also during the rod installation it soon became obvious that a method of extending the length of the rods was going to be required.
The rods were measured up across the cross sectional area and while square tube would have been perfect it did not seem to be available in such a small size so a round brass tube of 0.5 mm internal diameter was obtained. This made for a neat enough socket to look unobtrusive but credible and gave the installation the flexibility to operate points at any distance from the motor. The joint held the rods closely enough to maintain their alignment and were secured easily with a spot of very thin cyanoacrylate glue once positioned. The rods were also glued to the cranks with cyano glue and then the connections were lightly crimped to secure them. A thicker version of the glue was used here as the very thin type has a potential to go off into every little nook and cranny when capillary action takes hold and you run the risk of the end connection becoming seized.
The glue was applied very sparingly with a cocktail stick. When it came time to start the testing of the points one or two things came to light that are probably worth mentioning here. First up is the necessity for care and attention to be applied to the installation. Not only do you want it to look good but, ultimately, it must work consistently and reliably so the quality of the installation has to be there. This requires the positioning of the cranks to ensure that not only do they not interfere with each other but also that they do not travel so far as to cause the rod end connections to rotate beyond their free movement. The rods must all also be very free in the stools and the best way to be sure of this is to check them by hand before they are connected to the points or the motors. The first time one was connected up and tested it proved to be tight, despite all the precautions, so I took the decision that lubrication was going to help. I also did not want to introduce any further loading, as experienced with radio controlled model boat propeller shafting, and decided that grease applied to every stool and crank could create this. I therefore went for a very light oil and painted it on each stool transition with a very small paint brush and at all the moving parts of the cranks. The operation instantly improved and the points then moved realistically and smoothly. The points themselves were lubricated with a very light application of heated vaseline where the tie bars run against the frame and where the blades sit and run on the pads on top of the sleepers. This would also keep paint away from these areas when it can time to paint the track and ensure that the operation was not compromised.
The Build - Scenery
Once the rods, cranks and stools were all installed and proven to be reliable the scenic part of the project could be attended to. I wanted to enhance the appearance of the rodding installation by the addition of more rods so Ratio kit facing locks were added to the track at the points and these were used in conjunction with the kit supplied cranks but connected with DCCconcepts rods and stools. This gave a much busier look to the area, particularly in front of the Signal Box and added some realistic detail at the points themselves which subsequent weathering would also enhance and add to the levels of realism.
To then provide an access walkway over all the rods for the signal box personnel to walk over a platform was built and fitted to the area in front of the box.
It was then time to turn attention to the base coat painting of the area and so, after some test areas were done on scrap track and spare baseboards, the rods and associated installation were masked and the track was all sprayed initially with a Railmatch spray can of Sleeper Grime paint.
This paint was a suitable base for ballast to be laid on, which was a mixture of Woodland Scenics Fine Ballast Grey Blend mixed 2 to 1 with Legacy Models Legacy Ballast in 4 mm scale Light Grey Blend.
The cess area was to be covered later carefully with a blend of the same light grey ballast mixed 1 to 1 with Legacy Ballast in the brown colour. This had to be carefully arranged with a soft brush around the rods and stools before applying a watered down PVA glue, which soaked into all the nooks and crannies of the stools and crank bases.
During this time of applying the ballast and later when painting the track areas the rod systems were tested frequently to ensure that nothing interfered with the smooth and reliable operation of the points. The rodding installation was also masked off before being given a base coat of an acrylic light grey paint, applied by airbrush, to simulate a base colour of galvanised steel.
While the process of ballasting the track was progressed the scenery in the background was also worked on. There was actually only a small width of area behind the track before the backscene so careful use had to be made of this to ensure a feasible scene was created that blended into the backscene picture with some credibility. Low relief buildings had some further details added before being painted up to bring them all in line tonally. A narrow path was added to the front of the terraced houses, which was fronted with a brick wall that allowed continuity across the front of some low relief warehouses.
Around the signal box some gentle ground relief was added as well as a stone wall across the lower edge of the backscene. A street lamp was also added to the front of the terraced houses, connected into the same circuit as the signal box lights, to provide a little warmth and life to the area. The lighting system chosen was the Just Plug system by Woodland Scenics, partly because the distribution items could be neatly contained in the local control box but also because groups of three lamps could be individually dimmed to give a nice realistic effect. This, in the future, will enable groups of three lamps to be fitted to such items as the goods shed and the engine shed.
Vegetation was then added to the area surrounding the signal box, paying particular attention to continuity with the vegetation in the backscene. Pine trees were cut in half and planted in front of pines in the backscene and other autumnal coloured trees were placed in front of similarly coloured trees in the picture. Grasses were planted in a random manner around the signal box and in between the trees as well as in more scattered random clumps on the cess area of the track and around the terraced houses. Once the grasses were all in place common builders sand was applied to the bare earth areas around the signal box and the ballast was added to the cess areas of the track around the grass and the rodding installation.
