Bunkerbarge
My apologies to all who have already seen this layout on other forums but, as we are just starting up and as we are looking at getting some archive material together I thought I might post it on here as well.  Apart from which I am using DCCconcepts equipment so there is a whole new area of interest here, when we get to that point!

I thought I might start off with a couple of pictures of the base board, built now around a year ago.  The base is Wickes Kitchen units on one wall with cut down MDF book shelves on the opposite wall with cheap B&Q doors on top of them.  This means the underside of the base is not available however I intend having almost all of the layout at higher levels above the base.  The original intention was for the outside mainline ring to be at 100 mm above the base, a lot of the next level down to be at 50 mm and there was then going to be low lying areas at 25 mm.  This however all changed!  A few bits and pieces such as a canal basin would be on the base board itself.  This meant that points motors and wiring was not going to be immediately accessible after the layout was been completed although it was anticipated there should be little damage needed to get to anything.

The west wall needed completing with the six inch wide shelf that was to hold the outer main lines but that will be done when the rest of the shelf is fitted.  This was to give a complete ring, needed for what was going to be the live steam line.  This has also since been changed!


2063_261513_470000000.jpg  2063_261515_550000000.jpg  2063_261516_140000000.jpg  2063_261516_290000000.jpg  2063_261516_470000000.jpg  2063_261517_030000000.jpg  2063_261517_190000000.jpg   

Reply 4 0
Mister Rusty
A very nice 😝 to us, methinks
🤣
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 0 0
Bunkerbarge
Well the trackside team have now completed the path around the grounded van so Taffy and Frank can have easy access to the workshop it contains and, slightly further along the line, will be the token exchange gear.  They also completed the gravel path to the rodding platform across the front of the box therefore ensuring no one gets mud on the floor of the signal box!

P1060051.jpg 

P1060052.jpg 
P1060053.jpg 
Reply 1 0
JB
Love the detail , amazing well done.
Reply 0 0
Briperran
😂 Poor Taffy and Frank they have nothing to moan about now to the management as they will no longer have muddy feet

Brian
Reply 0 0
Bunkerbarge
You're telling me a Yorkshireman and a Welshman are not going to be able to find something to moan about!!
Reply 1 0
Julian
Blimey!!  Call Ef' n Safety, that bike's a real 'azard, left on the corner like that.  Next time they go to set up a Token Exchange there'll be a right set to about woo left it there!

Seriously, what a delightful scene that is.

Regards

Julian
Reply 0 0
Bunkerbarge
Nothing too exciting but I do like a recycling opportunity.  For those of you who remember reading the competition thread might remember the fact that I destroyed a Dapol working signal because I made the hole too tight.  I also wanted to add a token exchange station somewhere near the signal box to add a little detail and give the single line a bit of credibility so a dig around on the internet found a few pictures.  They made me realise that they were little else than a couple of posts with lamp brackets on them shining on the tokens.  The broken Dapol signal post would be perfect for one of them so I stripped the arm and levers off it and made that up into a token catching post.  It already has the lamp and steps fitted, typical of most of these units.  All I have to do now is make up a solid post with a spare lamp and token bracket on it to go next to it.    

The catching arm is a piece of stretched sprue, the frame is scraps of wood cut up and the mesh is a piece of mossie net, pinched from the corner of one of the vegetable borders from the garden!


P1060088.jpg 
Reply 2 0
Bunkerbarge

Well I had really wanted to progress the North West corner of the layout and join it into the work recently completed on the Competition Entry section.  Unfortunately the brick goods shed from Oxford Rail, which was announced last Autumn, and which I pre-ordered still has shown no signs of arriving and Oxford Rail seem completely incapable of phoning China to find out when they can possibly expect to receive their items.  How UK companies can allow the manufacturers to dictate terms like this and not even bother to follow up and hold them accountable defies belief.

So I have changed my attentions to the North East corner, which is going to be a gas works.  This is driven by the fact that there is a large wooden newel post in this location and the Bachmann half relief gas holder model will hide it perfectly.  Plus I really like the idea of a gas works as I can incorporate lines into the works and it lends itself to some very interesting rolling stock and buildings.

The big problem is the fact that the North East corner is above the stairwell and so doing anything there requires me to straddle the open staircase while I lean forward to reach the area.  Doing anything delicate right at the back would be extremely difficult. 

P1060263.jpg 

Consequently I decided to create a module out of ply, that will eventually drop into the corner and be simply glued down.  Thus everything can be built onto the module off the layout until it is all completely finished and ready to place.  I therefore made a paper template and transferred this to ply to make a base and started to design a gas works.  The line in from the main line will back into the yard so I knew the couple of basic points I needed was a run around and loading and unloading areas for coal, ammonia, coke and tar.  I also planned on having a road way enter the yard from the North wall so a loading platform would be appropriate there.  Research has unearthed some useful and interesting arrangements, some from the 1930s!, so mine will incorporate the inlet siding through a gated wall.  Off this will be a siding for loading coal directly into the retort house before the line follows the main line curve into a run around siding.  The Northern line of this will double as the loading platform for the road vehicles and the tar, coke and ammonia will be loaded around here as well.