The Build - Track Painting
The painting of the track was the next significant job and, after much trial and testing again with scraps of track, a colour scheme that was as close to real life as could be estimated was applied by airbrush. The overall track colour was a Precision Paints 'Brake Dust' enamel and then down the edge on the insides of the track a band of Railmatch 'Roof Dirt' enamel was applied. Care was taken at this point to try to differentiate between the different types of track with the up line and the down line displaying quite different levels of weathering and the crossover and points to the engine shed being much more heavily weathered. It was the density of the Roof Dirt more than anything that was varied to provide the varying degrees of weathering. The cess area also received washes to add shading and tonal variation and the point rodding was weathered up with a combination of dry brushing and felt marker pens. The pens were also very lightly dragged over the track centre, particularly around the crossover area to give a very credible effect of oil dropped on the track. The overall effect ended up being quite pleasing and realistic and clearly showed variations in levels of weathering and colours. It also showed what a wide range of effects could be achieved with only two enamel colours, a couple of weathering powders and two 'Sharpie' marker pens. It also emphasised again the importance of trying such unknown techniques on a test piece before committing to the actual layout so you can approach what might seem like a daunting operation with quite a degree of confidence.
With the track painting completed the rods and cranks were very gently weathered by applying patches of thinned down roof dirt enamel to the ballast around the crank bases and a very light dry brushing of Humbrol Gunmetal to the cranks and the facing locks was added.
The Semaphore Signal
The last operational piece of the installation was the home signal to protect the run to the goods shed past the signal box so a Dapol electronic signal was fitted to the track before the signal box and was connected to a decoder, mounted in the electronic box nearby. This enables the signal to be controlled from the main control system and can be operated at precisely what moment in time is required. The installation was extremely simple with nothing more than a 13mm hole required in the base board and the cable led to the decoder. The signal base was covered with ballast and blended in with the surrounding area.
Final Details
Final small details that really bring such a scenario to life were added in the shape of a grounded van, painted up and weathered with damage to the roof covering showing and a pushbike leaning against it. The ground around the signal box that was covered with builders sand was painted up with varying tones of thinned brown enamel to simulate a bare earth. A couple of speed restriction signs were also added to the track to provide a little more detail and visual interest. That just about completed the build of the point rodding scenario. The final step of the project was to try to create an operational scenario that demonstrated the operation of the points and which could then be used to create a video.
The Video
Bearing in mind that the first principle of the competition was to create something realistic initial attempts at producing a simple video were centred mainly around the operation of the point rodding itself. While this does suitably show the operation of the points it ended up looking a little too focused and the atmosphere of the area was being lost.
https://youtu.be/KScHaVeGj98
https://youtu.be/7Npob91lXrQ
Eventually without having access to panning cameras and sophisticated lighting set ups a camera location was selected that managed to crop out the unbuilt areas of the layout while still containing the area that contained the points. A wooden bridge was built to go over the track, which the camera could sit on and a lamp with a daylight bulb in it was shone on the area. Unfortunately the depth of field ended up being quite shallow so this had to be arranged to be at the crossover of the tracks. I decided that two passing locomotives on the main lines should be timed to cross at the crossover to demonstrate that the points were all in the 'normal' position before operating the crossover and the siding point to enable a shunter to emerge and cross the tracks. This would then show that all three points had changed however visually the operation of the points and the rodding was far from obvious. This was rectified by the addition of a shot that showed the movement of the cranks and the point blades before going back to the shunter as it made its way towards the goods shed in the distance. The semaphore signal then operates to allow it to progress to include the operation of all the functionality of the project. So the final stage of the project was to set up three weathered locomotives with suitable rolling stock and practise an operational scenario that can be repeated in front of a camera. Timing would be crucial to prevent unacceptably long pauses in the movie so plenty of practise to get the crossing point spot on as well as everything needed to be in place and ready to move when required. The two counter rotating locomotives were set up extremely delicately so that I knew that they would cross at just the right point and the controllers were marked with tape so I could recreate the operation again.
This is the final result:
https://youtu.be/sVw1iCvLcto
In Conclusion
While initially the competition may look, on the face of it, as a simple contest between modellers to produce the best result, seeing it that way would be to not only miss the point but, more importantly, to miss out on the wealth of learning that the project has to offer.
Seeing it simply as a contest would put the entrants into a position of striving hard to outdo each other as a means of achieving the best possible outcome. To really get the best out of the contest however I believe it should be viewed more as a group of modellers trying to do their own best, against themselves. I have always believed that modellers have a wide range of skill sets, experiences and abilities and sometimes it is easy for us to forget that we all started with none of these. My own first Airfix kit was glued together when I was around five years old in about 1962 and I was very proud of it. I often think back now to what made me want to put that kit together and be so proud of it and I can only think that it must have been my father's influence that planted that first seed. I now therefore look at where I am today and feel that it is my turn to inspire those new to modelling to similarly have a go. I have always believed that human beings get the most satisfaction from creating something. Whether this is a poem, a sponge cake, a custom car or a model of a railway station does not matter, we still all enjoy the satisfaction gained from creating something. The more experienced modellers now owe it to the less experienced ones to see what can be achieved and how we can achieve it. The interesting aspect of this competition from my own point of view is that, while I may have been modelling for many years my experience of railway modelling is basically zero. I have never ballasted track before, I have never painted track before, I have never had to get my head around DCC control systems and only a few short months ago I had no idea what a point rod was, never mind what it did! All this has had to be learned and applied. Tests have been done extensively on just about every aspect of this project to the point where I think I have probably built it twice.
It is also worth remembering that there is more available to us nowadays than ever before to help us achieve our goals, whether it is books, DVDs, internet based such as forums or training courses. So make use of them. I attended a couple of training courses to learn how to overcome my fear of airbrushes and improve my weathering techniques. I cannot understand why I left it so long.