P1060265.jpg 

The track was laid onto the ply base with droppers attached to each piece of track.  The Cobalt SS controller will be mounted below the retort house and the run around points will be operated consecutively from one channel and the retort house siding will operate from the other channel.  The point from the main line still has to be decided where that is going to be controlled from.

P1060266.jpg 
With the track in place it is now time to start fitting Cobalt SS motors and decide on a more exact design of the layout of the other structures.  These will include the water tower, the tar tank, the ammonia tank, a filter bed, a washing tower a coke store and one or two yard buildings.

Meanwhile I have made a start on the retort house, which I will describe in more detail in a separate thread.

 

Reply 1 0
SmallScenes
Only just getting around to looking at some of these threads.
Superb work, and the sentiment of inspiring and helping others is something I'm rooted in.
I remember an American at a modelling competition saying "It's for me to know and you to find out"
Yet I knew a guy who would not only tell you how he did it, but bring in components and show, letting
you try under his 'supervision'. I know which I admire !

Geoff T.
Reply 0 0
Bunkerbarge
Even for a relatively new forum there is already a lot of interesting and useful information in the archives.  I'm sure this will be added to over time to form an invaluable collection of research material.

As for the "It's for me to know and you to find out" chap, we've all met them haven't we?  I'm also convinced that the reason they don't tell you what they know is because they don't actually know as much as they like to make out they do!!  Ã°Å¸ËœÂ
Reply 1 0
Briperran
Richard i assume you entirely using the cobalt ss motors on the entire layout is that because access would not be easy on your layout if standard under baseboard ones were used?

Brian
Reply 0 0
Bunkerbarge
Hi Brian, precisely.  Because my layout is in a separate building I had to create some storage over there so I put the layout onto kitchen base units to give me the storage.  I always knew that this would mean that the majority of the electrical installation would then have to be above the main base boards.  The price I knew I had to pay.  To be honest I don't think it is going to be as bad as I first thought and certainly not as bad as the old guard die hards had me believe.  I just have to put a bit more thought and planning into the layout building to ensure that electrical components are mounted below buildings or removable pieces of scenery.  The bus will be sealed in but there will be access points around the layout with available spare bus terminals for future modifications.  I have access under the shelf that runs along the side of the staircase so I used a couple of IP digitals there but that is about the only location I could use them.  I think just about every other point motor will have to be a Cobalt SS.

This corner module is a perfect example of where I have to build everything off the layout, test it for operation and prove everything before simply dropping it into place on the layout.  All that will have to be done then will be to plug in the lighting cables, attach the end of the track to the point in the main loop, connect the two bus cables and tidy up the blending in.
Reply 0 0
Mister Rusty
I do so envy your construction.  
Updating Buchshee means that a lot of thought is spent minimising modifications to what is there, and how to blend on future phases.
It gets to be quite a challenge. 
Having seen your installation under Scopwick box, l await the next saga with interest.
Now that Buchshee is up and running, my next project is under way, it's riveting! 
Bunkerbarge,
I am locked out, hooked up on your last message, this is the only way that l can get into the forum.
Anyone else having issues?
Please check.
Could anyone reading  this, please advise Jazavalley or another admin , thanks
Be careful, in case it's a virus. The message received is:-
The last email that was sent to you was returned as spam by your email provider. Please update your account with a valid email address. Ahjay said  that my details are all in order, correct address and all.
Pete
Reply 0 0
Briperran
On many fixed layouts compromises have to be made due to the location of it i know i myself have had to make some.
Your solution to the electrical part is good and i dont see any problem with it part of my previous layout had to be done electrically in the same way.
Building a layout often requires thinking outside the box and not being led by others that are set in their ways of doing things.
I think its fair to say in years to come if health started to fail you will be extremely pleased you installed the cobalt ss motors and not be concerned how you are going to get to work on hard to get at under baseboard ones.

Brian
Reply 0 0
Bunkerbarge
I completely agree Brian.  Building on top of the base board also forces you to be that bit more organised with the electrical installation and put a little bit more planning into it and DCC has a huge benefit here.  I am happy to accept never being able to access wires again and any future modification can be made with new cables and a bit more scenery to hide it.  Sometimes when I am setting up items such as points control I consider myself to be very lucky that the components are not below the board and I'm laid on my back with a torch in my mouth!!
Reply 1 0
Reply